Commercial

TODDY Commercial Operating instructions

  • Hello! I'm a chat assistant and I've reviewed the user manual for the Toddy Cold Brew System Commercial Model. I understand the instructions on how to assemble the spigot with washers and jam nuts, and how to prepare your device for brewing. If you've got questions about the assembly process or anything else, just ask!
  • What should I do before using the Cold Brew System?
    How should the spigot be positioned initially?
    How to attach the spigot correctly?
TODDY® COLD BREW SYSTEM
COMMERCIAL MODEL
|
ASSEMBLY
WASH BEFORE USE. Make sure the spigot with washer is flush
with the unit. Position the spigot upside down. Screw the nut
with washer on the end of the shank until hand-tight. Continue
to hold the nut and screw the spigot clockwise until it is in its
normal vertical position.
For complete instructions
and to learn more about
Toddy® products, visit
ToddyCafe.com/brewing.
Made in USA of U.S. and imported parts
Loveland, CO 80538 | +1 (970) 493-0788
©2022 Toddy, LLC | Version: 11-2022
Jam Nut
(Inside)
Spigot
Brewing Container Wall
Washer
(Inside) Washer
(Outside)
Jam Nut
(Inside)
Washer
(Inside)
Screw the spigot, the inside & outside washers, and the jam nut
together through the hole in the brewing container wall.
/