Porter POWR LINE TELESCOPING CENTER STANDARDS Operating instructions

Type
Operating instructions
INSTALLATION INSTRUCTIONS
P
ULLEY
/M
OUNTING
S
TRIP
A
SSEMBLY
No. 1992, 1994, 1996 Volleyball Center Posts
1.
The Pulley/Mounting Strip Assembly is supplied pre-assembled, but must be installed onto the inner telescoping pole
section of the volleyball post, as detailed below.
2.
Make sure pressure-lock assembly on volleyball post is fully tightened. Inner telescoping pole section must be
secured during the installation of the Pulley/Mounting Strip Assembly.
3.
Assemble Pulley/Mounting Strip Assembly to inner telescoping pole section, using four 5/16" x 5/8" long Button Head
Screws and four 5/16" Internal Tooth Lock Washers. Fully tighten hardware. See Detail "A".
4.
After assembling Pulley/Mounting Strip Assembly to inner telescoping pole section, snug down hardware which holds
the pulley sheaves to the mounting strips – (2) places. DO NOT overtighten – pulley sheaves must be allowed to
spin freely. See Detail "A".
INST 00302 087
¤ 2016 PORTER ATHLETIC, INC. ALL RIGHTS RESERVED. 9-26-2016
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Pulley/Mounting
Strip Assembly
After assembling onto inner telescoping pole section, snug
pulley sheave hardware. DO NOT overtighten - pulley
sheaves must be allowed to spin freely.
Path of net cable at top end of volleyball post.
Install Pulley/Mounting Strip Assembly onto inner
telescoping pole section using 516" x 58" long Button
Head Screws and Lockwashers - (4) places.
Detail "A"
WARNING: This product can expose you to Titanium Dioxide,
which is known to the State of California to cause cancer.
For more information go to www.p65warnings.ca.gov.
E
  • Page 1 1

Porter POWR LINE TELESCOPING CENTER STANDARDS Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI