Edsal ZB1500 Assembly Manual

Type
Assembly Manual
Instructions : ZB1500
Instructions : ZB1500
Instructions : ZB1500
-
-
-
Bulk Storage Rack
Bulk Storage Rack
Bulk Storage Rack
General Instructions
General Instructions
General Instructions
2 - Welded End Frames
6 - Beams
3 - Particle Board Shelves
Parts
Safety Instructions
Safety Instructions
Safety Instructions
Work Force Bulk Storage Rack is engineered to offer maximum flexibility as well as ease and quickness of assembly.
The rack units can stand individually, or for greater stability, be joined together using the common post. Individual
beams can be adjusted without disturbing the beams in adjoining units. These instructions should be followed exactly.
All parts supplied must be used as shown. Any alteration or deviation from this instruction sheet can result in unit fail-
ure. After the unit is assembled, it must be placed on a level surface for safety, and optimal product performance.
This storage rack unit must be placed on a level surface. Failure to do so can result in unit failure, poor product per-
formance, or a possible tipping” safety hazard. DO NOT STAND ON THE UNIT OR USE THE UNIT AS A LADDER !
DO NOT OVERLOAD ! Evenly distribute the weight on each shelf, and keep the heaviest loads on the bottom shelf.
Use care and the proper attire when working with metal parts.
Assembly Instructions
Assembly Instructions
Assembly Instructions
Attach the beams to the welded end frames as seen in
figure 1. Use both welded end frames to establish the
left and the right sides of the units. After a beam has
been placed to the end units, tap down with a hammer
to help drive the beam end clip tabs into the end frame
post slots to secure the beam to the end frame (see
figure 1). Note: If the beam end clip tabs become
bent due to mishandling. It may be necessary to
adjust the tabs back to their proper form.
The completed unit should have three (3) levels evenly
spaced for maximum stability. Note: Although the
beams are adjustable in height, it’s recommended to
evenly space them so that the stability of the unit is not
compromised.
After all beams are in place, place the particle board
shelving to each level to complete the unit
(see figure 2).
Particle Board Shelf
Beam
Beam End
Clip Tabs
Figure 1
Figure 2
End Frame Post Slots
End Frame Post
Should you have any comments, damage, missing parts, or problems with assembly of this unit please feel
free to contact our Work Force manufacturing facility at, (773) 475-3000 and request customer service.
To obtain replacement parts, please provide the following information :
- Model # - Part # & Description - Location Purchased - Date Purchased
Consumer Products Division
Edsal Manufacturing Company
4400 South Packers Avenue
Chicago, IL 60609
www.edsal.com
  • Page 1 1

Edsal ZB1500 Assembly Manual

Type
Assembly Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI