Toro Replacement Pulley Kit, Z593-D Z Master Models 74264TE and 74265TE Installation guide

Type
Installation guide
Form No. 3355-106 Rev A
Replacement Pulley Kit
For Z593-D Z Master® Models 74264, 74264TE, 74265
and 74265TE
Model No. 110-3944
Model No. 110-3945
Installation Instructions
T his kit is for installing a DFS bag g er onto a
Z593–D Z Master .
Note: Before remo ving the pulley , mak e sure the g earbo x dri v e pulley does not ha v e 4 holes around
the center hole .
Step
1
Replacing the Gearbox Drive
Pulley
Parts needed for this step:
1
Pulley
1
Square key
2 Set screw
Procedure
1. R emo v e the mo w er belt from the g earbo x
pulley assembly ( Figure 1 ).
2. R emo v e the 2 set screws , square k ey , and
g earbo x pulley from the g earbo x.
3. Install the bag g er dri v e pulley to the new
g earbo x pulley with 3 bolts (3/8 x 1-3/4
inc hes), 3 spacers , and 3 flang e n uts (3/8 inc h)
( Figure 1 ). T his hardw are is supplied with the
bag g er .
4. Install the g earbo x pulley and bag g er dri v e
pulley to the g earbo x with 2 set screws and a
square k ey ( Figure 1 ). T he pulley center hub
needs to be flush with the end of the g earbo x
shaft.
5. Install the mo w er belt bac k onto the g earbo x
pulley ( Figure 1 ).
Figure 1
1. Gearbox
5. Spacer
2. Flange nut, 3/8 inch 6. Bagger drive pulley
3. Gearbox drive pulley 7. Bolt, 1/2 x 1-3/4 inch
4. Set screw
© 2006—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
Printed in the USA.
All Rights Reserved
  • Page 1 1
  • Page 2 2

Toro Replacement Pulley Kit, Z593-D Z Master Models 74264TE and 74265TE Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI