Torqeedo 1262-10 Cruise 6.0 RS TorqLink User manual

Category
Battery chargers
Type
User manual

The Torqeedo 1262-10 Cruise 6.0 RS TorqLink is a high-performance electric outboard motor that combines power, efficiency, and versatility for a variety of boating applications. With its advanced TorqLink system, it seamlessly integrates with other Torqeedo components, allowing for a fully connected and intelligent boating experience.

The Torqeedo 1262-10 Cruise 6.0 RS TorqLink is a high-performance electric outboard motor that combines power, efficiency, and versatility for a variety of boating applications. With its advanced TorqLink system, it seamlessly integrates with other Torqeedo components, allowing for a fully connected and intelligent boating experience.

Installation Drawing: I12
Version 1.0
Power cable connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
1
3
22
U1700 mm
1
Power cable connection
Positive power cable
Negative power cable AC power cable
100-240 VAC/50-60 Hz
P
Q
B+
B-
Positive charging cable
Negative charging cable
911
10 12
Optional equipment, see seperate sheet for wiring
1000 mm
2800 mm
1800 mm
I
K
L
M
H2
1200 mm RL
1320 mm RS
AC 1500 mm
2600 mm
2600 mm
3
B+
B-
X370 mm
9
P2600 mm Q2600 mm
100-240 VAC/50-60 Hz
AC 1500 mm
Installation Drawing: I12
Version 1.0
System ground connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
1
1
2
System ground connection
Use for boats without common point for grounding
Use for boats with common point for grounding
W
W
In this conguration the motor fulllls the function of the grounding point
3
B+
B-
3
B+
B-
X370 mm
3
B+
B-
3
B+
B-
X370 mm
25 mm2 grounding cable
25 mm2 grounding cable
Installation Drawing: I12
Version 1.0
System ground connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
3
System ground connection
B-
3
B+
910 12
In case the charger is permanently installed in the boat,
the charger housing or its AC PE and battery minus pole must be
connected to the common grounding point.
The AC connection requires specialist knowledge and may only be carried
out by qualied personnel.
If necessary, have the planning and installation carried out by a specialist.
NOTE! To charge the batteries in the boat, a land connection in the boat with galvanic
isolator or isolation transformer is required according to applicable
national requirements (e.g. DIN EN ISO 13297, ABYC E-11).
Connect the charger housing and the minus battery
pole to the common grounding point.
25 mm2 grounding cable
Installation Drawing: I12
Version 1.0
Data cable connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
T
1
5000 mm
150 mm RL
270 mm RS
5000 mm
e
5000 mm
e5000 mm
e
4
Data cable connection
8 pin data cable
5 pin data cable Backbone 5 pin data cable Bus system termination resistor
e
4 pin data cable
Backbone TorqLink, 8 pin data cable
T
3
3
22
4
3000 mm
c
T
TT
5000 mm
16
Installation Drawing: I12
Version 1.0
Bill of material/Legend/Information
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
Pos. Item number Name Remarks
1 1262-10
1263-10
Cruise 6.0 R
H, I, K,
L, M
Cable set with battery switch See picture for cable length
2 Power connector max. 175 A
e Backbone cable 5-pin 5000 mm
X Parallel bridge cable 370 mm, 25 mm2
3 2106-00 Power 24-3500 Select TorqLink-Battery in throttle menu!
Due to voltagelevel above 50 V, take care of
your local requirements
e Backbone cable 5-pin 5000 mm
W System ground min. 25 mm2, not included
16 2304-00 On/Off Switch Power 24-3500
with cable
5000 mm
4 1976-00 TorqLink Throttle
c Backbone TorqLink cable 8-pin 3000 mm
9 2206-20; 2206-30;
2206-40
Charger Power 24-3500 350 W
P + DC charge cable 2600 mm; Do not extend!
Q - DC charge cable 2600 mm; Do not extend!
B+ + Battery pole
B- - Battery pole
AC AC power cable 1500 mm
2217-00 TorqLink gateway set
22 000-00858 Gateway
U Gateway Power cable 1700 mm
fAdapter T-Cable 5-pin 200 mm
e Backbone cable 5-pin 5000 mm
13 000-00876 TorqLink Terminator Bus termination resistor
18 On/Off switch with cable 2000 mm
Pos. Item number Name Remarks
Optional equipment
10 2210-00 Fast Charger Power 24-3500 1700 W
P + DC charge cable 2400 mm; Do not extend!
Q - DC charge cable 2400 mm; Do not extend!
B+ + Battery pole
B- - Battery pole
AC AC power cable 2000 mm
11 2207-00 Solar charge controller
Power 24-3500
P + Charge cable 1000 mm
Q - Charge cable 1000 mm
R + Input solar cable 1000 mm
S - Input solar cable 1000 mm
12 2211-00 Fast solar charge controller
Power 24-3500
P + Charge cable 300 mm
P1 + Charge cable 2200 mm
Q - Charge cable 2500 mm
21 Fuse 100 A/58 V
R + Input solar cable not included
S - Input solar cable not included
5
Bill of material/Legend/Information
Installation Drawing: I12
Version 1.0
Bill of material/Legend/Information
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
Connect the cruise motor and terminator to each end of the backbone.
The TorqLink bus system requires a terminator (terminating resistor) at both ends of the backbone in order
to function correctly.
One of the terminators is located in the „Terminator Single, Terminator Twin“, Throttle 1918-00“, Throttle
1976-00“ , the other is built into the cruise motor. Therefore, when installing, make sure that the components
Terminator“ and „Cruise motor“ are each connected to one end of the backbone.
The connection position of the remaining components on the backbone can be freely selected.
Keep the following points in mind when planning:
An earthing point is required for your Torqeedo system. Take into account the connection and the
cables required for this in your planning. The required cable cross-sections can be found in the
section Tools, equipment and material.
First determine and plan the installation positions of all components.
Measure the required length of the TorqLink backbone.
Measure the lengths of all required stub lines (cable connection between component
and TorqLink backbone).
When planning, please note that TorqLink drop cables must not be extended. If necessary, plan
the TorqLink backbone so that the components can be connected through the
TorqLink drop cable without an extension. If necessary, extend the TorqLink backbone to connect
a component that is far away; you can nd corresponding extensions in our accessories
catalogue.
Cables must be xed every 400 mm, plan attachment material. In places where fastening is not
possible, a scuff guard must be tted.
Openly laid cables (e.g. inatable boat) must be protected with chang protection,
plan sufcient material.
When planning, please note not to bundle power cables with data or antenna cables
(e.g. radios) for other loads.
Observe the minimum bending radius of the cables when planning.
If a second earthed onboard power system is available, ensure that both systems use a common
earthing point.
Live parts must be tted or installed with protection against accidental contact; the necessary
installation space must be taken into account during the planning stage.
Always connect batteries as the last component to the system to avoid short circuits and voltage
peaks.
Do not extend drop cables, extend backbone if necessary.
Protect plugs and contacts against contamination before installing them.
Do not pull at the cables.
Do not twist cables.
Do not install cables in permanently wet areas such as bilges.
Install cables free of chang and not around sharp edges, if necessary, attach chang protection.
Maintain bending limits.
Install plug connections free of tension and load.
Observe the minimum bending radius when laying all cables:
Torqeedo data cable 8 x diameter
Torqeedo power cable 8 x diameter
Earth cable see cable manufacturer's specica-
tions
Other power cables see cable manufacturer's specica-
tions
6
Bill of material/Legend/Information
Installation Drawing: I12
Version 1.0
Power cable connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
7
Power cable connection
Positive power cable
Negative power cable AC power cable
Positive charging cable
Negative charging cable
10
3
P
Q
B+
B-
2400 mm
2400 mm
3
B+
B-
X370 mm
P2400 mm Q2400 mm
10
100-240 VAC/50-60 Hz
AC 1500 mm
500 mm
100-240 VAC/50-60 Hz
AC 1500 mm
500 mm
Installation Drawing: I12
Version 1.0
Power cable connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
8
Power cable connection
Positive power cable
Negative power cable AC power cable
Positive charging cable
Negative charging cable
3
P
Q
B+
B-
2400 mm
2400 mm
3
B+
B-
X370 mm
P2400 mm Q2400 mm
11 11
R
S
Solar
R
S
Solar
Installation Drawing: I12
Version 1.0
Power cable connection
This installation drawing is an addition to the original operating instructions.
Read operating instructions before wiring.
9
Power cable connection
Positive power cable
Negative power cable AC power cable
Positive charging cable
Negative charging cable
3
P1
Q
B+
B-
2200 mm
2500 mm
3
B+
B-
X370 mm
P1 2200 mm
Q2500 mm
R
S
Solar
R
S
Solar
1212
P300 mm
P300 mm
21
21
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9

Torqeedo 1262-10 Cruise 6.0 RS TorqLink User manual

Category
Battery chargers
Type
User manual

The Torqeedo 1262-10 Cruise 6.0 RS TorqLink is a high-performance electric outboard motor that combines power, efficiency, and versatility for a variety of boating applications. With its advanced TorqLink system, it seamlessly integrates with other Torqeedo components, allowing for a fully connected and intelligent boating experience.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI