Broadcom Brocade X7-8 Director Hardware User guide

Type
User guide
Brocade
®
X7-8 Director Hardware Installation Guide
Installation Guide
30 April 2020
X7-8-Install-IG100
30 April 2020
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Table of Contents
Copyright Notice.................................................................................................................................. 8
Introduction...........................................................................................................................................9
About This Document......................................................................................................................................................9
Supported Hardware........................................................................................................................................................ 9
Notes, Cautions, and Danger Notices......................................................................................................................... 11
Contacting Technical Support for Your Brocade
®
Product.......................................................................................11
Document Feedback...................................................................................................................................................... 12
Device Overview.................................................................................................................................13
Product Features............................................................................................................................................................ 13
Hardware Components.................................................................................................................................................. 14
Port-Side View of the Device........................................................................................................................................ 15
Port-Side Slot Numbering............................................................................................................................................. 17
Nonport-Side View of the Device................................................................................................................................. 17
Preparing for Installation.................................................................................................................. 19
Safety Precautions......................................................................................................................................................... 19
Facility Requirements.................................................................................................................................................... 21
Time and Items Required.............................................................................................................................................. 21
Shipped Items................................................................................................................................................................. 23
Quick Installation Checklists........................................................................................................................................ 23
Mounting the Device..........................................................................................................................26
Mounting Options...........................................................................................................................................................26
Mounting Precautions....................................................................................................................................................26
Unpacking and Transporting the Device..................................................................................................................... 27
Installing the 14U Rack Mount Kit for Four-Post Racks (XBR-DCX-0120 and XBR-DCX-0152)..............................27
Time and Items Required......................................................................................................................................... 28
Parts List................................................................................................................................................................... 28
Assembling the Rack Hardware............................................................................................................................... 29
Installing the Device in the Rack..............................................................................................................................32
Installing the 14U Chassis Mid-Mount Rack Kit for Two-Post Racks (XBR-DCX-0121).......................................... 35
Time and Items Required......................................................................................................................................... 35
Parts List................................................................................................................................................................... 35
Assembling the Rack Hardware............................................................................................................................... 37
Installing the Device in the Rack..............................................................................................................................38
Initial Setup and Verification.............................................................................................................42
Configuration and Verification Task Guide................................................................................................................. 42
Items Required................................................................................................................................................................43
X7-8-Install-IG100
2
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Providing Power to the Device.....................................................................................................................................43
Connecting the Power Cord to AC Power Supplies.................................................................................................44
Connecting to HVAC/HVDC Power Supplies........................................................................................................... 44
Using HVAC/HVDC Power Cords......................................................................................................................47
Establishing a Serial Connection to the Device......................................................................................................... 48
Configuring the IP Addresses...................................................................................................................................... 50
Establishing an Ethernet Connection to the Device.................................................................................................. 51
Setting the Domain ID................................................................................................................................................... 52
Setting the Date and Time............................................................................................................................................ 52
Setting the Time Zone.............................................................................................................................................. 53
Synchronizing the Local Time with an External Source...........................................................................................54
Customizing the Chassis and Switch Name............................................................................................................... 54
Verifying Installed Licenses and the License Key..................................................................................................... 55
Verifying Correct Operation.......................................................................................................................................... 56
Backing Up the Configuration...................................................................................................................................... 56
Powering Down the Chassis.........................................................................................................................................57
Installing Transceivers and Cables..................................................................................................60
Supported Transceivers and Cables............................................................................................................................60
Port and Extension Blade Transceivers................................................................................................................... 62
Core Routing Blades.................................................................................................................................................63
Time and Items Required.............................................................................................................................................. 65
Precautions Specific to Transceivers and Cables......................................................................................................65
Cleaning the Fiber-Optic Connectors.......................................................................................................................... 66
Cable Management.........................................................................................................................................................66
Installing an SFP+ Transceiver.....................................................................................................................................66
Replacing an SFP+ Transceiver................................................................................................................................... 68
Installing a QSFP Transceiver...................................................................................................................................... 69
Replacing a QSFP Transceiver.....................................................................................................................................70
Verifying the Operation of New Transceivers............................................................................................................. 71
Monitoring the Device....................................................................................................................... 72
Introduction..................................................................................................................................................................... 72
Interpreting FC32-X7-48 Port Blade LEDs................................................................................................................... 72
Interpreting FC64-48 Port Blade LEDs.........................................................................................................................74
Interpreting FC32-64 Port Blade LEDs.........................................................................................................................76
Interpreting Extension Blade LEDs..............................................................................................................................79
Interpreting Control Processor Blade LEDs............................................................................................................... 81
Interpreting Core Routing Blade LEDs........................................................................................................................83
Interpreting WWN Card LEDs....................................................................................................................................... 85
Interpreting Power Supply LEDs.................................................................................................................................. 86
X7-8-Install-IG100
3
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Interpreting Fan Assembly LEDs................................................................................................................................. 89
Interpreting POST and Boot Results........................................................................................................................... 90
POST......................................................................................................................................................................... 90
Boot........................................................................................................................................................................... 91
Optical Transceiver Requirements............................................................................................................................91
Using Monitoring Commands....................................................................................................................................... 91
errDump and errShow...............................................................................................................................................92
fanShow.....................................................................................................................................................................92
haShow......................................................................................................................................................................92
historyShow............................................................................................................................................................... 93
psShow...................................................................................................................................................................... 95
sensorShow............................................................................................................................................................... 95
sfpShow..................................................................................................................................................................... 96
slotShow.................................................................................................................................................................. 102
supportSave.............................................................................................................................................................102
tempShow................................................................................................................................................................105
Running Diagnostic Tests........................................................................................................................................... 106
Port and Extension Blades............................................................................................................. 108
FC32-X7-48 Port Blade Overview............................................................................................................................... 108
FC32-X7-48 Port Blade Numbering and Trunking................................................................................................. 108
FC64-48 Port Blade Overview..................................................................................................................................... 110
FC64-48 Port Blade Numbering and Trunking....................................................................................................... 111
FC32-64 Port Blade Overview..................................................................................................................................... 113
FC32-64 Port Blade Numbering and Trunking....................................................................................................... 114
Extension Blade Overview.......................................................................................................................................... 116
Extension Features................................................................................................................................................. 117
SX6 Blade Port Numbering and Trunking.............................................................................................................. 118
Blade-Specific Precautions......................................................................................................................................... 119
Faulty Blade Indicators................................................................................................................................................119
Time and Items Required for Removal and Installation.......................................................................................... 120
Removing a Blade........................................................................................................................................................ 120
Installing a Blade..........................................................................................................................................................122
Verifying Blade Operation........................................................................................................................................... 123
Core Routing Blades....................................................................................................................... 124
Core Routing Blade Overview.................................................................................................................................... 124
CR64-8 Port Numbering......................................................................................................................................... 124
ICL Trunking Groups...............................................................................................................................................126
ICL Cabling Configurations..................................................................................................................................... 127
Blade-Specific Precautions......................................................................................................................................... 129
X7-8-Install-IG100
4
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Faulty Core Routing Blade Indicators....................................................................................................................... 130
Time and Items Required............................................................................................................................................ 130
Replacing a Core Routing Blade................................................................................................................................131
Preparing for Replacement..................................................................................................................................... 131
Removing a Core Routing Blade............................................................................................................................132
Installing a Core Routing Blade..............................................................................................................................133
Verifying Blade Operation........................................................................................................................................... 134
Control Processor Blades...............................................................................................................136
Control Processor Blade Overview............................................................................................................................136
CPX7 Port Identification..........................................................................................................................................136
Blade-Specific Precautions......................................................................................................................................... 137
Blade Fault Indicators..................................................................................................................................................138
Blade Replacement Task Guide..................................................................................................................................138
Time and Items Required for Replacement...............................................................................................................139
Preparing for Replacement......................................................................................................................................... 139
Replacing a CP Blade..................................................................................................................................................140
Hot-Swap Procedure............................................................................................................................................... 141
Removing a Blade........................................................................................................................................... 141
Installing a Blade............................................................................................................................................. 142
Verifying and Synchronizing Firmware on Blades...........................................................................................143
Cold-Swap Procedure............................................................................................................................................. 147
Removing a Blade........................................................................................................................................... 147
Installing a Blade............................................................................................................................................. 148
Completing the Replacement..................................................................................................................................149
Verifying Blade Operation........................................................................................................................................... 150
WWN Cards.......................................................................................................................................151
WWN Card Overview....................................................................................................................................................151
WWN Card Location and Numbering..................................................................................................................... 151
Precautions Specific to WWN Cards......................................................................................................................... 152
WWN Card Fault Indicators.........................................................................................................................................152
WWN Card Replacement Task Guide.........................................................................................................................154
Time and Items Required for Replacement...............................................................................................................154
Using the wwnrecover Utility......................................................................................................................................154
Preparing for WWN Card Replacement..................................................................................................................... 156
Hot-Swap Replacement................................................................................................................................................157
Cold-Swap Replacement..............................................................................................................................................158
Removing the WWN Card and Bezel......................................................................................................................... 160
Configuring the Airflow Direction on WWN Cards...................................................................................................161
Verifying WWN Card Operation.................................................................................................................................. 161
X7-8-Install-IG100
5
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Power Supply Assemblies.............................................................................................................. 162
AC Power Supply Overview........................................................................................................................................ 162
HVAC/HVDC Power Supply Overview........................................................................................................................ 163
Power Supply Assembly Numbering......................................................................................................................... 164
Fan and Power Supply Airflow...................................................................................................................................165
Precautions Specific to Power Supply Assembly.................................................................................................... 166
Power Supply Assembly Fault Indicators................................................................................................................. 166
Power Supply Assembly Task Guide.........................................................................................................................166
Time and Items Required............................................................................................................................................ 167
Removing a Power Supply..........................................................................................................................................168
Installing a Power Supply........................................................................................................................................... 170
Verifying Power Supply Operation............................................................................................................................. 170
Fan Assemblies................................................................................................................................ 171
Fan Assembly Overview..............................................................................................................................................171
Fan and Power Supply Airflow............................................................................................................................... 172
Fan Assembly Numbering.......................................................................................................................................173
Precautions Specific to Fan Assemblies...................................................................................................................174
Fan Assembly Fault Indicators...................................................................................................................................175
Fan Assembly Task Guide.......................................................................................................................................... 175
Time and Items Required............................................................................................................................................ 176
Removing a Fan Assembly......................................................................................................................................... 176
Installing a Fan Assembly...........................................................................................................................................177
Verifying Fan Operation...............................................................................................................................................178
Blade Filler Panels........................................................................................................................... 179
Blade Filler Panel Removal and Replacement..........................................................................................................179
Removing a Filler Panel.............................................................................................................................................. 179
Installing a Filler Panel................................................................................................................................................180
Cable Management Comb............................................................................................................... 182
Cable Management Comb Overview.......................................................................................................................... 182
Time and Items Required for Removal and Installation.......................................................................................... 182
Removing the Cable Management Comb.................................................................................................................. 183
Installing the Cable Management Comb....................................................................................................................183
Chassis Door.................................................................................................................................... 184
Chassis Door Overview............................................................................................................................................... 184
Time and Items Required............................................................................................................................................ 184
Removing a Chassis Door.......................................................................................................................................... 184
Installing a Chassis Door............................................................................................................................................ 185
Replacing the Chassis.....................................................................................................................187
Chassis Replacement Overview................................................................................................................................. 187
X7-8-Install-IG100
6
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Precautions Specific to Chassis Replacement.........................................................................................................187
Chassis Replacement Task Guide..............................................................................................................................187
Chassis Fault Indicators..............................................................................................................................................188
Time and Items Required............................................................................................................................................ 188
Preparing for Replacement......................................................................................................................................... 189
Recording Critical Device and SAN Information.....................................................................................................189
Disconnecting from the Network and Fabric.......................................................................................................... 193
Removing Components from the Chassis................................................................................................................ 193
Installing the Replacement Chassis...........................................................................................................................194
Installing Components into the Chassis................................................................................................................... 194
Synchronizing Airflow Direction on WWN Cards..................................................................................................... 195
Downloading the Configuration..................................................................................................................................196
Reconnecting the System to the Network and Fabric............................................................................................. 196
Verifying Correct Operation of the System...............................................................................................................197
Verifying Correct Configuration of the Fabric.......................................................................................................... 198
Regulatory Statements.................................................................................................................... 200
BSMI Statement (Taiwan).............................................................................................................................................200
Canadian Requirements.............................................................................................................................................. 200
CE Statement................................................................................................................................................................ 200
China ROHS.................................................................................................................................................................. 200
FCC Warning (U.S. Only).............................................................................................................................................200
KCC Statement (Republic of Korea).......................................................................................................................... 201
VCCI Statement.............................................................................................................................................................201
Cautions and Danger Notices.........................................................................................................202
Cautions.........................................................................................................................................................................202
Danger Notices............................................................................................................................................................. 207
Revision History............................................................................................................................... 211
X7-8-Install-IG100
7
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Copyright Notice
Copyright
©
2020 Broadcom. All Rights Reserved. Broadcom, the pulse logo, Brocade, the stylized B logo, ClearLink,
Fabric OS, and Flexport are among the trademarks of Broadcom in the United States, the EU, and/or other countries. The
term “Broadcom” refers to Broadcom Inc. and/or its subsidiaries.
Broadcom reserves the right to make changes without further notice to any products or data herein to improve reliability,
function, or design. Information furnished by Broadcom is believed to be accurate and reliable. However, Broadcom does
not assume any liability arising out of the application or use of this information, nor the application or use of any product or
circuit described herein, neither does it convey any license under its patent rights nor the rights of others.
The product described by this document may contain open source software covered by the GNU General Public License
or other open source license agreements. To find out which open source software is included in Brocade products, to view
the licensing terms applicable to the open source software, and to obtain a copy of the programming source code, please
download the open source disclosure documents in the Broadcom Customer Support Portal (CSP). If you do not have a
CSP account or are unable to log in, please contact your support provider for this information.
X7-8-Install-IG100
8
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Introduction
About This Document
This hardware installation guide contains procedures and safety requirements for installing the Brocade X7-8 Director into
a rack system or as a stand-alone device. Also provided are steps to initially configure the director for operation, verify and
monitor operation, replace switch field-replaceable units (FRUs), and install transceivers and cables.
Starting with this release, all new and modified content is listed in the Revision History section at the end of this
document.
Supported Hardware
The following tables list the orderable SKUs and the rack mount kits that are supported on this device. The first release of
this product was at Fabric OS
®
9.0.0.
Table 1: Supported FRUs
SKU Part Number Short Description Introduced (OS) Currently Supported
XBR-X6-
RACNPIPSU-0104
Provides 1450W (100–120 VAC) and
2870W (200–240 VAC). This model
supports nonport-side intake (NPI) airflow.
Fabric OS 9.0.0 Yes
AC Power Supply
XBR-X6-
RACNPEPSU-0104
Provides 1450W (100–120 VAC) and
2870W (200–277 VAC). This model
supports nonport-side exhaust (NPE)
airflow.
Fabric OS 9.0.0 Yes
XBR-X6-
HVNPIPSU-0104
Dual-function high-voltage model provides
the following power output from either
high-voltage AC or DC power source:
1450W (100–120 VAC)
2870W (200–277 VAC)
2870W (240–380 VDC)
This model supports nonport-side intake
(NPI) airflow.
Fabric OS 9.0.0 Yes
HVAC/HVDC Power
Supply
XBR-X6-
HVNPEPSU-0104
Dual-function high-voltage model provides
the following power output from either
high-voltage AC or DC power source:
1450W (100–120 VAC)
2870W (200–277 VAC)
2870W (240–380 VDC)
This model supports nonport-side exhaust
(NPE) airflow.
Fabric OS 9.0.0 Yes
XBR-X6-
FANNPI-0122
Supports NPI airflow Fabric OS 9.0.0 Yes
Fan Assembly
XBR-X6-
FANNPE-0122
Supports NPE airflow Fabric OS 9.0.0 Yes
X7-8-Install-IG100
9
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
SKU Part Number Short Description Introduced (OS) Currently Supported
FC32-64 Blade
XBR-X6-0164
Port blade with 16 QSFP+ Flexports
that
can be configured for FC or FCoE
operation. Each port can operate at
speeds up to 4x32Gb/s port for a total
of 64 32Gb/s ports per blade with FC
transceivers installed. Optionally, you can
install Ethernet transceivers and configure
for FCoE operation. Various GbE speeds
are supported.
Fabric OS 9.0.0 Yes
FC64-48 Blade
XBR-X764-0148
Port blade with 48 front-end 64Gb/s
FC SFP+ ports with the edge switch
interconnect to the core blades. All FC
blade features are supported. Supported
SFPs include 10Gb/s, 32Gb/s, and 64Gb/
s FC.
Fabric OS 9.0.0
Yes
FC32-X7-48 Blade
XBR-X732-0148
Port blade with 48 front-end 32Gb/s FC
SFP+ ports with edge switch interconnect
to the core blades. All FC blade features
are supported. Supported SFPs include
32Gb/s, 16Gb/s, and 10Gb/s FC.
Fabric OS 9.0.0
Yes
CPX7 Blade
XBR-CPX7-0103 Control processor (CP) blade Fabric OS 9.0.0 Yes
CR64-8 Blade
XBR-X78-0106 Core routing blade provides 384 backend
FC links to the port blades in the
X7-8 Director. Each CR64-8 blade
provides 16 QSFP connections supporting
64 Gen 7 ICL ports.
Fabric OS 9.0.0
Yes
SX6 Blade
XBR-SX6-0000 Extension blade with 16 32Gb/s Fibre
Channel SFP+ ports, 16 10GbE SFP+
ports, and 2 40GbE QSFP+ ports
Fabric OS 8.0.1 Yes
WWN Card
XBR-X7-0124 World Wide Name card Fabric OS 9.0.0 Yes
Blade Sot Filler
Panel
XBR-X7-0128 Required to cover empty slot to maintain
airflow in chassis.
Fabric OS 9.0.0 Yes
Power Supply
Assembly Slot
Filler Panel
XBR-X6-0130 Required to cover empty slot to maintain
airflow in chassis.
Fabric OS 8.0.1 Yes
The following blades require optics that are labeled with an SEC designation:
Brocade FC64-48 Port Blade
Brocade FC32-X7-48 Port Blade
The following image provides an example of an optic label with SEC in the description (32G LW-SEC 10km).
X7-8-Install-IG100
10
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Table 2: Rack Mount Kits
Kit Par Number Short Description
XBR-DCX-0121 Mid-mount rack mount kit for two-post rack
XBR-DCX-0120 14U rack mount kit for four-post rack (27–
31 in.)
Rack Mount Kits
XBR-DCX-0152 14U rack mount kit for four-post rack (22
in.)
XBR-DCX4S-0120 27–31-in. rail rack mount kit for four-post
rack
XBR-DCX4S-0121 Airflow diversion kit for four-post rack (27–
31 in.)
XBR-DCX4S-0130 Airflow diversion kit for four-post rack (18–
24 in.)
Rack Mount Kits
XBR-X64-0126 8U mid-mount rack kit for X6-4 Director for
two-post rack
Notes, Cautions, and Danger Notices
Notes, cautions, and danger statements may be used in this document.
NOTE
A Note provides a tip, guidance, or advice, emphasizes important information, or provides a reference to related
information.
CAUTION
A Caution statement alerts you to situations that can be potentially hazardous to you or cause damage to
hardware, firmware, software, or data.
DANGER
A Danger statement indicates conditions or situations that can be potentially lethal or extremely hazardous to
you. Safety labels are also attached directly to products to warn of these conditions or situations.
Contacting Technical Support for Your Brocade
®
Product
If you purchased Brocade product support from a Broadcom OEM/solution provider, contact your OEM/solution provider
for all your product support needs.
X7-8-Install-IG100
11
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
OEM/solution providers are trained and certified by Broadcom to support Brocade products.
Broadcom provides backline support for issues that cannot be resolved by the OEM/solution provider.
Brocade Supplemental Support augments your existing OEM support contract, providing direct access to Brocade
expertise. For more information on this option, contact Broadcom or your OEM.
For questions regarding service levels and response times, contact your OEM/solution provider.
For product support information and the latest information on contacting the Technical Assistance Center, go to https://
www.broadcom.com/support/fibre-channel-networking/. If you have purchased Brocade
®
product support directly from
Broadcom, use one of the following methods to contact the Technical Assistance Center 24x7.
Online Telephone
For nonurgent issues, the preferred method is to log in to
myBroadcom at https://www.broadcom.com/mybroadcom. (You
must initially register to gain access to the Customer Support
Portal.) Once there, select Customer Support Portal > Support
Portal. You will now be able to navigate to the following sites:
Knowledge Search: Clicking the top-right magnifying glass
brings up a search bar.
Case Management: The legacy MyBrocade case
management tool (MyCases) has been replaced with the Fibre
Channel Networking case management tool.
DocSafe: You can download software and documentation.
Other Resources: Licensing Portal (top), SAN Health (top and
bottom), Communities (top), Education (top).
Required for Severity 1 (critical) issues:
Please call Fibre Channel Networking Global Support at one of
the numbers listed at https://www.broadcom.com/support/fibre-
channel-networking/.
Document Feedback
Quality is our first concern. We have made every effort to ensure the accuracy and completeness of this document.
However, if you find an error or an omission or if you think that a topic needs further development, we want to hear from
you. Send your feedback to [email protected]. Provide the publication title, publication number, topic
heading, page number, and as much detail as possible.
X7-8-Install-IG100
12
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Device Overview
Product Features
Key product features for this device include the following:
Redundant and hot-swappable SFP+, SFP28, QSFP+, and QSFP56 transceivers; port, extension, control processor
(CP), and core routing (CR) blades; power supply assemblies, fan assemblies, and WWN cards that enable a high-
availability platform and allow nondisruptive software upgrades for mission-critical SAN applications.
Support for the following features when using the FC32-64 blade:
Up to 16 QSFP ports on each FC32-64 port blade that provide 4x32Gb/s, 4x16Gb/s, 4x8Gb/s, 4x4Gb/s, 4x25GbE,
or 40GbE operation. Port speeds for 4x32Gb/s transceivers can auto-negotiate between 4x32Gb/s and 4x16Gb/s.
Port speeds for 4x16Gb/s transceivers can auto-negotiate between 4x16Gb/s, 4x8Gb/s, and 4x4Gb/s.
Flexport technology that allows you to configure each of the 16 QSFP ports on a blade for FC operation or Ethernet
operation for FCoE connections. For details on supported transceivers and speeds, see Supported Transceivers
and Cables.
Up to four blades and all FC transceivers installed, up to 256 32Gb/s external ports are possible in a single chassis,
enabling high-density SAN configurations with a reduced footprint.
Trunking technology that allows groups of up to eight ports to create high-performance 256Gb/s ISL trunks between
switches using 32Gb/s ports.
Support for the following features when using the FC64-48 blade:
Port blade with 48 front-end 64Gb/s FC SFP+ ports with the edge switch interconnect to the core blades.
Supported SFPs include 10Gb/s, 32Gb/s, and 64Gb/s FC.
Support for 48 Fibre Channel ports on each FC64-48 port blade that provide 64Gb/s, 32Gb/s, 16Gb/s, 10Gb/
s, and 8Gb/s. The 10Gb/s transceivers can be used for any port on the FC64-48 port blades. Note that 10Gb/s
transceivers on the FC64-48 and SX6 blade are not interchangeable. For details on supported transceivers and
speeds, see Supported Transceivers and Cables.
Trunking technology groups up to eight ports to create high-performance 512Gb/s ISL trunks between switches
using 64Gb/s ports.
Support for the following features when using the FC32-X7-48 blade:
Port blade with 48 front-end 32Gb/s FC SFP+ ports.
Supported SFPs include 32Gb/s, 16Gb/s, and 10Gb/s FC.
Support for 48 Fibre Channel ports on each FC32-X7-48 port blade that provide 32Gb/s, 16Gb/s, 10Gb/s, 8Gb/s,
and 4Gb/s. The 10Gb/s transceivers can be used for any port on the FC32-X7-48 port blades. Note that 10Gb/s
transceivers on the FC32-X7-48 and SX6 blade are not interchangeable. For details on supported transceivers and
speeds, see Supported Transceivers and Cables.
Trunking technology groups up to eight ports to create high-performance 256Gb/s ISL trunks between switches
using 32Gb/s ports.
Support for the following features when using the SX6 Blade:
Support for 16 Fibre Channel ports supporting 4, 8, 16, and 32Gb/s.
16GbE ports supporting 1 or 10Gb/s.
Two GbE ports supporting 40Gb/s on SX6 extension blades.
NOTE
Note that 10Gb/s transceivers on the FC64-48 and the FC32-X7-48 are not interchangeable with the Brocade
SX6 Blade. For details on supported transceivers and speeds, see Supported Transceivers and Cables.
Considerations for the Brocade SX6 Blade:
X7-8-Install-IG100
13
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
The SX6 extension blades perform as extension platforms to support Fibre Channel (FC) and FICON data flows
and IP-based storage data flows over an IP WAN.
Universal ports that self-configure as E_Ports, F_Ports, EX_Ports, M_Ports (mirror ports), and FICON ports. Note
that the 10Gb/s ports on the FC64-48 and FC32-X7-48 port blades can function as E_Ports only.
ClearLink
®
Diagnostic port (D_Port) functionality on Fibre Channel ports.
Data compression capabilities through the port blades when ports are configured as ISLs.
Hardware Components
The device has a modular and scalable mechanical construction that allows a wide range of flexibility in installation, fabric
design, and maintenance. The device can be mounted with the cables facing either the front or the rear of the equipment
rack. It consists of the following hardware components:
Up to eight slots for hot-swappable port blade assemblies, providing up to 384 64Gb/s Fibre Channel ports if FC64-48
port blades are installed or 512 32Gb/s Fibre Channel ports if FC32-64 port blades are installed. Flexport technology
allows QSFP ports on this blade to be configured for FCoE operation at 4x10GbE, 4x25GbE, and 40GbE speeds when
using an FC32-64 port blade. For a list of supported transceivers for these blades, see Supported Transceivers and
Cables
Two half-size slots for control processor (CP) blades:
A single active CP blade can control all the ports in the device.
The standby CP blade assumes control of the device if the active CP blade fails.
Two slots for core routing (CR) blades:
A CR blade interconnects all port blades.
The blades provide up to 32 Gen 7 QSFP56 (ICL) ports.
ICL ports allow interconnection with neighboring director chassis.
Both CR blades are active and can be hot-swapped.
For a list of supported transceivers for these blades, see Supported Transceivers and Cables.Supported
Transceivers and Cables
Up to four slots for modular, hot-swappable 34-port SX6 extension blades.
Blades provide 16 32Gb/s Fibre Channel (FC) ports supporting 8, 16, and 32Gb/s or 16 32Gb/s FC ports supporting
4, 8, 16, and 32Gb/s FC ports. Extension blades enable long-distance communication over an existing IP
infrastructure. For a list of supported transceivers for these blades, see Supported Transceivers and Cables.
Modular, hot-swappable field-replaceable units (FRUs):
Three fan assemblies, available with NPI or NPE airflow.
Up to four power supplies, available with NPI or NPE airflow.
X7-8-Install-IG100
14
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
See the "Power Supply Specifications (per PSU)" in the Brocade X7 Director Technical Specifications
for maximum output power, input voltage, input line frequency, and other specifications for your power supply
model.
See the "Power Supply Requirements" section in the Brocade X7 Director Technical Specifications for the
minimum number of power supplies required for operation and redundancy when different input voltages are
applied, such as low line and high line AC.
See the "Power Consumption" sections in the Brocade X7 Director Technical Specifications for power output
data and the minimum number of power supplies for supported input voltages.
Redundant primary power connections ensure high availability. Each power supply assembly has its own
connector, so the number of primary power connections is four for optimum efficiency and redundancy.
Two World Wide Name (WWN) cards located on the nonport side of the device behind the WWN card bezel.
Port blades use small form-factor pluggable (SFP+, QSFP+, and QSFP28) optical transceivers. For details on
supported transceivers per blade type, see Supported Transceivers and Cables.
Core routing blades use QSFP28 or QSFP56 optical transceivers. For a list of supported transceivers for these
blades, see Supported Transceivers and Cables.
Chassis door. This door must be installed to meet EMI compliance certification.
A cable management comb. These combs install on the chassis below the blades for cable management.
NOTE
Device control processors and management modules contain batteries for RTC/NVRAM backup. Do not attempt
to replace these batteries. Dispose of hardware components that contain these batteries as required by local
ordinances and regulations.
Port-Side View of the Device
The following figure shows the port-side view of the X7-8 Director with installed blades identified. Note that the SX6
extension blades is not shown in the following figure, but would install in the same slots as the FC32-X7-48 or FC64-64
port blades. A maximum of four SX6 blades are supported.
X7-8-Install-IG100
15
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Figure 1: Port-Side View of X7-8 Director
1. Air Vent
2. Core Routing Blades (CR64-8)
3. Port Blades (FC64-48 or FC32-X7-48)
4. Cable Management Comb
5. Control Processor Blades (CPX7) – Slot 1 (upper), Slot 2 (lower)
NOTE
Depending on the fans and power supplies that are installed, airflow can be from the port side to the nonport
side of the chassis or from the nonport side to the port side of the chassis.
X7-8-Install-IG100
16
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Port-Side Slot Numbering
The X7-8 Director contains 10 full-height slots and two half-height slots, for a total of 12 slots. Facing the port side of the
device, the half-height slots are on the left, numbered 1 (top slot) and 2 (bottom slot). The remaining full-height slots are
numbered 3 through 12, counting from left to right of chassis.
Slots contain guide pins and connectors designed for specific blade types. Only install the control processor (CP), core
routing (CR), port, and extension blades into slot numbers as follows:
Slots 1–2 are restricted to CP blades. Note that the blade installed in slot 1 will be designated as CP0, while the blade
in slot 2 will be designated as CP1 in CLI command and message output.
Slots 3–6 and slots 9–12 are restricted to port and extension blades.
Slots 7–8 are restricted to CR64-8 core blades.
Nonport-Side View of the Device
The following figure shows the nonport-side view of the X7-8 Director with all fan and power supply assemblies installed.
X7-8-Install-IG100
17
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Figure 2: Nonport Side of the X7-8 Director (Example Configuration)
1. WWN Bezel (Logo Plate - WWN Cards Behind)
2. Power Supply Assembly
3. Fan Assembly
4. 2AWG Panduit LCD2-14AF Lug for Building Ground Connection
Depending on fans and power supplies that are installed, airflow can be from the port side to the nonport side of the
chassis or from the nonport side to the port side of chassis.
Although not illustrated, the chassis label that contains the serial number, SKU, and WWN is located on the lower portion
of the chassis, below the fan assemblies.
X7-8-Install-IG100
18
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
Preparing for Installation
Safety Precautions
When using this product, observe all danger, caution, and attention notices in this manual. The safety notices are
accompanied by symbols that represent the severity of the safety condition.
See Cautions and Danger Notices for translations of safety notices for this product.
General Precautions
DANGER
The procedures in this manual are for qualified service personnel.
DANGER
Before beginning the installation, see the precautions in “Power Precautions.”
CAUTION
Changes or modifications made to this device that are not expressly approved by the party responsible for
compliance could void the user's authority to operate the equipment.
CAUTION
Disassembling any part of the power supply and fan assembly voids the warranty and regulatory certifications.
There are no user-serviceable parts inside the power supply and fan assembly.
CAUTION
Make sure the airflow around the front and back of the device is not restricted.
CAUTION
To protect the serial port from damage, keep the cover on the port when not in use.
CAUTION
Never leave tools inside the chassis.
CAUTION
Use the screws specified in the procedure. Using longer screws can damage the device.
ESD Precautions
DANGER
For safety reasons, the ESD wrist strap should contain a series 1 megaohm resistor.
Power Precautions
DANGER
If the installation requires a different power cord than the one supplied with the device, make sure that you use a
power cord displaying the mark of the safety agency that defines the regulations for power cords in your country.
The mark is your assurance that the power cord can be used safely with the device.
X7-8-Install-IG100
19
Broadcom
X7-8-Install-IG100 Installation Guide
Brocade
®
X7-8 Director Hardware Installation Guide
DANGER
Make sure that the power source circuits are properly grounded, and then use the power cord supplied with the
device to connect it to the power source.
CAUTION
Use a separate branch circuit for each power cord, which provides redundancy in case one of the circuits fails.
DANGER
High Touch Current. Earth connection essential before connecting supply.
CAUTION
All devices with AC power sources are intended for installation in restricted access areas only. A restricted
access area is a location where access can be gained only by trained service personnel through the use of a
special tool, lock and key, or other means of security.
CAUTION
The maximum input voltage for connection to the HVAC/HVDC power supply should not exceed 305 VAC and
400 VDC.
CAUTION
The maximum input voltage for connection to the HVAC/HVDC power supply should not exceed 305 VAC and
400 VDC .
CAUTION
For removal of the metal cable restraint cover under the high voltage power supply inlet, remove the 2 Torx
screws.
Lifting Precautions
DANGER
Use safe lifting practices when moving the product.
CAUTION
Do not attempt to lift or support the chassis by the logo bezel attached over the port-side air vents.
Laser Precautions
DANGER
Use only optical transceivers that are qualified by Broadcom and comply with the FDA Class 1 radiation
performance requirements defined in 21 CFR Subchapter I, and with IEC 60825 and EN60825. Optical products
that do not comply with these standards might emit light that is hazardous to the eyes.
X7-8-Install-IG100
20
Broadcom
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172
  • Page 173 173
  • Page 174 174
  • Page 175 175
  • Page 176 176
  • Page 177 177
  • Page 178 178
  • Page 179 179
  • Page 180 180
  • Page 181 181
  • Page 182 182
  • Page 183 183
  • Page 184 184
  • Page 185 185
  • Page 186 186
  • Page 187 187
  • Page 188 188
  • Page 189 189
  • Page 190 190
  • Page 191 191
  • Page 192 192
  • Page 193 193
  • Page 194 194
  • Page 195 195
  • Page 196 196
  • Page 197 197
  • Page 198 198
  • Page 199 199
  • Page 200 200
  • Page 201 201
  • Page 202 202
  • Page 203 203
  • Page 204 204
  • Page 205 205
  • Page 206 206
  • Page 207 207
  • Page 208 208
  • Page 209 209
  • Page 210 210
  • Page 211 211
  • Page 212 212

Broadcom Brocade X7-8 Director Hardware User guide

Type
User guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI