AVATAR SD61-6 User manual

  • Hello! I am an AI chatbot trained to assist you with the AVATAR SD61-6 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Drum Kit Installation Manual Version 1.00
a x 2
Tom x 4
Drum Module
Bass Drum Power Adapter Signal Lines Drum Key
Hi-Hat Control Bass Pedal Beater
L-Rod x 4 Cymbal Rod x 3Cymbal x 3
B x 2 C
D E F
① Drum module ② Hi-Hat ③ Crash 1 ④ Crash 2 ⑤ Tom 1
⑥ Tom 2 ⑦ Tom 3 ⑧ Snare ⑨ Hi-Hat control ⑩ Bass Drum
1. Installing tools
① A Knife (Provided by user), to gash the box tapes.
② Drum Key (Please find it in the package), to install racks and adjust pads.
2. STEPS:
① Open box with knife and take out of all the parts as below picture. Count them with Parts List.
② Assemble the racks following to below pictures,fastening screw after the assembling.
③ Connect all the pads and cymbals with module by signal lines.
※Tips: Adjust the parameters of sound module according to the User Guide.
There are 6 pcs of cable ties to help you organize these cables.
EE A
C
DD D
F
A
B
B
B
A
D
F
E
Step 1
Note
Step 2 Step 3 Step 4 Note
Note: While connect drum racks, please make sure the rack reaches the position as ① shown, and then fasten screw at position ② with drum key.
Note: Put the groove in the back of cymbal against the
embossment of the pillar stand. Adjust the cymbal to make the
groove match the pillar stand, and then fasten the pillar stand
and fasten the cymbal.
Fix the L-rod and then install the snare and Toms to the L-rod. Assemble the module;
Assemble and adjust the felt beater with bass drum.
A
C
B
/