WHITEHALL MANUFACTURING •P.O. BOX 3527 • City of Industry, CA 91744-0527 U.S.A
Phone (800) 782-7706 • (626) 968-6681 • Fax (626) 855-4862 • Web: www.whitehallmfg.com
INSTALLATION, OPERATION & MAINTENANCE MANUAL WHCSB
2
6900-225-001
WHITEHALL LIGATURE RESISTANT SHOWER BASES
REMOVE SHOWER BASE CAREFULLY
FROM PACKAGING
REMOVE PACKAGING
WITH CARE
ACORN
AVOID STANDING
BASE ON EDGES
1HANDLING
Carefully remove from packaging prior to
installation. Inspect for any damage. Avoid
placing on its edges; this precaution will
prevent damage to corners.
Base
Base
2LEVELING
Level carefully. For proper installation,
establish a 1/4” maximum clearance between
the and the walls. Place up to ½” of
Mortar or Thinset and screed in area where the
Base
Base
Base is to be installed. This procedure is
recommended in order to support the
should the Sub-Floor be uneven. Taper the
Mortar/Thinset to a 1/4” thickness around the
Drain Floor. DO NOT place Mortar/Thinset
closer than 2” from the edge of the or the
Floor Drain opening.
Base
Base
3WARNING!
It is advisable to remove Drain Pipe prior to
setting in place. Insert Pipe through
Drain in into P-Trap. Tighten with an
Internal Pipe Wrench.
Base
Base
DO NOT DROP BASE OVER EXPOSED PIPE
THINSET OR
MORTAR BED
SUB-FLOOR
DOTTED AREA IS
FOR CORTERRA BASE
REMOVE PIPE
FROM P-TRAP
RE-INSERT PIPE AND TIGHTEN
WITH AN INTERNAL WRENCH
RECOMMENDED
1/4” SPACE
1/4" MAX.
EXPANSION GAP