Construction Metals 03036 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Construction Metals 03036 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
5V CRIMPINSTALLATION GUIDELINES
EAVE FLASHING · EF-3
Eave Flashing has very sharp edges. Use gloves to prevent injury.
This product is not recommended for direct contact
with treated lumber.
Working above grade is inherently dangerous, be sure that
proper fall protection measures are in place.
When working with power tools and sheet metal, gloves and
eye protection are absolutely required.
These basic installation guidelines are for use with typical or
standard applications. It is always recommended to seek advice
from a licensed professional, and to check with your local building
inspector or building permit oce for approvals and possible
variations that may apply.
#9 x 1-1/2" Screw
Closure Strip
Corrugated Panel
EF-3
EF-3 Eave Flashing is used with:
Gibraltar 2 1/2" Corrugated Panels
#30 Felt min.
Butyl Sealant Tape
2"
3 ¾"
5⁄8"
½"
1" max. overhang
at eave
/