Attach the
roof trim end
caps with
[P4] screws.
× 24
5
T
o assemble the ROOF
,
you will need these pieces:
PREP: Add the Coop House panels.
Lay the outer-edge roof panels (S1) (S4)
in position first. Add the center panels.
Recheck the roof panel alignment.
Adjust the coop frame as necessary to
get as clean and straight an alignment
as possible.
Once the roof panels look aligned, start
along the center/inside ends and begin
attaching your roof.
Add the roof trim end caps
Start with the two middle [T3]
end caps. Install those first.
[T1] endcaps are the outside right,
and [T2] are on the outside left,
when facing the roof end head-on.
Align the outer end caps off of
the middles for the best result.
PREP:
Lay the roof trim
in place
[Q2] trim slats are positioned
along the peak. [Q1] trim
slats are positioned over the
side seams.
Lay all the trim in position
and adjust for the cleanest
alignment.
★
Your Deluxe Coop is
now fully assembled
and ready for use.
Start in the center
and work to the
outer ends. Attach
with [P5] screws.
× 36
465 SUPPLEMENTAL —10/16—UST For more wonderful cages, toys, and accessories for dogs, cats, birds, chickens, rabbits, ferrets and small animals, visit www.prevuepet.com
S4
S8
S3
S7
S2
S6
S1
S5
coop house
chicken run
PREP: Lay all roof panels face-down
o
n the ground, in the order shown at
the right.
N
OTE the guide hole measurements
.
N
OTE the numbering stamps
.
N
OTE the asphalt coating on the outer-
edge panels extends to the panel sides.
(Panels S1, S4, S5, S8.)
COOP HOUSE INSIDE ENDS
1" space
ALL OUTSIDE ENDS
1¼" space
CHICKEN RUN INSIDE ENDS
⅛" space
C
HICKEN
R
UN
COOP
H
OUSE
NEST BOX
G
OOD ALIGNMENT IS EVERYTHING
To assure a clean
finish to your coop,
pay special attention
t
o the coop frame
alignment.
Squaring up your
frame will result in
the correct alignment
for the roof panels,
r
oof seams, and all
roof trim.
• A diagram of the coop framework as viewed from above, showing
square 90° corners and perfect, flush alignment of all coop frame panels.
An off-kilter frame alignment will make it difficult to place the roof panels
correctly, will create poor roof seams, will make it difficult to finish the
e
nd trim neatly or align the top trim correctly, and will result in a jagged
and sloppy coop roof.
ROOF PANELS WITH
C
ORRECT ALIGNMENT
×
56 × 36
P
AY SPECIAL
ATTENTION
Attach the
roof panels
with [P4]
screws.
× 32
Check coop and panel alignment.
If you are getting a jagged, uneven,
stair-stepped alignment along the roof
panels, shift the chicken run frame
e
nd right or left to get a satisfactory,
clean, even alignment edge.
ROOF PANELS WITH
I
NCORRECT ALIGNMENT
PREP: B
egin with the Chicken Run end
.
Lay the two outer-edge roof panels (S8) (S5)
in position first by aligning the predrilled
guide holes in the panels with the wood
p
egs along the roof lines.
I
f dowels and guide holes don’t properly
align at first, gently contort the front panel
until alignment is achieved.
Add the center panels. Center panels
should fall into place.
DO NOT ATTACH ANY PANELS
AT THIS TIME.
asphalt-coated
outer edges
numbering
stamps