Trinabess Trinahome T Series Installation guide

Type
Installation guide

This manual is also suitable for

Installation Manual
Solar Battery Hybrid System
T series
Trina Energy Storage Solutions (Jiangsu) Co., Ltd.
Tel: +86 519 8517 6686
Add: No. 2 Tianhe Road, Trina PV Park, New District,
Changzhou, Jiangsu, 213031
China
105-6133東京都港区浜松町二丁目4番1号
Tel: +81 (0) 3 6432 0581
トリナ·エナジー·ストレジー·ジャパン株式会社
世界貿易センタービル21階
Japan
Trina Energie Storage Vertrieb und Service GmbH
Add: Otto-Schott-Str.4, 60438, Frankfurt am Main, Germany
Europe
Tel: +49 (0) 69 75844 361
Tel: +61 2 8034 6313
Oceania
Add: Unit 60, 20 - 28 Maddox Street, Alexandria,
NSW 2015, Australia
Trina Energy Storage Solutions (Australia) Pty. Ltd.
Tel: +86 519 8517 6686
Singapore
Add: 600 North Bridge Road, #12-01 Parkview Square,
Singapore 188778
Trina Energy Storage Solutions (Singapore) PTE. Ltd.
www.trinaenergystorage.com WI - IM - T Series - 0002 2018 V3.0_EN
Technical Service Provided by
Trina Energy Storage Solutions (Jiangsu) Co., Ltd. (Trinabess)
NO. 2 Tianhe Road, Trina PV Park, New District, Changzhou,
Jiangsu, P.R.China.
Tel: +86 519 8517 6686
The details of this documentation are the property of
Trinabess.
Using and publicizing this documentation, even if only in
parts require the written consent of Trinabess.
All information in this documentation has been compiled
and checked with most care. Despite of this, errors or
deviations cannot be completely excluded. We assume
no liability therefore.
User is encouraged to check updated version at
http://www.trinaenergystorage.com/
Published by
Legal Disclaimer
Copyright
Preface
Please read the safety instructions in this manual first.
Throughout the manual it is assumed that the reader is familiar with AC and DC
installations and knows the rules and regulations for electrical equipment, as well as for
connecting it to the utility grid. It is especially important to be familiar with the general
safety rules for working with electrical equipment.
Read this installation manual before you start
How to use this manual?
This installation manual is intended for qualified electricians only.
Thank you for purchasing our highly reliable and efficient hybrid solution. This N6052T
hybrid system is rated IP65 inverter and IP20 battery packs, which is rated for dusty or
humid environments and is only suitable for indoor installation.
If you are reading the electronic version of the manual, please note that you can click the
content to find information you want quickly. All underlined characters are clickable. A
phrase named ‘Back to Top’ at the bottom of each chapter can help you go back to the
first page quickly.
Before using this device, please ensure that you have read this manual including
installation and safety operation carefully.
If you have any difficulty during installation or operation, please refer to this manual or
send email to [email protected], or contact your local Trinabess office.
Content
1. Safety
2. Product Description
3. Product Specification & Packaging
4. Installation
5. Electrical Connection
3.1.1 Hybrid Inverter Specification
3.1.2 Battery Bank Specification
3.3.1 Before Unpacking the Device
3.3.2 Packing
3.4.1 TB5200TH / TB5200TD Hybrid Inverter Packing List
3.4.2 TB9800TH Hybrid Inverter Packing List
3.4.3 Battery Module Packing List
3.4.4 Battery Control Box Packing List
3.4.5 Energy Meter Packing List
4.2.1 Mounting Inverter
4.2.2 Mounting Battery Bank
5.1.1 Connecting Battery Module Power Cable
5.1.2 Connecting Battery Module Communication Cable
5.1.3 Connecting Grounding Wire
5.1.4 Covering Boards
1.1 Important Safety Information
1.2 Safety Rules
1.3 Exclusion of Liability
2.1 General System Description
2.2 System Connection
3.1 Technical Specification
3.2 Component Dimension
3.3 Unpacking the Device
3.4 Packing List
4.1 Selecting Installation Location
4.2 Mounting
5.1 Battery Module Connection
5.2 Inverter Cable Connection
5.3 Meter Cable Connection
01
01
02
03
04
04
05
07
07
07
08
09
11
11
11
12
12
12
13
13
14
15
15
16
16
17
19
19
19
20
21
21
22
24
6. Commissioning
7. System Settings
8. Add Device on Cloud Platform
9. System Maintenance
Commissioning Survey
6.1 System Commissioning Checklist
6.2 System Commissioning
7.1 LCD
7.2 Wi-Fi
8.1 Dealer/Installer User Account Registration
8.2 Add New Device
7.1.1 LCD Interface and Indication Lights
7.1.2 LCD Display Definition
7.1.3 LCD Display Menu Definition
7.1.4 LCD Setting Menu
7.2.1 Wi-Fi Function
7.2.2 Wi-Fi Connecting
25
25
25
26
26
26
27
28
29
37
37
37
40
40
41
42
01
The following operating and maintenance instructions must be read before performing
system installation, operation and maintenance acitivities.
Check for damage on the device and package. If you are in doubt, please contact us
or the distributor before installing the device. Do not install damaged batteries.
Before connecting the solar modules or battery packs with the product, please check
the voltages and make sure they are within the limits of the Trina inverter
specifications. Failure to observe these specifications could void your warranty.
Only personnel trained and qualified with local electrical codes may work with the
electrical installations. For safety, please follow the steps described in this manual.
Please refer to “Disconnecting for maintenance”. Note that, after disconnecting the
hybrid inverter from power grid, PV panels and battery packs, wait at least 15 minutes
before the next proceeding.
Do not commission the device until the whole system complies with the
application-specific national rules and safety regulations.
The ambient conditions given in the product documentation (data sheet) must be
observed.
The device manufacturer or installer is responsible for compliance with the limit
values as prescribed in the national regulations.
Only persons who are trained and qualified for the use and operation of this device
are authorized to work on the device.
Only authorised personnel are allowed to repair or modify the inverter. To ensure
safety for user and environment, only the original spare parts available from your
supplier should be used.
Unauthorised changes of functional safety parameters may cause injury or accidents
to people or inverter. Additionally it will lead to the cancellation of all inverter operating
approval certificates.
1. Safety
1.1 Important Safety Information
1.1.1 Before Installation
1.1.2 Installation
1.1.3 Disconnecting the Product
1.1.4 Operating the Product
1.1.5 Maintenance and Modification
1.1.6 Functional Safety Parameters
Installation Manual
Solar Battery Hybrid System (T Series)
02
The following warning notices are adopted in safety related guidelines to describe the
various risk grade:
Death or severe personal injury will occur.
Death or severe personal injury may occur.
Personal injury or material damage may occur.
Do not open the device! Dangerous voltage may still be applied
inside the device even after it has been switched off.
Make absolutely sure you have established earthing system before
connecting the device to the supply circuit!
Health risk for persons with cardiac pacemakers, metallic implants
and hearing aids in the immediate vicinity of electrical equipment!
Personal injury mechanically by crushing, shearing, cutting or
striking.
If the inverter is operated with the wrong country code, the power
supply company may cancel the operating license.
Surfaces of the housing can be hot! Risk of injury! Risk of burns.
The housing top and the heat sinks may have a surface temperature
up to 70°C.
Do not place nor install near flammable or explosive materials.
Install the product out of reach of children.
Read the instruction manual before starting installation and
operation.
1.2 Safety Rules
DANGER
WARNING
CAUTION
HOT SURFACE
Electric shock!
High leakeage current!
Health risk!
Risk of improper handling!
Cancellation of the operating license!
Installation Manual
Solar Battery Hybrid System (T Series)
03
Heavy weight may cause serious injury to the back.
Observe a waiting time of 15 minutes.
Do not dispose of the product with household wastes.
Recyclable.
Disconnect the equipment before carrying out maintenance or repair.
Observe precautions for handling electrostatic discharge sensitive
devices.
15min
1.3 Exclusion of Liability
Trinabess will not be liable for any direct, indirect or consequential damages, losses or
costs including without restriction any economic losses of any kind, any loss or damage to
property, any personal injury, any damage or injury arising from or as a result of misuse or
abuse, or the incorrect installation, integration or operation of the product. We disclaim
any liability for direct or indirect damages due to:
1. Improper installation or commissioning,
2. Unauthorized modifications, alterations or repair attempts,
3. Inappropriate use or operation,
4. Insufficient ventilation of the device,
5. Non-compliance with relevant safety standards or regulations,
6. Flood, lightning, overvoltage, storm and fire (acts of nature).
We do not assume any liability for an incorrect country code setting.
We reserve the right to make alterations that will improve device function.
Installation Manual
Solar Battery Hybrid System (T Series)
04
2. Description
2.1 General System Description
Figure 2.1 Solar battery hybrid system
Figure 2.2 System main parts
The solar battery hybrid system is designed for a new PV installation as shown in Figure
2.1.
The system includes three main parts: hybrid inverter (with integrated EMS), battery
packs and energy meter as shown in Figure 2.2.
A B C
Installation Manual
Solar Battery Hybrid System (T Series)
PV PV
Grid
Energy Meter 1
Energy Meter 2
Grid
Meter
Load
Hybrid Inverter
Battery Bank
PV
Inverter
05
2.2 System Connection
A) Hybrid inverter
The hybrid inverter converts the DC power generated by PV modules to AC power. During
the daytime, the PV power will be first used by the household load, then the surplus be
charged into battery packs for later use. Any further surplus PV power will be fed into
public grid.
During the nighttime, the hybrid inverter will discharge the battery to supply the load.
B) Battery packs
Battery packs store the energy generated from the hybrid inverter. Each battery module
capacity is 3 kWh, the system capacity is extendable by adding more battery modules.
The capacity can be expanded to 18kWh.
C) Trina energy meter
The bi-directional energy meter is used for data collection and communication. With the
meter data, the hybrid inverter decides when to charge/discharge the battery packs.
The three main parts (DC coupling system/AC coupling system/DC & AC coupling
system) are connected as shown in Figure 2.3~2.5, which can optimise solar energy
self-use and realise peak shaving. The user can select the connection modes based on
the actual PV system.
Installation Manual
Solar Battery Hybrid System (T Series)
Figure 2.3 DC coupling system
Battery bank
Communication
RS485
BAT+
PV+
PV-
N
L3
L2
L1
G
BAT-
CAN
Grid
Grid
Meter
ME1
7 8
N’
L3’
L2’
L1’
N
L3
L2
L1
Load
Inverter
06 Installation Manual
Solar Battery Hybrid System (T Series)
Figure 2.5 DC & AC coupling system
Figure 2.4 AC coupling system
Communication
RS485
BAT+
PV+
PV-
N
L3
L2
L1
G
L1
L2
L3
N
BAT-
CAN
Grid
Grid
Meter
ME1
7 8
PV
Inverter
N’
L3’
L2’
L1’
N
L3
L2
L1
Load
ME2
N L3 L2 L1
N’ L3’ L2’ L1’
7
8
Communication
RS485
BAT+
N
L3
L2
L1
G
L1
L2
L3
N
BAT-
CAN
Grid
Grid
Meter
ME1
7 8
PV
Inverter
N’
L3’
L2’
L1’
N
L3
L2
L1
Load
ME2
N L3 L2 L1
N’ L3’ L2’ L1’
7
8
Inverter
Battery bank
Inverter
Battery bank
3. Product Specification & Packaging
3.1 Technical Specification
3.1.1 Hybrid Inverter Specification
Max. PV input power/Max. PV array size
Max. input voltage
MPPT voltage range
MPPT tracker
Max. input current
Max. short-circuit current, module array
Start pv voltage
5200W / 6800W
800V
150 ~ 700V
200V
2
11A / 11A
13.8A / 13.8A
1
15A
18.8A
4000W / 4000W
18A / 18A
120~500V
222~500V
410x540x230
< 35kg
470x600x230
< 40kg
540x670x270
< 55kg
5000W
7.2A
2.5kVA
9600W
13.9A
4.8kVA
3Ph+N/400Vac
50Hz
< 5 seconds
324V ~ 436V
50Hz
91%
95%
IP65
55dB
Forced air cooling
VDE4105, IEC62109, IEC62477
8000W / 8000W
20A / 20A
200 ~ 800V
400 ~ 800V
9800W / 12800W
900V
200 ~ 800V
2
14A / 14A
17.5A / 17.5A
300V
Max. charging/Discharging power
Max. charging/Discharging current
Operation voltage range
Battery full power voltage range
Max. output power
Rated output power
Rated output frequency
AC nominal current
Max. auto-switching time
AC voltage (L-L)
AC rated frequency
Max. backup supply power
Max. efficiency (PV-battery-grid)
Europ. efficiency (PV-grid)
IP protection class
Noise
Dimension (WxHxD) (mm)
Weight
Cooling
Certificate
Item
PV input
TB5200TH TB5200TD TB9800TH
Battery input (DC)
AC output
Backup function (optional, need an additional external backup box)
Other parameters
Description
Table 3.1 Hybrid inverter specification
07 Installation Manual
Solar Battery Hybrid System (T Series)
3.1.2 Battery Bank Specification
Item Description
Dimension (WxHxD) (mm)
Weight
Numbers of battery module
Usable battery power
Continuous battery power
Cell technology
Installation type
Communication
DOD
Cycle life
Certificate
IP protection class
Operating temperature
<1 month 0~55C;
<3 months 0~45C;
<12 months 0~25C
(before storage the SOC will be higher than 50%)
720x600
x190
<70kg
2
2x3kWh
-3kW
<100kg
3
3x3kWh
-4.5kW
<130kg
4
4x3kWh
-6kW
<160kg
5
5x3kWh
-7.5kW
<190kg
6
6x3kWh
-9kW
720x820
x190 720x1040
x190 720x1260
x190 720x1480
x190
NCA
Stand mounted or wall mounted
CAN 2.0
100%
>8000
IEC 62619, UN38.3
IP21
-10~45C (-10~0C discharging only) *
Storage conditions
Table 3.2 Battery bank specification
08 Installation Manual
Solar Battery Hybrid System (T Series)
NOTE * Battery bank is not permitted to be installed below 0C. The suggested
environment temperature for battery installation is +5 ~ +35C.
3.2 Component Dimension
Figure 3.1 Hybrid inverter dimension (TB5200TH)
Figure 3.2 Hybrid inverter dimension (TB5200TD)
Figure 3.3 Hybrid inverter dimension (TB9800TH)
410mm
540mm
230mm
470mm
600mm
230mm
670mm
540mm 270mm
09 Installation Manual
Solar Battery Hybrid System (T Series)
Figure 3.4 Battery bank dimension
Item Description
Dimension (WxHxD) (mm) 720x600
x190 720x820
x190 720x1040
x190 720x1260
x190 720x1480
x190
W
H
D
10 Installation Manual
Solar Battery Hybrid System (T Series)
Table 3.3 Battery bank dimension
11 Installation Manual
Solar Battery Hybrid System (T Series)
3.3 Unpacking the Device
3.3.1 Before Unpacking the Device
3.3.2 Packing
All products are thoroughly tested and inspected before they’re packed for transportation.
Although they’re shipped in reliable package, damage during transportation could still
occur.
It is important to inspect the shipping package prior to the installation carefully. If any
external damage on the package makes you suspect the device could be damaged or if
you find that the device is damaged after unpacking it, please report the damage
immediately to your distributor or the goods forwarder.
If it becomes necessary to return the device, please use the original packages in which
they were delivered.
To avoid injury, lift the device by the two holding grips that are accessible on the side and
take the device out of the package. Ensure a second person present to assist in the
unpacking and installation of the devices.
The solar battery hybrid system consists of inverter, battery modules and battery control
box, for different system capacities the scope of supply is different, as shown below:
Inverter
2
3
4
5
6
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Battery
module
Battery
control box
Energy
Meter
Table 3.4 Packing
Quantity
2x3kWh
3x3kWh
4x3kWh
5x3kWh
6x3kWh
3.4 Packing List
3.4.1 TB5200TH / TB5200TD Hybrid Inverter Packing List
3.4.2 TB9800TH Hybrid Inverter Packing List
A1
A2
A3
A4
A5
A6
A7
1
1
1
6
1
1
1
Hybrid inverter
Hybrid inverter mounting bracket
Aviation plug female (for AC grid connection)
Expansion tube and screw
Installation manual
User manual
Warranty
Item Quantity Description
A1
A2
A3
A4
A5
A6
A7
1
1
1
4
1
1
1
Hybrid inverter
Hybrid inverter mounting bracket
Aviation plug female (for AC grid connection)
Expansion tube and screw
Installation manual
User manual
Warranty
Item Quantity Description
A1 A2
12 Installation Manual
Solar Battery Hybrid System (T Series)
Table 3.5 TB5200TH / TB5200TD hybrid inverter packing list
Table 3.6 TB9800TH hybrid inverter packing list
A1 A2
A3 A4
A5 A6 A7
Warranty
A3 A4
A5 A6 A7
Warranty
3.4.3 Battery Module Packing List
B1
B2
B3
B4
1
1
1
2
Battery pack
Battery pack communication cable
Grounding wire
Expansion tube and screw
Item Quantity Description
B1
B2 B3 B4
13 Installation Manual
Solar Battery Hybrid System (T Series)
Table 3.7 Battery module packing list
3.4.4 Battery Control Box Packing List
C1
C2
C3
C4
C5
1
1
1
1
2
Control box
PCS communication cable
Meter communication cable
Resistor
Expansion tube and screw
Item Quantity Description
C1 C2
C4
C3 C5
Table 3.8 Battery control box packing list
3.4.5 Energy Meter Packing List
D1 1 Energy meter
Item Quantity Description
D1
14 Installation Manual
Solar Battery Hybrid System (T Series)
Table 3.9 Energy meter packing list
Do not install inverter and battery modules in direct sunlight or direct rain fall. The
shaded side of the building would be better.
Do not install the system on flammable construction materials, or in areas close to
flammable or explosive materials.
15 Installation Manual
Solar Battery Hybrid System (T Series)
Figure 4.2 Selecting installation location
4.1 Selecting Installation Location
Observe the minimum clearance distance between inverter and nearby object to
ensure proper heat dissipation.
4. Installation
1000mm Max.
300mm Min.
300mm Min.
300mm Min. 300mm Min.
500mm
Min.
Figure 4.1 System clearance refernce
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48

Trinabess Trinahome T Series Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI