Lead the motor and mains cables through the
bottom plate.
ENSURE MAINS SUPPLY TO INSTALLATION IS OFF.
LOCK THE DISCONNECTOR TO OPEN POSITION.
ACx 600 MUST BE INSTALLED BY A COMPETENT PERSON.
IF IN DOUBT DO NOT INSTALL.
1
1. Measure the places for four screw holes.
Mark the hole positions. 2. Drill the holes.
3. Screw in the screws.
2
Position ACx 600 onto screws and securely
tighten in all four corners.
Note:
Lift ACx 600
by its chassis, not by its cover.
1. Undo the two screws. 2. Lift the lower edge
of the cover. 3. Disconnect the cable from
connector X2. Remove the cover.
STOP
FOR
INSTALLATION
OF OPTIONAL
EQUIPMENT, SEE
SEPARATE
INSTRUCTIONS
INCLUDED IN
THE DELIVERY.
4 5
1. Strip off the insulation from the motor cable
and mains cable. Twist the screen wires into
bundles. 2. Make suitable holes to motor and
mains cable grommets.
Before Starting Installation
CHECK BOX CONTENTS: ACx 601, Manual(s), Testing report, Ordered options, Quick Guide(s)
CHECK INSTALLATION SITE AMBIENT CONDITIONS: See Manual.
CHECK INSTALLATION SPACE: ACx 600 free space requirements are 300 mm above and below, 50 mm on the left and on the right.
CHECK INSTALLATION SURFACE: Vertical, smooth and solid, free from heat, damp and condensation.
CHECK ACCESSORIES NEEDED: See Manual for fuse, supply disconnecting device and cable specifications.
3
Mains cable
OUTPUT
STOP
CHECK THE
INSULATIONS
OF MOTOR,
AND MAINS
AND MOTOR
CABLE.
See Manual.
7
2.
1.
3.
2.
1.
3.
1.
2.
INPUT
Motor
cable
300 mm
free space
ACS 600 Installation Guide
ACS/ACC/ACP 601-0005-3 ... -0016-3,
-0006-5 ... -0020-5 and -0009-6 ... -0020-6
10
6-7
6-7
15
X2
1. Connect the motor cable.
2. Connect the mains cable.
Ensure proper earthings.
For minimal radio frequency
interference (RFI) at the motor
end:
1.Twisted screen:
Diameter (Ø) >
1/5 · Length (L),
or
2. Screen 360° earthing at cable
lead-through.
L
Ø
8
9
Control cable installation:
1. Make hole in a control cable
grommet and lead the cable into
the unit.
2. Connect the earthing wires
and the cable shield to the
earthing terminal next to the
NIOC board.
3. Connect the control cables to
the input/output terminals.
1. Connect the control panel
cable to connector X2.
2. Replace the front cover.
10
1.
2.
2.
1.
Earthing Wires
and the cable shield
3.
300 mm
free space
ABB Industry Oy Drives P.O. Box 184 FIN-00381 Helsinki tel: +358-10 22 2000 fax: +358-10 22 22681
Code: 3AFY 59019902 R0125
Effective: 3.3.1998/EN
Standard
Input/Output
Connections: See
the
Start-up
Guide
or Manual.
X2
  • Page 1 1
  • Page 2 2

ABB ACS 600 Installation Manuals

Type
Installation Manuals

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI