Chatsworth Products 39133-001 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Chatsworth Products 39133-001 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
EQUIPMENT GROMMET KIT
IIS-739133, 02/18/13, Rev. 1, CPI/JAG
800-834-4969 (USA & Canada) • www.chatsworth.com • t[email protected]
For international phone numbers, see our website or contact CPI Tech Support.
This drawing contains proprietary and confidential information and is protected by U.S. and international law. Unauthorized reproduction, disclosure or use of the drawing or
the information therein is expressly forbidden except as agreed to in writing by Chatsworth Products, Inc.
Page 1 of 1
Installation Instructions
Included Hardware
Grommets, 8ea.
Assembly Sequence (Fig. 1).
1. Check orientation of grommet. Snaps must be facing the equipment rail.
2. Insert grommet into rectangular cutout of equipment rail from the
front of the rail. Push on grommet until snaps engage around sheet metal rail.
Cable Penetration
1. Grommet is scored to facilitate cutting.
2. Use utility knife to cut minimum material required to route cabling
(Fig. 2).
Fig. 1
Equipment Rail
Equipment Rail
Cabinet not shown for clarity
Fig. 2
Cutting the Grommet
Grommet
Utility Knife
/