Voltaire ISR 9024 User manual

Category
Software
Type
User manual

This manual is also suitable for

Voltaire Switch User Manual
ISR 9024, ISR 9096, and ISR 9288 Switches
Business Headquarters
Voltaire Inc.
6 Fortune Drive, Suite 301
Billerica, MA USA 01821
Tel: 978-439-5400
Fax: 978-439-5401
Israel Office
Voltaire Ltd.
9 Hamenofim St.
Bldg. A Herzeliya
46725, Israel
Tel: +972 (9) 971-7666
Fax: +972 (9) 971-7660
Release AAA-BAA
May 2006
P/N 399Z00038
THIS DOCUMENT IS PROVIDED "AS IS" WITH NO WARRANTIES WHATSOEVER, INCLUDING ANY
WARRANTY OF MERCHANTABILITY, NONINFRINGEMENT, FITNESS FOR ANY PARTICULAR
PURPOSE, OR ANY WARRANTY OTHERWISE ARISING OUT OF ANY PROPOSAL, SPECIFICATION
OR EXAMPLES.
Voltaire disclaims all liability, including liability for infringement of any proprietary rights, relating to use of
information in this specification.
No license, expressed or implied, by written or otherwise, to any intellectual property rights is granted herein.
This document as well as the software described in it is furnished under license and may only be used or copied
in accordance with the terms of the license. The information in this manual is furnished for informational use
only, is subject to change without notice, and should not be construed as a commitment by Voltaire. Voltaire
Ltd. assumes no responsibility or liability for any errors or inaccuracies that may appear in this document or any
software that may be provided in association with this document. Except as permitted by such license, no part of
this document may be reproduced, stored in a retrieval system, or transmitted in any form or by any means
without the express written consent of Voltaire Ltd.
Voltaire is a trademark or registered trademark of Voltaire Ltd. or its subsidiaries in the United States and other
countries.
Other names and brands may be claimed as the property of others and have been designated with an asterisk (*)
throughout this document.
Copyright © 2006, Voltaire Ltd.
Voltaire Part Number:
399Z00038
About this Manual
This preface describes the audience, organization and command syntax conventions
of the Voltaire Switch User Manual. It also provides information on how to obtain
related documentation and technical assistance. Information about hardware
installation of Voltaire switches can be found in ISR 9024 Installation Manual and
in the ISR 9XXX Installation Manual, which includes the ISR 9096 and the
ISR 9288.
NOTE
Consult Voltaire release notes for last minute updates and restrictions.
The Voltaire Technical Support Center (TSC) is at your service. You may access
Warranty Service through our Web Request Form by using the following link:
http://www.voltaire.com/support.html
Contact Us:
Please send your documentation-related comments and feedback or report mistakes
We are committed to constant and never-ending improvement. Your input will
greatly help us in our endeavor.
Audience
This manual is primarily intended for system administrators who are familiar with
the fundamentals of router-based internetworking and network storage devices, but
who might not be familiar with the specifics of Voltaire products or the routing
protocols supported by Voltaire products
It is assumed that readers are familiar with InfiniBand technology and terminology.
Related Documentation
ISR 9XXX Installation Manual, Voltaire
ISR 9024 Installation Manual, Voltaire
About this Manual
ii
P/N 399Z00038 © 2006 Voltaire, Inc.
Document Conventions
NOTE
Text set off in this manner presents clarifying information, specific instructions,
commentary, sidelights, or interesting points of information.
IMPORTANT
Text set off in this manner indicates important information regarding a specific
feature.
CAUTION
Text set off in this manner indicates that failure to follow directions could result in
damage to equipment or loss of information.
About this Manual
iii
P/N 399Z00038 © 2006 Voltaire, Inc.
Document Organization
This guide contains the following chapters:
Chapter 1 – Introduction: Describes the InfiniBand technology and provides an
introduction to the ISR 9024, ISR 9096 and ISR 9288 switches.
Chapter 2 – CLI Overview: Provides a brief introduction on the Voltaire
Command Line Interface (CLI).
Chapter 3 – Initial System Setup: Provides instructions on how to perform an
initial setup of your system.
Chapter 4 – Basic CLI Maintenance Commands: This section explains how to
configure switch parameters and how to perform a software and firmware
upgrade.
Chapter 5 – Voltaire Device Manager (VDM): Describes the Voltaire Device
Manager, a Graphic User Interface (GUI) application for device management
and switch configuration and provides operation instructions.
Chapter 6 – Voltaire Fabric Manager (VFM): Describes the Voltaire Fabric
Manager (VFM), a Graphic User Interface (GUI) application that provides a
wide range of provisioning, configuration and maintenance functions for the
Switch, and provides operation instructions.
Chapter 7 – Names Settings: This section provides instructions on how to set
names to Switches and unmanaged ISR 9024.
Chapter 8 – Rack Grouping: Introduces the Rack grouping feature and
provides instructions on how to create, set, edit, view, and delete rack-groups.
Chapter 9 – Configuring Quality of Service (QoS): Provides a QoS overview,
instruction on how to perform SL to VL mapping, QoS arbitration, and an
example of SM parameter configuration.
Chapter 10 – Configuring Routing Algorithms: Lists the supported algorithms,
details the Balanced Routing, Rearrangeable Routing (Multi-Path with sFB
Consistency), and Up/Down Routing schemes, as well as providing
instructions on how to configure Routing via the VFM and the CLI.
Chapter 11 – Configuring Partitioning: Describes the Partitioning feature used
to enforce isolation among systems using an InfiniBand Fabric and provides
instructions on how to assign partition keys (Pkeys). It also describes how
Partitioning is used to associate hosts or devices that share common attributes.
Chapter 12 – Replacing Modules: Provides instructions on how to replace
sFBs, sLBs, sMBs and unmanaged ISR 9024.
About this Manual
iv
P/N 399Z00038 © 2006 Voltaire, Inc.
Chapter 13 – Configuring Cluster Monitor: Allow you to view your entire
cluster in a browser using the Ganglia tool.
Chapter 14 – Fabric Diagnostic: Provides information on logging and
monitoring functions for advanced fabric debugging and failure detection
capabilities.
Appendix A – CLI Commands Reference: Explains the CLI basic concept and
details the CLI command menus. The CLI provides configuration and
management functions for Voltaire switches, as well as a wide range of
provisioning, configuration and maintenance functions for the InfiniBand
fabric.
Appendix B – Port Counters : For Advanced Diagnostics - Describes and
details the port counter fields of the CSV file, details the CSV counters
summary reports and lists the ports counters currently available.
Appendix C – Supported Traps and Events: Defines the structure of traps and
lists the traps, events and alarms supported in this version.
Appendix D – Glossary
Appendix E – Index
About this Manual
v
P/N 399Z00038 © 2006 Voltaire, Inc.
What's New in this Manual?
This switch software version includes the following new features:
Subnet Management Enhancements: Enhanced “Bad-Ports” feature, Up-Down
Routing Scheme, Performance Improvement: Improve Fabric Configuration
Time, Subnet Manager Priority, Partitioning, Non-Intrusive Routing
Reconfiguration, and Subnet Prefix.
Rack Grouping (Creating, renaming, deleting rack groups, and viewing rack
information via the GUI and the CLI; groups.csv file)
The Voltaire switch software supports a new hardware module: sLB-8-12
Diagnostics Enhancements: Enhanced Event Notification - extended
notification mode, New alarm category in current alarm mechanism: Fabric
Config Error, Enhanced Performance Manager (PM) [PortCounters files; Port-
verify Utility; Port-Manage Utility]
Unique Switch Name
CLI Enhancements (exportLogs, new madstat and vendstat options)
New default firmware settings
Router Version Automatic Upgrade
Contents
Audience........................................................................................................................................i
Related Documentation................................................................................................................i
Document Conventions ..............................................................................................................ii
Document Organization.............................................................................................................iii
What's New in this Manual? .......................................................................................................v
Chapter 1. Introduction..........................................................................................................1-1
1.1 About InfiniBand...........................................................................................................1-2
1.2 ISR 9024 System Overview ..........................................................................................1-3
1.3 ISR 9288/9096 System Overview.................................................................................1-4
1.4 Voltaire Switch Management......................................................................................1-10
Chapter 2. CLI Overview........................................................................................................2-1
2.1 Interfaces for CLI Connection.......................................................................................2-2
2.2 CLI Command Modes...................................................................................................2-2
2.3 CLI Usage Tips .............................................................................................................2-3
2.4 Keyboard Usage in CLI Operation................................................................................2-3
2.5 CLI Command Structure ...............................................................................................2-5
2.6 CLI Case Sensitivity......................................................................................................2-5
2.7 CLI Command Prompts.................................................................................................2-6
Chapter 3. Initial System Setup.............................................................................................3-1
3.1 Prerequisite Tasks..........................................................................................................3-2
3.2 First-Time Configuration...............................................................................................3-2
3.3 Collecting Required Information...................................................................................3-2
3.4 Connecting a Console....................................................................................................3-3
3.5 Starting a CLI Session...................................................................................................3-3
3.6 Configuring the Management Interface IP Address......................................................3-4
3.7 Configuring the Management IP Address in ISR 9288/9096/9024 Switches ...............3-5
3.8 Configuring the ISR 9288/9096 with I/O Modules.......................................................3-7
3.9 Configuring Time and Date...........................................................................................3-9
Contents
ii
P/N 399Z00038 © 2006 Voltaire, Inc.
3.10 Configuring Passwords..................................................................................................3-9
3.11 Verifying Configuration..............................................................................................3-10
Chapter 4. Basic CLI Maintenance Commands...................................................................4-1
4.1 Prerequisites ..................................................................................................................4-2
4.2 Updating Software.........................................................................................................4-2
4.3 Prerequisites for Updating Software .............................................................................4-3
4.4 Backing up the Switch Configuration ...........................................................................4-4
4.5 Software and Firmware Upgrade Process .....................................................................4-5
4.6 CLI Commands Reference ............................................................................................4-6
Chapter 5. Voltaire Device Manager (VDM)..........................................................................5-1
5.1 Device Manager Description.........................................................................................5-2
5.2 Getting Started with the Device Manager .....................................................................5-3
5.3 The Device Manager Main Window.............................................................................5-6
5.4 Voltaire Device Manager Operating Conventions ......................................................5-16
5.5 Viewing Switch Information.......................................................................................5-16
5.6 Viewing Module Information......................................................................................5-27
5.7 Using the Voltaire Device Manager for Switch Management.....................................5-40
5.8 Reset Operations..........................................................................................................5-45
Chapter 6. Voltaire Fabric Manager (VFM)...........................................................................6-1
6.1 Fabric Manager Description..........................................................................................6-2
6.2 Fabric Manager Installation...........................................................................................6-3
6.3 Getting Started with the Fabric Manager ......................................................................6-5
6.4 The Fabric Manager Main Window ..............................................................................6-8
6.5 Viewing Properties Data..............................................................................................6-28
6.6 Information Windows..................................................................................................6-31
6.7 Configuring the Fabric ................................................................................................6-41
6.8 Configuring Nodes ......................................................................................................6-61
Chapter 7. Names Settings....................................................................................................7-1
7.1 CLI Switch Name Settings............................................................................................7-2
7.2 GUI Node Name Settings..............................................................................................7-3
7.3 Naming an Unmanaged ISR 9024.................................................................................7-4
Chapter 8. Rack Grouping.....................................................................................................8-1
8.1 Rack Grouping Overview..............................................................................................8-2
8.2 Rack Grouping Settings via the VFM ...........................................................................8-3
8.3 Elements of the Group.csv File...................................................................................8-10
8.4 Backing up and Editing Groups Settings via the CLI .................................................8-12
Contents
iii
P/N 399Z00038 © 2006 Voltaire, Inc.
8.5 Rack Grouping Installation Suggestion.......................................................................8-14
Chapter 9. Configuring Quality of Service (QoS)................................................................9-1
9.1 QoS Overview...............................................................................................................9-2
9.2 SL to VL Mapping ........................................................................................................9-2
9.3 QoS Arbitration.............................................................................................................9-4
9.4 Example of SM Parameter Configuration.....................................................................9-7
Chapter 10. Configuring Routing Algorithms......................................................................10-1
10.1 Supported Algorithms .................................................................................................10-2
10.2 Balanced Routing Scheme...........................................................................................10-2
10.3 Rearrangeable Routing (Multi-Path with sFB Consistency).......................................10-2
10.4 Up/Down Routing Scheme..........................................................................................10-3
10.5 Configuring Routing via the VFM ..............................................................................10-4
10.6 Configuring Routing via the CLI ................................................................................10-7
Chapter 11. Configuring Partitioning....................................................................................11-1
11.1 Partitioning Overview .................................................................................................11-2
11.2 Mechanisms Used to Create and Enforce Partitions ...................................................11-3
11.3 Setting Partitioning......................................................................................................11-3
Chapter 12. Replacing Modules............................................................................................12-1
12.1 Replacing sFBs (Spines)..............................................................................................12-2
12.2 Replacing sLBs............................................................................................................12-6
12.3 Replacing sMBs ..........................................................................................................12-7
12.4 Replacing an Unmanaged ISR 9024............................................................................12-8
Chapter 13. Configuring Cluster Monitor.............................................................................13-1
13.1 What is Ganglia? .........................................................................................................13-2
13.2 Cluster Configuration..................................................................................................13-2
Chapter 14. Fabric Diagnostic...............................................................................................14-1
14.1 Fabric Diagnostic Overview........................................................................................14-2
14.2 Fabric Inspect Settings ................................................................................................14-7
14.3 Diagnostic Tools........................................................................................................14-10
14.4 Additional Tools and Examples ................................................................................14-20
Contents
iv
P/N 399Z00038 © 2006 Voltaire, Inc.
Appendix A CLI Commands Reference................................................................................. A-1
Appendix B Port Counters Fields........................................................................................... B-1
Appendix C Supported Traps and Events............................................................................. C-1
Appendix D Glossary............................................................................................................... D-1
Appendix E Index......................................................................................................................E-1
Figures
Figure 1-1. Voltaire ISR 9024 Grid Switch™ Functional Diagram................................... 1-4
Figure 1-2. Voltaire ISR 9288 Grid Backbone™ Functional Diagram.............................. 1-5
Figure 1-3. Voltaire ISR 9096 Grid Backbone™ Functional Diagram.............................. 1-5
Figure 1-4. ISR 9288 InfiniScale Switching Topology - Fat Tree Topology..................... 1-8
Figure 1-5. ISR 9096 InfiniScale Switching Topology - Fat Tree Topology..................... 1-9
Figure 1-6. Out-of-band Management.............................................................................. 1-11
Figure 1-7. In-band Management ..................................................................................... 1-11
Figure 5-1. Accessing the Voltaire Multi Protocol Switch Window.................................. 5-3
Figure 5-2. Login Dialog Box ............................................................................................ 5-4
Figure 5-3. Exit Warning Message..................................................................................... 5-6
Figure 5-4. ISR 9288 Voltaire Device Manager Main Window......................................... 5-7
Figure 5-5. ISR 9096 Voltaire Device Manager Main Window......................................... 5-8
Figure 5-6. Device Tree.................................................................................................... 5-10
Figure 5-7. ISR 9096 Switch VDM Graphical Representation (Front View) .................. 5-12
Figure 5-8. ISR 9096 Switch VDM Graphical Representation (Rear View) ................... 5-12
Figure 5-9. ISR 9288 Switch Graphical Representation (Front View)............................. 5-13
Figure 5-10. ISR 9288 Switch Graphical Representation (Rear View)............................ 5-14
Figure 5-11. ISR 9024 Switch Graphical Representation ................................................ 5-14
Figure 5-12. Device Information...................................................................................... 5-17
Figure 5-13. Port Information........................................................................................... 5-19
Figure 5-14. CPU Information.......................................................................................... 5-21
Figure 5-15. Temperature Readings ................................................................................. 5-23
Figure 5-16. Local SM Information ................................................................................. 5-24
Figures
v
P/N 399Z00038 © 2006 Voltaire, Inc.
Figure 5-17. Detailed Module Information ...................................................................... 5-26
Figure 5-18. sLB Information........................................................................................... 5-28
Figure 5-19. sLB-24 with Optical Adapters ..................................................................... 5-30
Figure 5-20. ISR 9288 Fabric Board Information ............................................................ 5-31
Figure 5-21. ISR 9096 Fabric Board Information ............................................................ 5-31
Figure 5-22. sMB Information.......................................................................................... 5-32
Figure 5-23. sMB Detailed Module Information Window............................................... 5-33
Figure 5-24. sCTRL Information...................................................................................... 5-34
Figure 5-25. sPSU Information ........................................................................................ 5-35
Figure 5-26. ISR 9288 Fan Information ........................................................................... 5-36
Figure 5-27. ISR 9096 Fan Information ........................................................................... 5-36
Figure 5-28. Faulty Fan Information ................................................................................ 5-37
Figure 5-29. Router Module Information ......................................................................... 5-39
Figure 5-30. IP Settings.................................................................................................... 5-40
Figure 5-31. Remote Manager Settings - SNMP Tab....................................................... 5-41
Figure 5-32. Remote Manager Settings - General tab ...................................................... 5-42
Figure 5-33. Configuring User Authorization .................................................................. 5-43
Figure 5-34. Configuring FTP.......................................................................................... 5-44
Figure 5-35. Warning popup ............................................................................................. 5-45
Figure 6-1. Voltaire Fabric Manager Initiate Window....................................................... 6-5
Figure 6-2. Login Window ................................................................................................. 6-6
Figure 6-3. Exit Warning Message..................................................................................... 6-7
Figure 6-4. Fabric Manager Main Window........................................................................ 6-8
Figure 6-5. Example of a System with 1104 Nodes ........................................................... 6-9
Figure 6-6. Topology Map ............................................................................................... 6-10
Figure 6-7. Right-Click a Node – Topology Map ............................................................ 6-16
Figure 6-8. Right-Click a Node – Information Area (Right Panel).................................. 6-16
Figure 6-9. Right-Click a Port – Information Area (Right Panel).................................... 6-17
Figure 6-10. Right-Click a Port – Table View ................................................................. 6-17
Figures
vi
P/N 399Z00038 © 2006 Voltaire, Inc.
Figure 6-11. Right-Click an Event ................................................................................... 6-17
Figure 6-12. Right-Click the Fabric Subnet ..................................................................... 6-17
Figure 6-13. Right-Click Racks........................................................................................ 6-18
Figure 6-14. Subnet Tree.................................................................................................. 6-18
Figure 6-15. Topology Table View .................................................................................. 6-22
Figure 6-16. Trap Table.................................................................................................... 6-23
Figure 6-17. Events Log Right-Click Menu..................................................................... 6-25
Figure 6-18. Events Data.................................................................................................. 6-25
Figure 6-19. Go to Node................................................................................................... 6-27
Figure 6-20. Node Properties ........................................................................................... 6-28
Figure 6-21. Port Properties.............................................................................................. 6-29
Figure 6-22. Link Properties............................................................................................. 6-31
Figure 6-23. List of Racks ................................................................................................ 6-31
Figure 6-24. Racks Components ...................................................................................... 6-32
Figure 6-25. Hosts List ..................................................................................................... 6-33
Figure 6-26. Hosts Ports ................................................................................................... 6-34
Figure 6-27. List of Switches ........................................................................................... 6-35
Figure 6-28. Switch/SLB Information.............................................................................. 6-36
Figure 6-29. Port Information........................................................................................... 6-37
Figure 6-30. Link Information.......................................................................................... 6-39
Figure 6-31. Grouping Information.................................................................................. 6-40
Figure 6-32. SM Details ................................................................................................... 6-41
Figure 6-33. Event Filters Settings................................................................................... 6-44
Figure 6-34. PM Settings.................................................................................................. 6-45
Figure 6-35. Event Log - Example ................................................................................... 6-46
Figure 6-36. Error Log – Example ................................................................................... 6-47
Figure 6-37. Bad Ports Log .............................................................................................. 6-48
Figure 6-38. PortCounters.csv File - Example ................................................................. 6-49
Figure 6-39. Cluster Monitor Dialog Box ........................................................................ 6-49
Figures
vii
P/N 399Z00038 © 2006 Voltaire, Inc.
Figure 6-40. Ganglia Cluster Monitor .............................................................................. 6-50
Figure 6-41. QoS SL to VL Mapping Table..................................................................... 6-51
Figure 6-42. QoS VL High Arbitration Table .................................................................. 6-52
Figure 6-43. Routing ........................................................................................................ 6-53
Figure 6-44. Routing Algorithm....................................................................................... 6-54
Figure 6-45. Add to Spine List ......................................................................................... 6-55
Figure 6-46. Current Alarms ............................................................................................ 6-56
Figure 6-47. Alarm Data................................................................................................... 6-57
Figure 6-48. Config FTP Dialog Box............................................................................... 6-59
Figure 6-49. Viewing Nodes ............................................................................................ 6-61
Figure 6-50. Nodes Grouping Info Window .................................................................... 6-62
Figure 6-51. Group Properties.......................................................................................... 6-63
Figure 6-52. Creating a New Rack ................................................................................... 6-63
Figure 6-53. Current Alarms of a Single Node ................................................................ 6-64
Figure 7-1. Node Properties ............................................................................................... 7-3
Figure 8-1. Rack-Groups (VFM)........................................................................................ 8-3
Figure 8-2. Rack Grouping – Topology Map..................................................................... 8-4
Figure 8-3. Rack Grouping – Table View .......................................................................... 8-4
Figure 8-4. Rack Grouping – Switches/Host Table............................................................ 8-5
Figure 8-5. Node Properties Dialog Box ............................................................................ 8-5
Figure 8-6. New Rack Dialog Box ..................................................................................... 8-6
Figure 8-7. New Rack......................................................................................................... 8-6
Figure 8-8. Group Properties Dialog Box .......................................................................... 8-7
Figure 8-9. Rack Group Contents....................................................................................... 8-8
Figure 8-10. Rack-Groups – Table View ........................................................................... 8-9
Figure 8-11. Absent Elements .......................................................................................... 8-10
Figure 9-1. QoS SL to VL Mapping Table......................................................................... 9-3
Figure 9-2. QoS Arbitration Table ..................................................................................... 9-5
Figure 10-1. Routing ........................................................................................................ 10-4
Figures
viii
P/N 399Z00038 © 2006 Voltaire, Inc.
Figure 10-2. Routing Algorithm....................................................................................... 10-5
Figure 10-3. Add to Spine List ......................................................................................... 10-6
Figure 11-1. Partitioning Block Diagram .......................................................................... 11-2
Figure 12-1. Resetting a Specific Board via the VDM..................................................... 12-4
Figure 13-1. Cluster Monitor Dialog Box ........................................................................ 13-2
Figure 13-2. Ganglia Cluster Monitor .............................................................................. 13-3
Figure 14-1. Diagnostic Block Diagram........................................................................... 14-3
Figure 14-2. PM Settings.................................................................................................. 14-9
Figure 14-3. Port Counters Information ......................................................................... 14-11
Figure 14-4. Port Counters Graph .................................................................................. 14-12
Figure 14-5. Trap Table – 1 X Link ............................................................................... 14-20
Figure 14-6. VFM Event Data Window ......................................................................... 14-20
Figure 14-7. Nodes Info Window................................................................................... 14-22
Figure 14-8. Bad Ports Log ............................................................................................ 14-25
1-1
P/N 399Z00038 © 2006 Voltaire, Inc.
1
1
Chapter 1. Introduction
In This Chapter
This chapter provides a brief introduction to InfiniBand technology and describes
Voltaire ISR 9024, ISR 9096 and ISR 9288 switches.
The following information is included in these pages:
About InfiniBand, on page 1-2
ISR 9024 System Overview, on page 1-3
ISR 9288/9096 System Overview, on page 1-4
Voltaire Switch Management, on page 1-10
Introduction About InfiniBand
1-2
P/N 399Z00038 © 2006 Voltaire, Inc.
1.1 About InfiniBand
InfiniBand technology is a high-performance channel-based interconnect
architecture that provides increased scalability and reliability for servers and other
Internet infrastructure equipment. InfiniBand architecture defines the entire stack,
from the physical to the application layers APIs and fabric management.
InfiniBand has unique capabilities for direct data placement implemented by
RDMA and for OS bypassing, discovery, fail-over, remote boot, I/O sharing, and
other advanced features.
InfiniBand is the IT industry's solution for expanding data network centers to
prepare for the next generation of communications. e-business, Internet use and the
demands of the communications age have created the need for increased processing
power, larger stores of information and a greater, more reliable flow of data. As the
present architecture struggled under the current load of information, it was painfully
clear that a solution was needed in order to manage the increasing demands of the
future. The giants of the IT industry (Compaq, Dell, IBM, Intel, HP, SUN and
Microsoft followed
by more than 230 companies) combined the best elements of
two competing technological initiatives to create InfiniBand, an industry standard
that has been adopted with confidence. Solving a great number of obstacles that
data centers were facing (scalability, reliability, manageability), InfiniBand enabled
the introduction of data clusters, an invaluable next step to data center construction.
In effect, InfiniBand is a fabric-based, switched network that allows devices such as
servers, storage and I/O to communicate at very high speeds. Until the advent of
InfiniBand, communication devices had to wait in line to send their information
through one shared bus. The ten-year-old architecture had reached its limits and did
not have enough bandwidth available to meet the rising demands of the information
load.
InfiniBand architecture is based upon a very different concept. Offering high-speed
interprocessor communication and memory sharing, it enables you to build server
clusters with performance comparable to that of large servers at a fraction of the
price. Instead of one bus through which every device communicates, InfiniBand
architecture offers a network fabric that incorporates numerous switches and router
modules, allowing devices to communicate simultaneously. Speed is no longer
restricted by the shortcomings of the infrastructure. InfiniBand operates at
2.5Gbps (1X), 10Gbps (4X), 20Gbps (4X DDR), 30Gbps (12X) to 60 Gbps (12X
DDR).
InfiniBand architecture is modular, highly scalable (it allows for virtually unlimited
network expansion) and reduces the workload of the operating system kernel and
the CPU, freeing their power to run applications. Offering advanced fault isolation
controls, nonexistent in previous protocols, InfiniBand provides a high level of fault
tolerance. And most importantly, because the InfiniBand system is modular,
processing power based on commodity servers can be added as needed.
Introduction ISR 9024 System Overview
1-3
P/N 399Z00038 © 2006 Voltaire, Inc.
InfiniBand System Elements
The following are the InfiniBand system elements:
HCA (Host Channel Adapter), an adapter or silicon chip residing on the host
motherboard providing the host side functionality and advanced reliable
message passing capabilities.
Switch, connecting all the nodes in a switched point-to-point manner.
Router Modules, providing connectivity to other InfiniBand or IP subnets.
Storage (native and Fibre Channel access)
InfiniBand provides a reliable, low latency interconnect (with typical switch latency
of 100nS) with fault-tolerance mechanisms (Automatic Path Migration), physical
multiplexing (Virtual Lanes), physical link aggregation (1X, 4X, 12X) and
security/partitioning.
The InfiniBand fabric provides central management and configuration controlling
discovery, failures and resource allocation.
1.2 ISR 9024 System Overview
The Voltaire ISR 9024 Grid Switch is a high performance, low latency, fully non-
blocking switch for high performance computing (HPC) clusters and grids. Offering
available bandwidth of 480 Gbps, the Voltaire ISR 9024 is an alternative to
proprietary interconnect technologies. With twenty-four 10 Gbpsports in a 1U
chassis, the standards-based ISR 9024 delivers three times the port density of
proprietary offerings. Using the Voltaire ISR 9024 Grid Switch, you can build high
performance clusters and grids that scale from several to hundreds of nodes.
The ISR 9024 serves as a building block for Fat Tree topologies of hundred of
nodes for scientific, commercial HPC and enterprise grid applications. When
combined with the Voltaire ISR 9288/9096 high port density switch, the Voltaire
ISR 9024 enables the formation of clusters scaling to thousand of nodes.
The ISR 9024 architecture features a passive cooling device (with no fans) resulting
in a noise free, high MTBF unit.
Introduction ISR 9288/9096 System Overview
1-4
P/N 399Z00038 © 2006 Voltaire, Inc.
Figure 1-1 shows the ISR 9024 functional block diagram.
Figure 1-1. Voltaire ISR 9024 Grid Switch™ Functional Diagram
1.3 ISR 9288/9096 System Overview
The Voltaire ISR 9288/9096 Grid Backbone is a modular platform for building high
levels of performance and scalability for large high performance computing (HPC)
clusters. The Voltaire ISR 9288/9096 enables high performance applications to run
on distributed server, storage and network resources.
Elegantly designed with 10/30 Gbps of full bisectional bandwidth for up to 96 or
288 4X/12X ports in a single chassis, multiple ISR 9288/9096 can also be
interconnected to form very large clusters.
Possible configurations range from dozens to thousands of nodes with many
upgrade paths available.
Featuring fat tree (Clos) topology that provides full bisectional bandwidth for each
port, the Voltaire ISR 9288/9096 lead the InfiniBand industry with the highest
switching capacity.
Providing unmatched levels of IniniBand bandwidth, the ISR 9096 and the
ISR 9288 respectively support up to 96 and 288 InfiniBand ports, which can be
used in any combination of 10 Gbps 4X Ports and or 30 Gbps InfiniBand 12X
ports. The 12X port incorporates three 4X InfiniBand ports aggregated into a single
InfiniBand port.
Wire-speed non-blocking switch capacity combined with latency of less than
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212
  • Page 213 213
  • Page 214 214
  • Page 215 215
  • Page 216 216
  • Page 217 217
  • Page 218 218
  • Page 219 219
  • Page 220 220
  • Page 221 221
  • Page 222 222
  • Page 223 223
  • Page 224 224
  • Page 225 225
  • Page 226 226
  • Page 227 227
  • Page 228 228
  • Page 229 229
  • Page 230 230
  • Page 231 231
  • Page 232 232
  • Page 233 233
  • Page 234 234
  • Page 235 235
  • Page 236 236
  • Page 237 237
  • Page 238 238
  • Page 239 239
  • Page 240 240
  • Page 241 241
  • Page 242 242
  • Page 243 243
  • Page 244 244
  • Page 245 245
  • Page 246 246
  • Page 247 247
  • Page 248 248
  • Page 249 249
  • Page 250 250
  • Page 251 251
  • Page 252 252
  • Page 253 253
  • Page 254 254
  • Page 255 255
  • Page 256 256
  • Page 257 257
  • Page 258 258
  • Page 259 259
  • Page 260 260
  • Page 261 261
  • Page 262 262
  • Page 263 263
  • Page 264 264
  • Page 265 265
  • Page 266 266
  • Page 267 267
  • Page 268 268
  • Page 269 269
  • Page 270 270
  • Page 271 271
  • Page 272 272
  • Page 273 273
  • Page 274 274
  • Page 275 275
  • Page 276 276
  • Page 277 277
  • Page 278 278
  • Page 279 279
  • Page 280 280
  • Page 281 281
  • Page 282 282
  • Page 283 283
  • Page 284 284
  • Page 285 285
  • Page 286 286
  • Page 287 287
  • Page 288 288
  • Page 289 289
  • Page 290 290
  • Page 291 291
  • Page 292 292
  • Page 293 293
  • Page 294 294
  • Page 295 295
  • Page 296 296
  • Page 297 297
  • Page 298 298
  • Page 299 299
  • Page 300 300
  • Page 301 301
  • Page 302 302
  • Page 303 303
  • Page 304 304
  • Page 305 305
  • Page 306 306
  • Page 307 307
  • Page 308 308
  • Page 309 309
  • Page 310 310
  • Page 311 311
  • Page 312 312
  • Page 313 313
  • Page 314 314
  • Page 315 315
  • Page 316 316
  • Page 317 317
  • Page 318 318
  • Page 319 319
  • Page 320 320
  • Page 321 321
  • Page 322 322
  • Page 323 323
  • Page 324 324
  • Page 325 325
  • Page 326 326
  • Page 327 327
  • Page 328 328
  • Page 329 329
  • Page 330 330
  • Page 331 331
  • Page 332 332
  • Page 333 333
  • Page 334 334
  • Page 335 335
  • Page 336 336
  • Page 337 337
  • Page 338 338
  • Page 339 339
  • Page 340 340
  • Page 341 341
  • Page 342 342
  • Page 343 343
  • Page 344 344
  • Page 345 345
  • Page 346 346
  • Page 347 347
  • Page 348 348
  • Page 349 349
  • Page 350 350
  • Page 351 351
  • Page 352 352
  • Page 353 353
  • Page 354 354
  • Page 355 355
  • Page 356 356
  • Page 357 357
  • Page 358 358
  • Page 359 359
  • Page 360 360
  • Page 361 361
  • Page 362 362
  • Page 363 363

Voltaire ISR 9024 User manual

Category
Software
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI