Pacific Entries P2320-3684-15 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Pacific Entries P2320-3684-15 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
-connued- rev. 4-5-2019
page 1 of 4
READ ALL INSTRUCTIONS PRIOR TO STARTING!
Pencil
Tape Measure
Power Drill
Phillips head
Screwdriver
Crescent Wrench

(4’ min) Level
Step Ladder
HARDWARE INCLUDED IN THIS KIT:
TOOLS REQUIRED
5
1
2
2
2
5
1
1.
2.
3.
4.
5.
6.
7.
Stando
T-Guide
Stainless Steel Hanger
End Stop
An-jump Disc
Hex Head Lag Bolt and
washer
Track - 80”
Item Qty
1
4
6
7
2
3
5
Barn Door With an 80” Track
Stainless Steel Hanging Hardware
Installation Instructions
-connued- rev. 4-5-2019
page 2 of 4
BEFORE GETTING STARTED: PRECAUTIONS












1.

3.
4.
5.
6.
PRIOR TO INSTALLING HARDWARE




of weight. IT IS CRITICAL this piece be secured to the studs and level for proper travel of the doors.

1.

3.
-connued- rev. 4-5-2019
page 3 of 4
TRACK INSTALLATION


3 &4).

MAKE SURE hole marks are level before
drilling.



1.

3.



1.
HANGER INSTALLATION
* NOTE:
To Ensure Proper Alignment And Funcon.
Tighten Bolts On Hanger On Last Track
AFTER Everything Has Been Leveled
Stainless Steel Hanger
(part #3)
Figure 6
-connued- rev. 4-5-2019
page 4 of 4















Note: Based on door
width used, end stop may be required to slide on track
to secure last stand o.

3.
4.
5.
6.

* NOTE:
To Ensure Proper
Alignment And
Funcon. Tighten
Bolts On J-Hook
On Last Track
AFTER Everything
Has Been Leveled
J-HOOK/HANGAR INSTALLATION (continued)
5
Figure 9
/