DIFBA2002S00S

Panduit DIFBA2002S00S User manual

  • Hello! I am an AI chatbot trained to assist you with the Panduit DIFBA2002S00S User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
  • Where do I install the bonding cage nuts?
    How do I secure the switch ducting to the equipment rails?
    How do I adjust the position of the switch duct seals?
    How do I route the switch power cable?
    How do I install the Front Perforated Plate?
FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2014
V00029ER
Page 1 of 4
DIFBA2002S00S
(installed in Net-Access
S-Type Server Cabinet)
Switch Inlet Duct
DIFBA2002S00S
Cisco Nexus 9396PX Switch
(reference)
For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
V00029ER
Page 2 of 4
Intended
Mounting
Location
(2 rack spaces)
Prepare Switch for Ducting Installation
-Remove bottom screws from front of switch rails and discard.
FRONT OF
CABINET
Install Cage Nuts
-Insert [2] Bonding cage nuts per equipment rail in rack space immediately above switch rails, at front of cabinet
FRONT OF
CABINET
[2] Bonding Cage Nuts
(install in Rack Space
above switch rails)
For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
V00029ER
Page 3 of 4
FRONT OF
CABINET
Install Switch Ducting
-Secure DIFBA2002S00S switch ducting to equipment rails with [4] screws
-Do not tighten [2] bottom screws --- Leave slightly extended for Front Perforated Plate installation (see page 4)
[2] Bottom Screws
Provided with kit (with matching cage nuts if needed)
(leave slightly extended)
[2] Bonding Screws
Adjust Switch Ducting
-Use [4] wing nuts and tooth washers to adjust position of switch duct seals
-Install foam seal (if necessary) to seal ducting to bottom of switch
[4] Wing Nuts and Tooth Washers
Install Foam Seal
(if necessary)
For Instructions in Local Languages
and Technical Support:
www.panduit.com/resources/install_maintain.asp
E-mail:
Fax:
(866)405-6654
www.panduit.com
INSTALLATION INSTRUCTIONS
V00029ER
Page 4 of 4
Routing of Switch Power Cable
-Route switch power cable through power grommet (located on either side of DIFBA2002S00S)
-Use utility knife to slit power grommet(s) along guide lines, as needed, to allow for power cord pass-through
Switch Power Cable
[2] Power Grommets
Slit Power Grommet(s) to allow
for power cord pass-through
(use utility knife)
Install Front Perforated Plate
-Slide slots at bottom of Front Perforated Plate over [2] bottom screws
-Secure top of Front Perforated Plate to switch ducting and equipment rails with [2] bonding screws, then tighten [2] bottom screws
[2] Bonding Screws.
[2] Bottom Screws
(tighten after plate installation)
/