R261-3C0

Gigabyte R261-3C0 Owner's manual

  • Hello! I am a chat assistant, I have analyzed the provided user manual for the King Slide Rail Kit 3A02-600. This manual guides you through the installation process, including removal of the inner rail, installing it onto a chassis, attaching the outer rails and completing the chassis insertion. The manual also includes information about checking rack post type and switching screws. I'm ready to answer any questions you might have about the installation process.
  • What should I do if the rack post is round hole type?
    Are front and rear bracket installation the same?
    Are the L and R sides of rail symmetrical?
IYAR3I2693A2-C
3A02-600
R
Copyright © 2017KingSlide.AllRightsReserved
innerrail
outer rail / bracket
Pull
Click!
7.1 Round Hole
9.5 Square Hole
(Pre-installed)
Click!
M4x4
Click!
Pull
Click!
pull/push
locking
M5X13L
locking
Pull
DetachFrontBracketfromRackPost
Release the latch to
detach the inner rail.
1) Remove theinner rail.
Pull tab forward
and take out
innerrail.
Note: Please check rack post type. The rail
pre-installed type is for square hole post. If
rack post is round hole post, please switch to
the suitable screws.
Remove A type screws(pre-installed)
and switch to B type screws.
2) Install the inner rail onto chassis.
3) Fix the outer rail/bracket assembly to the frame. DetachFrontBracketfromRackPost
Note:
Front and rear bracket installation are the same.
L,R side of rail are symmetrical.
Please repeat installation step for the
other side.
4) Insert chassis to complete the installation.
.Ensure ball bearing retainer is located at the front of the rail.
➋.Insert the chassis into outer rails.
.When hit a stop , please pull / push the release tab on the inner rails.
.➎.Tighten chassis with shipping screws.
DetachFrontBracketfromRackPost
.Loosen shipping screw to pull out chassis.
➋.Press the disconnect tab forward to remove chassis.
/