Ankom A2000 Service Procedure

  • Hello! I am an AI chatbot trained to assist you with the Ankom A2000 Service Procedure. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Service Procedure # 002
(Page 1 of 3) 08/05/2014
Packing and Agitator Replacement
A2000/A2000I
ANKOM Technology 2052 O’Neil Road Macedon, NY 14502 PH: (315) 986-8090 FAX: (315) 986-8091
1. Place cardboard on a table. Lay the A2000 on
it’s front. Remove the nuts that secure the clear
back panel. Remove the panel. Remove the
feet and mounting screws, then remove the
bottom panel.
2. Loosen the top set screw on the coupler.
3. Loosen the packing nut until it is finger loose. 4. Remove the three nuts that secure the motor
bracket in place
5. Unplug the motor wires and set the motor out of
the way.
6. Twist and pull up to remove the agitator.
Service Procedure # 002
(Page 1 of 3) 08/05/2014
Packing and Agitator Replacement
A2000/A2000I
Check Agitator-
1. Check the agitator for wear and pitting in the shaft surface. The surface should be very smooth without grooves, pits or a
thinned diameter.
2. The agitator can be installed if the packing has not been disturbed. Push and twist until the agitator is completely seated on
the vessel bottom.
3. Replace the motor and cabinet bottom. Follow the procedure for tightening the packing on the bottom of page 3.
Note:
The Agitator Teflon
Collar must rest against
the bottom of the
Digestion Vessel when
installed.
Replacing the Packing-
1. The packing is removed using a screwdriver.
2. The packing consists of two carbon ropes and one compressed
graphite cylinder. When removed, it will look similar to the image
on the left. Ensure both ropes are removed or the new packing
will not fit.
(
ANKOM Technology 2052 O’Neil Road Macedon, NY 14502 PH: (315) 986-8090 FAX: (315) 986-8091
Service Procedure # 002
(Page 1 of 3) 08/05/2014
Packing and Agitator Replacement
A2000/A2000I
Packing
Packing
Bushing
.
Packing
Bushing
3. Check the packing nut after four hours of use and adjust if necessary. If assistance is needed, call
ANKOM Technology at 315-986-8090 or email technical service at [email protected].
/