Super Vac SVU-50-DD Diesel User manual

Type
User manual
USER MANUAL
OPERATOR MANUAL SVU DD-50
OPERATOR MANUAL
2Revised 2-2020
OPERATOR MANUAL
This manual covers the how to use the Super Vac SVU.
For additional instruction, view installation videos at:
SVU OPERATION: .................................. bit.ly/svu-operation
SVU SECUREMENT: .............................bit.ly/svu-securement
CONTENTS
Contact Info ........................... 3
Unit Operation ..................... 4-5
Control Panel ........................4
Operation .............................5
Securement ........................6-8
Parts ................................... 6
Back Bar .............................. 7
Turnbuckles .......................... 8
Maintenance .......................... 9
SVU DD-50
3
Revised 2-2020
THANK YOU
Please allow us to express a simple thank you for investing in a SUPER VAC product. As a company we are
dedicated to producing the very best and most versatile fan package available. We take great pride in the quality
of our work and hope that you will nd many years of satisfaction from the use of this equipment.
Should you have any problems with your product please do not hesitate to contact us.
Super Vaccum Mfg Co, Inc
3842 Redman Drive
Fort Collins, CO 80524
PHONE: 1-800-525-5224
FAX: 1-970-297-7099
WEB: www.SuperVac.com
OPERATOR MANUAL
4Revised 2-2020
SVU CONTROL PANEL:
RAISE AND LOWER
ROTATE LEFT TO RIGHT
TILT BACK AND FORWARD
START ENGINE MASTER POWER
POWER ON
MONITOR
LIGHTING
POWER OFF
LOW/HIGH IDLE
RPMS
ReGen ON/OFF
SVU DD-50
5
Revised 2-2020
STEP 1: START
To start the unit, turn the key to on and the dash will
light up. (Wait a moment.)
STEP 2: MASTER POWER
When that is on, turn you master power on. That will
turn your fuel pump on and you’ll be ready to start.
STEP 3: TURN KEY
Turn the key all the way to the right to start.
PROPER USE
Get engine running and while at idol raise and
position your unit where you want it to be before
you ramp up your RPMS.
STEP 5: RAMP UP RPMS
LIghting should be above 1500 RPMs
running the LED lights.
STEP 4: SET POSITION
Raise, lower, rotate and tilt the fan head into position.
OPERATOR MANUAL
6Revised 2-2020
SVU SECUREMENT: How to tie down the SVU unit for transport.
(2) TURNBUCKLES BACK BAR
PARTS
CURBSIDE FLOOR HOOK
STREETSIDE FLOOR HOOK
CURBSIDE UNIT TIE-DOWN
STREETSIDE UNIT TIE-DOWN
BACK FLOOR HOOK
JAM NUT
SVU DD-50
7
Revised 2-2020
STEP 1: APPLY BACK BAR
STEP 1.1: Turn master power on, tilt forward.
A
B
Utilize tilt motion to get the unit in place,
tilt back to take the slack out of the bar.
STEP 1.2: Hook bar (side A) to oor hook.
STEP 1.3: Hook bar (side B) into eyelet.
STEP 1.4: Turn master power on, tilt back until bar is tight.
STEP 1.2
STEP 1.3
OPERATOR MANUAL
8Revised 2-2020
STEP 2: APPLY TURNBUCKLES
STEP 2.1: With back bar being tight, hook turnbuckle
(side A) into streetside oor hook.
STEP 2.2: Hook turnbuckle (side B) into streetside unit
tie-down, turn bar to right until tight.
STEP 2.3: Hook second turnbuckle (side A) into curbside
oor hook.
STEP 2.4: Hook turnbuckle (side B) into curbside unit tie-
down, turn bar to right until tight.
STEP 2.5: Secure the jam nut. STEP 2.6: Place pins in bar hook eyelets to hold.
Make sure turnbuckles and back bar are removed before operating unit.
SVU DD-50
9
Revised 2-2020
MAINTENANCE:
ENGINE:
Refer to Cummins supplement for engine maintenance.
SCISSOR LIFT:
Refer to Advance Lift supplement for scissor lift maintenance.
SVU UNIT:
After each use:
;Clean and inspect unit after each use.
;Keep debris clean from shroud and blade area.
;Inspect covers and fasteners etc. for tightness on a regular basis.
WARNING
Never operate with any guards, covers or other components
not properly in place and in good condition.
!
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10

Super Vac SVU-50-DD Diesel User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI