EB300VGL for Frameless Glass Door/ Wall
EB195VGL for Frameless Glass Door/ Wall
EB300-Surface Mount
EB400-Surface Mount
Installation:
1.Clean the glass before installing , strike the face place on the glass
(indoor)
2.The interior width of VGL bracket is 14mm , spacer thickness is 1 mm.
3.Stick the spacer in accordance to the glass thickness (10~13mm)
4.Put silicone inside the VGL bracket to hold firmly.
5.Lock the Sunken screw.
6.Use allen wrench to install the cover.
Caution:
1.Spacers are installed indoor.
2.Lock the sunken screws slightly or it will break the glass.
Copyright
P-MU-EB-S Ver.J Published on 2011.08.22
© Gianni Industries, Inc. All Rights Reserved.
T
he th
ick
n
ess o
f g
l
as
s
is 1
0~1
3m
m
.
EB400
T
h
e th
ick
n
ess o
f g
la
s
s
i
s 1
0
~13
m
m.
Energy saving design: All Electric Dropbolt
Auto-detective circuitry: Unique self-detective logical circuitry
designed to retract the bolt until the door is properly closed.
After relock time delay for the Electric Dropbolt activates the pull
in motion, the motion will not stop until theDropbolt locks the door
properly.
When the sensor magnet in the Strike Plate detects the reed in the
lock body, the Dropbolt projects immediately.
Under the energy saving design, after the dropbolt completely
locks, the current draw will drop from high pull in current to low,
continuing”holding state”.
The reed in the lock body will automatically switches off at the
same time when the dropbolt is locked.