Removing and installing port and application blades 69
Time and items required .........70
Removing a blade ...........70
Installing a blade ...........71
Removing and installing blade filler panels....72
Removing a filler panel .........72
Installing a filler panel..........73
Removing and installing a CP8 control processor
blade ................73
Time and items required .........74
Verifying the need for replacement .....74
Recording critical SAN768B-2 information . . . 75
Removing a control processor blade (CP8) . . . 76
Installing a control processor blade (CP8) . . . 77
Verifying operation of the new CP blade....78
Downloading firmware from an FTP server. . . 79
Downloading firmware from a USB drive . . . 81
Completing the CP8 blade replacement ....83
Removing and installing a core switch blade
(CR16-8) ...............83
Time and items required .........84
Verifying the necessity of installation .....84
Removing a core switch blade (CR16-8) ....84
Installing a core switch blade (CR16-8) ....85
Removing and installing a power supply ....86
Time and items required .........86
Removing a power supply ........86
Installing a power supply ........87
Removing and installing a blower assembly . . . 88
Time and items required .........88
Removing a blower assembly .......88
Installing a blower assembly........89
Removing and installing a WWN bezel and WWN
card.................89
Time and items required .........89
Verifying the need for replacement .....90
Removing the WWN bezel and WWN card. . . 90
Installing the WWN bezel and WWN card . . . 91
Removing and installing transceivers ......92
Time required ............92
Items required ............92
Removing and installing an SFP+ optical
transceiver..............92
Removing and installing an mSFP optical
transceiver..............94
Removing and replacing inter-chassis link (QSFP)
cables ................95
Time and items required .........97
Removing an inter-chassis link (QSFP) cable . . 97
Installing an ICL cable..........97
Possible ICL configurations ........98
Removing the batteries ..........100
Removing and replacing the chassis ......101
Verifying necessity of replacement .....102
Preparing for a chassis replacement .....102
Disconnecting the SAN768B-2 from the network
and fabric .............105
Removing components from the chassis . . . 106
Removing and replacing the chassis from the
cabinet ..............106
Installing components into the new chassis . . 107
Downloading the configuration ......108
Verifying the correct operation of the system 108
Reconnecting the system to the network and
fabric ...............110
Verifying the correct configuration of the fabric 110
Cable routing tables ..........111
Chapter 6. Installing new features . . 115
FC3632, FC3648- Installing a 16-Gb port port blade
(32 or 48 ports) .............115
Time required ............115
Items required ............115
Procedures .............116
FC3864 - Installing an 8-Gb 64-port port blade . . 117
Time required ............117
Items required ............117
Procedures .............117
FC3890 - Installing an FX8-24 extension blade . . 119
Time required ............119
Items required ............119
Procedures .............119
FC7871 - Installing a QSFP and inter-chassis license 120
Time required ............120
Items required ............120
Procedures .............120
Appendix A. Product specifications 123
General specifications ..........123
System architecture ...........123
System size and weight ..........126
Facility requirements ...........126
Power specifications ...........127
Environmental requirements ........128
Fibre channel port specifications .......128
Data transmission ranges .........129
Powercords..............129
Appendix B. Application blades . . . 131
FX8-24 blade .............131
Appendix C. Diagnostics and
troubleshooting ..........133
Obtaining chassis and component status ....133
Interpreting POST and boot results ......134
POST...............134
Boot ...............135
Diagnostics ..............135
Troubleshooting ............135
Appendix D. Blade port numbering 139
Notices ..............143
Trademarks ..............145
Electronic emission notices .........146
Federal Communications Commission (FCC)
Class A Statement ...........146
Industry Canada Class A Emission Compliance
Statement .............146
vi SAN768B-2 Installation, Service, and User Guide