Seastar Solutions HA5456 Installation guide

Type
Installation guide
Copy Part# 470718, Rev. B, 02/2014 Page 1 of 3
INSTALLATION INSTRUCTIONS
© 2003 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS 3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6 Fax: 604.270.7172 Web: www.seastarsolutions.com
PURGE KIT # HA5456
SeaStar Power Steering
Not all systems are exactly as shown.
NOTICE
Kit Contains:
ITEM PART # QTY DESCRIPTION
1 291021 1 5/16" ID Clear Plastic Tubing
2 430315 1 Male, Quick Connect Adapter
3 800111 2 Fitting Quick Disconnect
4 800114 1 Fitting Quick Disconnect
Figure A.
4
RELEASE AIR
PRESSURE
SERVO BLOCK
VALVE
2
1
3
Copy Part# 470718, Rev. B, 02/2014 Page 2 of 3
INSTALLATION INSTRUCTIONS
© 2003 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS 3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6 Fax: 604.270.7172 Web: www.seastarsolutions.com
Step 1
• Ifrequired,releasetheairpressurefromthereservoirbypressing
theairvalve.
•
Removethereservoirfillplugandfillthereservoirtowithinan
inchofthetop.
Step 2 •Replacethefillplugwiththeenclosedmalequickconnect
adapter(item2).
•Usingabicycletirepumporsimilardevice,pressurizethe
reservoirto30PSI.Ifnecessary,refillandpressurizeuntilthe
fluidlevelstabilizesatorabovethemaximumlevellineonthe
reservoir.
•Connectoneendoftheoilbypassline(item1)tothequick
connectadapteronthereservoir.
Step 3 •Gotohelmstationclosesttothesteeringcylinderandturnthe
steeringwheelclockwiseuntilthecylindershaftfullyextends
orretracts.
• Ifrodisfullyextended,attachthebypasslinetotheHSlineon
thecylinderservoblockandopenbleedfitting.Ifrodisfully
retracted,attachthebypasslinetotheHPlineonthecylinder
servoblockandopenbleedfitting.
Step 4 •Movetothelowesthelmstationorthehelmclosesttothe
cylinderandbeginturningthesteeringwheelcounterclockwise
ataonetotwosecondperrevolutionpace.
•Continueturningforapproximately80revolutions.
•Repeatthisprocessateachsuccessivelyhigherstation.Ifan
autopilotisinstalleditshouldbetreatedasanotherhelmunit
exceptthemotorismadetoruncontinuouslyforatleast
2minutesinonedirection.
Thiskitprovidesawaytobypassfluidbetweenthepowercylinder
bleedfittingsandthesystemsreservoir.Withthebypassline
installed,fluidandairfromthebleederisdivertedtothereservoir.
Airenteringthereservoirstaysatthetopandairfreefluidis
returnedtothesystem.
Includedinthispackageyouwillfinda25footlengthof5/16”ID
clearplastictubingwithquickconnectfittingsinstalledatboth
endsandaquickconnectadapterforthereservoir.
Before continuing to a higher station, check the fluid level and air
pressure in the reservoir. If the fluid level is below half, release
the air pressure and refill to the maximum level line and pressurize
the reservoir to between 25 and 30 PSI.
NOTICE
Copy Part# 470718, Rev. B, 02/2014 Page 3 of 3
INSTALLATION INSTRUCTIONS
© 2003 Marine Canada Acquisition Inc. DBA SEASTAR SOLUTIONS 3831 No. 6 Road, Richmond, B.C. Canada V6V 1P6 Fax: 604.270.7172 Web: www.seastarsolutions.com
Step 5 •Closethecylinderbleedfittingandmovetheby-passlineto
thesecondbleeder.Openthebleederbyturninglooseningthe
bleedernut3/4ofaturn.
•Returntothehelmclosesttothecylinderandturnthewheel
counterclockwiseuntilthecylindermovestohardoverinthe
oppositedirection.
•Whenthecylinderreacheshardover,beginturningina
clockwisedirectionforapproximately80turnsataonetotwo
secondperrevolutionpace.
•Ateachsuccessivelyhigherhelmstation,turnthewheel
clockwiseapproximately80turnsataonetotwosecondper
revolutionpace.
•Whenfinished,closethecylinderbleedfitting.
Step 6 •Releasetheairpressurefromthereservoir.
•Removethequickconnectadapterandfillthereservoirtothe
maximumlevelline.
•Replacethereservoirfillplugandpressurizethereservoirto
between25and30PSI.
• Withthepowersteeringpump(s)running,turnoneofthehelm
pumpsfromlocktolockapproximately20times.Ifthepumps
areenginedriven,runtheenginesbetween600and800RPM
forhalftheturnsthenincreasetheenginespeedtoabout
1200RPM.
• Checkthefluidlevelinthereservoir.Ifitislessthanhalf,
releasetheairpressure,removethefillerplugandfilltothe
maximumline.
• Pressurizethereservoirtobetween25and30PSI.
Before continuing to a higher station, check the fluid level and
air pressure in the reservoir. If the fluid level is below half,
release the air pressure and refill to the maximum level line
and pressurize the reservoir to between 25 and 30 PSI.
If all the air is out of the system, when the reservoir is pressurized,
the fluid level will remain stable. If the fluid level drops more than
an inch and then stabilizes, the system should be purged a
second time.
NOTICE
NOTICE
Purging the Power Circuit
  • Page 1 1
  • Page 2 2
  • Page 3 3

Seastar Solutions HA5456 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI