DESCRIPTION
The LPK-LM Insulation Enrty Kit provides a watertight
heater cable entry through an existing thermal insulation and
lagging system. This kit is designed to be mounted directly
on the lagging material and requires a minimum clearance
hole of 40mm (1.5625”). This kit is suitable for use with all
wattages of Nelson Heat Trace LT-J, LT-JT, QLT-J and
HLT-J heater cables. These instructions are to be used
together with the installation and maintenance instructions
for self-regulating heater cable (GA-1765).
KIT CONTENTS
1 Cable Gland, .M25 thread
1 Conduit Locknut
1 Grommet, Heating Cable
1 Mounting Plate, Stainless Steel
1 Tube of Silicone
Gland Fitting Body
Mounting Plate
Retaining Cap
*Metal Screws (4)
Locknut
Sealing Grommet
Heating Cable
*ITEMS NOT INCLUDED IN KIT
Note: This kit is designed to be mounted directly on the lagging material and requires a minimum clearance hole of
40mm (1.5625”)
1. Install gland fitting body on mounting plate and secure with the supplied locknut as shown in the diagram above.
2. Insert the cable through the gland fitting body allowing enough cable to reach desired termination location.
3. Apply silicone sealant to underside of mounting plate and position on lagging material. Secure in place with the
supplied screws.
4. Slide the grommet and retaining cap over the end of cable to be terminated.
5. Tighten retaining cap securely to gland fitting body. To avoid possible leaks, be careful not to over-tighten.
P. O. BOX 726 TULSA, OK 74101 TEL 918-627-5530 FAX 918-641-7336 www.nelsonheaters.com
GA-2307 Rev. 1
Sheet 1 of 1
April 2008
  • Page 1 1

NELSON GA-2307, Heat Trace LPK-LM Insulation Entry Kit Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI