Enwork Impression™, Disc & Square Bases, Ligouri, Oh Hey!, Tangent, Zori® Installation guide

  • Hello! I've reviewed the Quartz Topper Installation Guide and I'm ready to assist with your questions regarding the installation process. The document provides a step-by-step guide including the caulk application, and topper assembly. Feel free to ask me anything!
  • Where should the caulk be applied on the base?
    How do I attach the topper to the base?
Quartz Topper
Installation Guide
OCCASIONAL TABLES
TI0081
Quartz Topper Installation Guide – Rev 03.23
2TI0081 - Quartz Topper Installation Instructions
2 INCLUDED PARTS AND FASTENERS
Caulk Quartz Topper Base
3TI0081 - Quartz Topper Installation Instructions
Apply caulk to top of base. Caulk should not
be closer than 1 inch from the edge.
Align topper with the top of the base and press
rmly together. Assembly complete.
3.1 3.2
3 AS SEMBLY
1.800.815.7251
enwork.com
12900 Christopher Dr. Lowell, MI 49331
Specications subject to change without notice.
Rev 03.2023
/