Enwork Zori® Monitor Lift Installation guide

Type
Installation guide
Zori Monitor Lift Installation Guide – Rev C.
ZORI MONITOR LIFT
INSTALLATION INSTRUCTIONS
MONITOR LIFT
ZI0013
INSTALLATION GUIDE
Place your tables in the desired conguration
near its designated power source before starting.
Utilize the cutout in the end panels to lift the
tables if needed.
To open doors, unlock and pull lightly. Doors will
open slightly. Lift up to remove.
PRE-INSTALL TIPS
1
INSTALLATION GUIDE
1) PARTS AND FASTENERS INCLUDED
Zori Monitor Lift Table
CYPxxxxxxx
Top Filler Panel–End (2x)
CYL-1888-xE
Upper Ganging Bracket
(2x or 3x per Table)
CYM-1939
Side Filler Panel (2x)
CYL-1887
Top Filler Panel–Single (1x)
CYL-1888-xS
Top Filler Panel–Mid (Xx)
CYL-1888-xM
Panel Clip (2x/ Side Filler Panel)
CYM-1943
Lower Ganging Bracket (2x)
CYM-1944
Flat Plate (1x/table)
USPT
2
INSTALLATION GUIDE
1) PARTS AND FASTENERS INCLUDED CONT.
Mini CPU Bracket
CYM-1924
Routing Hole Cover
ALM-2369
Monitor Shroud
CYM-1923
CPU Holder
CPHF or CPHS
Wireless Remote
CYPRC
Caster (4x)
CYPCKB
3
INSTALLATION GUIDE
1) PARTS AND FASTENERS INCLUDED CONT.
¼-20 x ½” Pan Head Phillips Bolt (2x)
200-23224
¼-20 X 4-1/2” Socket Head Cap Screw
200-34275
#8 x ¾” Pan Head Phillips (*)
200-37782
¼-20 Hex Nut (2x)
200-2345
#10 x 1” Pan Head Phillips
Screw (8x) - SCREW1
¼-20 x 7/8 Button Head Cap Screw
(3x or 5x per Table)
200-30081
4
INSTALLATION GUIDE
2) TOOLS AND SUPPLIES REQUIRED
Drill/Driver
Mini Screwdriver
Phillips Bit
5/32 Allen Wrench
Square Bit
1/4” Drill Bit
5
INSTALLATION GUIDE
Back-to-Back Ganging (Pages 6-9)
4Trac Power (Page 10)
Pairing & Operation (Pages 17-19)
Side-to-Side Ganging (Page 8 Figure 4.9)
Accessories
- Mini CPU (Page 11)
- Monitor & Monitor Shroud (Page 12-13)
- Keyboard & Mouse (Page 14)
- Wire Routing (Page 15-16)
- Casters (Page 17)
Troubleshooting (Page 20)
3) ASSEMBLY: OVERVIEW
6
INSTALLATION GUIDE
1. Slightly lifting the Table, locate the Lower
Ganging Bracket under the back panel of the case
assembly.
Note: There is a slot in the bottom panel to
accept this bracket. Someone will need to hold it
in place to proceed to step 2.
3. If you do not have the Lower Ganging Bracket
from Figure 4.1, begin by drilling through the pilot
hole as shown in Figure 4.3 using a ¼” Drill Bit.
Note: You may need to raise the Lifting Column
to access the hole. If space is tight, it’s
recommended to drive a long screw through this
hole until it protrudes through the back panel and
then re-drill from the back-side using the ¼” bit.
2. Secure the bottom Lower Ganging Bracket using
the provided #8 x ¾” Pan Head Phillips screws.
Note: There is a pilot hole to locate position. You
may need to raise the Lifting Column to access
the hole.
FIGURE 4.1
FIGURE 4.2
FIGURE 4.3
4) ASSEMBLY: GANGING
2x
2x
2x
7
INSTALLATION GUIDE
4. Attach the Upper Ganging Bracket to the back
panel by using the ¼-20 x 7/8 Button Head Cap
Screw through the hole you drilled in Figure 4.3.
5. Repeat the same drilling procedure as Figure 4.3
in the upper corners of the back panel.
6. Attach the Upper Ganging Bracket to the back
panel by using the ¼-20 x 7/8 Button Head Cap
Screw through the hole you drilled in Figure 4.4.
FIGURE 4.4
FIGURE 4.5
FIGURE 4.6
4) ASSEMBLY: GANGING
2x
2x
2x
8
INSTALLATION GUIDE
7. For Tables larger than 60W, locate another
Upper Ganging Bracket slighty off center by
repeating Steps 5 & 6.
Note: There is no pilot hole so line the Upper
Ganging Bracket up to the top of the back panel
and mark a hole to drill through.
8. Locate another table onto the installed Ganging
Brackets repeating Step 1-7 as needed.
9. Install Panel Clips to the Side Filler Panel using
the provided #8 x ¾” Pan Head Phillips screws.
Note: Use top-most/bottom-most holes and note
the orientation of the clips in Figure 4.9.
FIGURE 4.7
FIGURE 4.8
FIGURE 4.9
4) ASSEMBLY: GANGING
2x
9
INSTALLATION GUIDE
10. Slide the Side Filler Panel over the Ganging
Brackets engaging the Panel Clips into the slot –
top & bottom.
Note: Side Filler Panels are ONLY added to the
ends of a table run. Door lids hidden for clarity, but
can be removed for easier assembly.
11. For side-to-side ganging, attach the Flat Plate
to the underside of 2 side-to-side tables using the
provided #10 x 1” Pan Head Phillips screws.
Note: Place approximately 4” away from the front
edge of the worksurface.
12. Lay the Top Filler Panel onto the Upper
Ganging Brackets, in-between the Side Filler
Panels.
Note: For a single back-to-back table, only a Single
Top Filler Panel is used (shown in Figure 4.12).
For a run of tables, there are only 2 End Top Filler
Panels at each end of the run, and multiple Mid
Top Filler Panels in-between.
**Reference Page 1 Parts and Fasteners images
for proper Top Filler Panel identication.**
FIGURE 4.10
FIGURE 4.11
FIGURE 4.12
4) ASSEMBLY: GANGING
2x
10
INSTALLATION GUIDE
1. If applicable remove the Routing Hole Cover on
the side of the leg and sh the provided Jumper
through the cutouts of two adjacent tables.
Connect the Jumper to the receptacles. Repeat
until you’ve reached the maximum amount of
receptacles allowed per circuit.
2. Wire the infeed per your local Electrical Codes &
Regulations. Route the infeed similarly to Step 1.
FIGURE 5.1
FIGURE 5.2
5) ASSEMBLY: 4TRAC POWER
11
INSTALLATION GUIDE
1. Remove all the Surface Lids.
Note: Set aside hardware as it will be used again.
2. Attach the Mini CPU Bracket to the underside
of the Shelf using the provided #8 x ¾” Pan Head
Phillips screws.
Note: There are pilot holes to locate position. You
may need to raise the Lifting Column to access
the holes.
3. With the actuator fully raised, attach your mini
CPU to the bracket with either 2 methods:
Bolt your mini CPU to the Mini CPU Bracket utilizing
the standard Vesa hole pattern. Bolts are NOT
provided by Enwork.
Zip tie the CPU utilizing the slots in the Mini CPU
Bracket. Zip ties are NOT provided by Enwork.
FIGURE 6.1
FIGURE 6.2
FIGURE 6.3
6) ASSEMBLY: ACCESSORIES MINI CPU
12
INSTALLATION GUIDE
4. Remove the Vesa Bracket by untightening
the plastic knob and removing the socket head
screws.
Note: Set aside hardware as it will be used again.
5. Attach the Vesa Bracket to the back of your
monitor.
Note: Hardware is NOT provided by Enwork.
6. Attach the Monitor Shroud to the Lifting Column
using the provided (2) ¼-20 x ½” Pan Head Phillips
Bolts and (2) ¼-20 Hex Nuts.
Note: There are 2 height adjustments to
accommodate different monitor sizes and viewing
heights.
FIGURE 6.4
FIGURE 6.5
FIGURE 6.6
6) ASSEMBLY: ACCESSORIES MONITOR &
MONITOR SHROUD
13
INSTALLATION GUIDE
7. Re-attach the Vesa Bracket Monitor Assembly
from Figure 6.4.
Note: There are 3 height adjustments to
accommodate different monitor sizes and
viewing heights.
The angle of the Monitor can be adjusted (5
degrees total) by loosening, re-adjusting, then
re-tightening the lower plastic knob.
8. Re-attach doors from Figure 6.1.
FIGURE 6.7
FIGURE 6.8
6) ASSEMBLY: ACCESSORIES MONITOR &
MONITOR SHROUD
14
INSTALLATION GUIDE
9. Store the Keyboard and Mouse inside the
Shelf Basket.
Note: If the mouse does not t in the basket,
place on top of the Shelf.
10. Cords from the Keyboard and Mouse can be
routed out from any of the 3 holes in the Shelf
Basket.
FIGURE 6.9
FIGURE 6.10
6) ASSEMBLY: ACCESSORIES – KEYBOARD &
MOUSE
15
INSTALLATION GUIDE
(Case hidden for clarity)
11. Refer to Figure 6.11 for advised wire routing on a Mini CPU setup.
ALL cords must run behind the Shelf . The cords plugging into the 4Trac from the Shelf should move freely
and should not be tethered, tied, or clipped to anything else in the case.
FIGURE 6.11
6) ASSEMBLY: WIRE ROUTING
= CPU
= Keyboard
= Mouse
= Monitor VGA
= Monitor
16
INSTALLATION GUIDE
(Parts of case hidden for clarity)
12. Refer to Figure 6.12 for advised wire routing on an external CPU setup.
ALL cords must run behind the Shelf and/or over the Front Panel of the case. The cords plugging into the
4Trac from the shelf should move freely and should not be tethered, tied, or clipped to anything else in the case.
(Lids hidden for clarity)
13. The cords over the Front Panel should not be grouped on top of each other as shown in Figure 6.13.
Note: Route these cords behind the handset cord as shown in Figure 6.13
FIGURE 6.12
FIGURE 6.13
6) ASSEMBLY: WIRE ROUTING
= CPU
= Keyboard
= Mouse
= Monitor VGA
= Monitor
17
INSTALLATION GUIDE
14. Either laying the Table on its back or lifting
the Table, remove the existing levelers.
Note: 2+ persons required.
15. Attach the Casters.
FIGURE 7.14
FIGURE 7.15
7) ASSEMBLY: CASTERS
18
INSTALLATION GUIDE
1. Set the same DIP switch on each Control
Box in the classroom by pressing down on
the switches. Refer to page 18 Figure 7.4 for
address combinations.
Note: The DIP switch sets the address of the
control box for the remote to pair to.
2. Press and hold the center button for 3 seconds
until the backlight ashes. If paired successfully
you will hear a ‘clicking’ sound from the Lifting
Columns. If not, repeat this step.
Note: The remote has 16 addresses in total, so
this step may need to be repeated 16 times.
3. Press the up or down button once to
operate the tables.
Note: Whilst the Lifting Columns are in
motion, press either the up or down button
and the motion will stop.
FIGURE 8.1
FIGURE 8.2
FIGURE 8.3
8) ASSEMBLY: PAIRING AND OPERATION
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24

Enwork Zori® Monitor Lift Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI