![](//vs1.manuzoid.com/store/data-gzf/1af974c3d287455f1d865e87ae96e98b/2/000916136.htmlex.zip/bg2.jpg)
Getting Started
General Tips
© 2018 ClosetMaid LLC | Ocala, FL 34471 | 1-800-874-0008 | www.closetmaid.com | www.closetmaid.ca
• Pleaserefertotheinstructionsheetprovidedintheproductpackageforthespecicsonrequired
& recommended tools for the assembly of the products.
• Take an inventory of the parts for the products purchased to insure you have everything you need
for the installation.
• Pre-plan the placement of the towers.
Parts List
1 - 25 In. Starter Kit
• Assemble and build your towers.
• Placeyourtowers,makingsuretoaxthemtothewallasdirected.
• Measure the length that the rods will need to be for each side. Make sure the span between units
orunitandwallisnotgreaterthan48in.Thetopshelvesandclosetrodstamaximumspaceof
48 in.
• Theexpandableclosetrodsare30in.to48in.long.Ifthelengthisshorterthan30in.therodwill
need to be cut.
• Install the closet rods and top shelves.
• Assemble and install any drawers into the tower unit (sold separately).
3 - Top Shelf Support Kit
3 - 48 In. Top Shelf
3-25in.x10in.DDrawer