GreenBrook CB35D, CB35S Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the GreenBrook CB35D Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Installation Instructions for
Economy Service Connector Blocks
CB35S & CB35D
INSTALLER
- Please pass instruction manual onto
the owner of the unit
Please keep these instructions
for future reference.
GUARANTEE
Issue no: 707840
WEST ROAD . HARLOW
ESSEX . CM20 2BG . UK
Info@greenbrook.co.uk
WW W. GREE N B ROOK . C O.UK
Your GreenBrook Service Connector Block
is guaranteed for 12 months from
the date of purchase.
This does not affect your statutory rights.
IMPORTANT
This product should be installed by a
competent person and in
accordance with the current
IET Wiring Regulations.
If in doubt, consult a qualified
electrician.
INSTALLATION
Do not install or work on
this product live.
Remove terminal block(s) from mounting
box.
Remove knockouts appropriate for your
installation and fix mounting box securely
to a flat surface. Using single core cable
BS 6004 type 6181Y of the correct current
rating, 25mm2 for 100A, connect cable(s)
to the terminal block.
NOTE:
Only remove sufficient outer sheath for the
cable to pass through the mounting box
knockouts and remove sufficient inner
insulation.
Securely tighten both terminal screws on
each cable fitted.
Replace the lid and secure with one
screw, this is sealable to prevent
tampering.
Part No Torque Setting
CB35S 2.5Nm Screw Size M6
CB35D 3.5Nm Screw Size M8
TECHNICAL INFORMATION
Rated voltage: 230V AC ~ 50Hz
Operating Temp: -10°C - +40°
Material: Black ABS Plastic
Conforms To: BS EN 60998-1
& BS EN 60998-2-1
CB35D & S Blocks Ins Sept 23_Layout 1 02/10/2023 12:18 Page 1
/