FSR T6-LB-AC2U1, T6-LB-UN Installation guide

  • Hello! I've reviewed the provided installation instructions for the FSR T6-LB-UN Universal Bracket. This document details the steps for mounting the bracket, routing cables, and securing IPS inserts. I'm ready to assist with any questions you may have regarding the installation process or the bracket's features.
  • What type of screws are included with the universal bracket?
    How can I mount the universal bracket?
    What is a Cable / IPS Blank used for?
FSR
244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207
43306 LIT1614A
T6-LB-UN UNIVERSAL BRACKET INSTALLATION INSTRUCTIONS
1. ROUTE CABLES THRU OPENING(S)
IN THE CABLE / IPS BLANK.
SECURE CABLE / IPS BLANK(S) TO
UNIVERSAL BRACKET.
2. DETERMINE MOUNTING HEIGHT AND INSTALL UNIVERSAL BRACKET INTO CHASSIS. UNIVERSAL BRACKET
MAY BE INSTALLED FROM TOP OR BOTTOM.
#4 x 5/16" HI-LO SCREW
(INCLUDED WITH
UNIVERSAL BRACKET)
(4) #6 X 3/8" HI-LO PAN HEAD
SCREW (INCLUDED
WITH UNIVERSAL BRACKET)
IPS INSERT(S) USE EITHER SIDE
(SOLD SEPARATELY - (2) SINGLE OR (1) DOUBLE
IPS INSERT SHOWN) SEE LIT1150 FOR AN
ASSORTMANT OF AVAILABLE IPS INSERTS
CABLE / IPS BLANK
IS SUPPLIED
WITH TABLE BOX
T6-LB-UN
UNIVERSAL
BRACKET
FRAME
BREAK OFF
AS NECESSARY
INTERFACE CABLE(S)
(BY CUSTOMER)
1. ROUTE WIRES THRU OPENING IN
UNIVERSAL BRACKET AND MAKE
NECCESSARY WIRING
CONNECTIONS TO IPS INSERT(S)
(SOLD SEPARATELY). SECURE
IPS INSERT(S) TO UNIVERSAL
BRACKET.
OR
e.g., T6, RT6-S3,
RT6-S4, etc.
e.g., RT6-R2,
RT6-RD4,
RT6-CL2, etc.
/