ClosetMaid 64-99 In. Premier Dark Java Kit Installation guide

Type
Installation guide

This manual is also suitable for

© 2018 ClosetMaid LLC | Ocala, FL 34471 | 1-800-874-0008 | www.closetmaid.com | www.closetmaid.ca
SpaceCreations Combo Kits
Installation Tips
64” - 99” Reach In
6106240
08/18
Tools you will need for assembly:
.50 in.
.25 in.
Getting Started
General Tips
© 2018 ClosetMaid LLC | Ocala, FL 34471 | 1-800-874-0008 | www.closetmaid.com | www.closetmaid.ca
Pleaserefertotheinstructionsheetprovidedintheproductpackageforthespecicsonrequired
& recommended tools for the assembly of the products.
Take an inventory of the parts for the products purchased to insure you have everything you need
for the installation.
Pre-plan the placement of the towers.
Parts List
1 - SPC Frame 24X14
Assemble and build your towers.
Placeyourtowers,makingsuretoaxthemtothewallasdirected.
Measure the length that the rods will need to be for each side. Make sure the span between units
orunitandwallisnotgreaterthan48in.Thetopshelvesandclosetrodstamaximumspaceof
48 in.
Theexpandableclosetrodsare30in.to48in.long.Ifthelengthisshorterthan30in.therodwill
need to be cut.
Installtheclosetrodsandtopshelves.
Assemble and install any drawers into the tower unit (sold separately).
4 - SPC Shelf Kit 24X14
5 - SPC Traditional Handle
Nickel
5 - SPC Drawer Kit 6X24
2 - SPC Shoe Shelf Kit 24X14
2 - SPC Top Shelf Kit
1 - SPC 24” Hang Rod
Kit Nickel
2 - SPC 30” Hang Rod Kit
Nickel
  • Page 1 1
  • Page 2 2

ClosetMaid 64-99 In. Premier Dark Java Kit Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI