- 1 -
Product names listed herein are trademarks of AS America, Inc.
© AS America, Inc. 2018
Thank you for selecting American Standard...
the benchmark of fine quality for over 140 years.
To ensure that your installation proceeds smoothly-please read
these instructions carefully before you begin.
RECOMMENDED TOOLS
ROUGH-IN DIMENSIONS
1
INSTALL VALVE BODY
Town Square
®
S
Wall Mount Faucet
INSTALLATION
INSTRUCTIONS
7455451
Certied to comply with ANSI A112.18.1M
CAUTION
Turn off hot and cold water
supplies before begining.
M965962 (5/18)
• Determine where the nished wall location will be. This measurement
is very important! NOTE: The rough-in measurement from the nished
wall is; 2" minimum and 3" maximum. This is a 1" tolerance.
See rough-in illustration above.
• Secure FAUCET BODY (1) to cross brace of wall structure
at required height using two wood screws.
• Connect HOT water supply to left VALVE inlet and COLD
water supply to right VALVE inlet. Use pipe sealant or
Teon tape forall threaded connections. For sweat connections,
do not makesweat connections directly to valve body.
Damage to seals and and valve cartridge may occur.
• Turn valves to off position. Turn hot and cold supplies on and
check tting connections for leaks .
• Complete wall construction.
Adjustable Wrench
Flat Blade Screwdriver
Channel LocksPipe WrenchTeon Tape
Tubing Cutter
Plumbers' Putty or
Caulking
FINISHED
WALL
2-1/4" D.
(57 mm)
8-7/8"
(225 mm)
1"
(25 mm)
2" MIN.
(51 mm)
3" MAX.
(76 mm) MAX.
1
WOOD SCREWS
HOT
COLD
CROSS BRACE
WALL STUDS
16"
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P
M
A
X
W
A
L
L
M
I
N
1
-
5
/
8
"
D
E
E
P