Hanover HANGHGBMN-1WHT Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Hanover HANGHGBMN-1WHT Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
You must read these instructions carefully before you start to assembly.
Overall Size/inch: L47"x W24.4"x H66.5"
Balcony Mini-Greenhouse
Overall Size/cm: L120 x W62 x H169
9820510
Assembly Instruction
the assembly of the whole product.
quantity as mentioned in the list.
Do not tighten the steps until completing on
IMPORTANT
Please ensure that you find all parts in the correct type and
Please carry out the steps according to the instructions.
Keep the instruction manuals in a safe place for future reference.
IMPORTANT
Ifyouhaveanyproblemswiththisproduct,
please
DONOTRETURNTHIS
ITEM

TotheRetailer/Storefromwhereyoupurchasedtheproduct.
Pleaseemailusanytimewiththenature
oftheproblem
at:
ContactUs@Hanover
Products.com
Pleaseinclude:
Picturesoftheissue(s)andreceipt(ifavailable)
NameandaddressofthePurchaser
Nameofretailer
OrcallourCustomer
Serviceteambetween9:00AMand5:00PMEasternTime,
MondaythroughFridayat:
1877
397
5144
orvisitourwebsiteat:
www.HanoverProducts.com
Toexpediteanyfuture
warrantyclaims,pleaseretainyourreceiptforfuture
use.
Foradditionalonlinesupportonassembly,troubleshooting
andcare&maintenanceofyouroutdoor
product,pleasevisitourwebsiteat:
www.HanoverProducts.com
.
8/1/2019
Work gloves, Spirit level, Lubricant, rubber mallet,0.08" metal drill bit.
Silicone sealant, bradawl, crosshead screwdriver, step ladder,Tape.
risen with cool clean water.
Hot items such as recently used grills, blowtorches etc. can not be stored
Do not attempt to assemble this greenhouse when you feel tired , or have taken
Dispose of all plastic bags safely-keep them out of reach of little children.
PRODUCT SIZE
SAFETY ADVICE
We strongly recommend the use of work gloves during assembly.
Do not attempt to assemble the greenhouse in windy or wet conditions,
Do not touch overhead power cables with the aluminum profiles.
Always wear shoes and safety goggles when working with extruded
aluminum.
The greenhouse must be positioned and fixed on a flat level surface.
Do not lean against or push the greenhouse during construction.
Keep children away from the assemble area.
Do not position your greenhouse in an area exposed to excessive wind.
drugs or alcohol or if you are prone to dizzy spells.
If using a step ladder or power tools ensure that you follow the
manufactures safety advice.
in the greenhouse.
Ensure there are no hidden pipes or cables in the ground before inserting
the pegs.
GENERAL ADVICE
This is a multi-part assembly, Allow at least 60 minutes for assembly.
Selecting a site-choose a sunny level position away from overhanging trees.
If you are fixing your greenhouse directly to a solid concrete foundation use
the pre drilled holes in the metal base supplied.
The component parts should be checked and laid out close at hand.
Keep all small parts(screws etc)in a bowl so they do not get lost.
Note that the door is hinged on the right hand side and therefore opens to
the right. Keep roof clear of snow and leaves.
CARE & MAINTENANCE
When your greenhouse needs a clean, use a mild detergent solution and
Do NOT use acetone, abrasive cleaners or other special detergents to clean
the clear panels.
TOOLS & EQUIPMENT REQUIRED
.
120cm
62cm
122cm
88cm
166cm
47"
24.4"
34.6"
48"
66.5"
-3-
22.2"x17.4"
45"x17.4"
20.5"
PARTS LIST
NO.
Qty.
1 2
1102mm
350mm
3 2
12 2
615mm
W5 2
W4 2
293mm
271mm
NO.
Qty.
B1 2
B5 4
B3 2
NO.
Qty.
F1 8
F2 2
F3 26
F4 40
F5 24
F6 13
F7 16
ST5x30
ST5x20
ST5x10
M4x9
ST4x8
M6x12
M6x10
NO.
Qty.
S1 2
S1L 1
S1R 1
S2L 1
S2R 1
M6x9
F8 4
S3 2
S5 2
NO.
Qty.
S6 2
S7L 1
S7R 1
S8L 1
S8R 1
S9L 1
S9R 1
GB 1
G3 1
SUMMARY STATEMENT FOR POLYCARBONATE PANEL
Towards the white film side to the sun as it is UV-protected.
P1
P4
P3
P6L
P6R
P3
P5
522mm
2 2
TOP
726mm
13 2
1102mm
522mm
5 1
14 2
TOP
6 1
726mm
22mm
7 2
1102mm
8 1
154mm
9 2
1062mm
10 1
11 2
1042mm
W1 3
1042mm
W3 1
1042mm
845mm
D1 2
866mm
D2 4
B6 2
1161mm
B7 2
581mm
B12 2
1158mm
B10 2
578mm
B11 2
4 1
1102mm
1112mm
B13 1
1156x575mm
P6 1
P7 2
1110x443mm
P8 2
1145x443mm
565x443mm
P9 4
S10 1
43.3"
13.8"
24.2"
28.6"
43.3"
20.5"
28.6"
0.86"
43.3"
6"
41.8"
41"
41"
11.5"
10.7"
41"
33.2"
34"
43.3"
45.7"
22.8"
45.7"
22.7"
43.8"
45.5"x22.6"
43.7"x17.4"
D2 x4
B5 x4
B10 x2
F3x8
D2
D2
D2
D2
B11
B10
B10
B11
B5
B5
B5
B5
x4
x4
x4
x4
B11
B10
B5
B10
B11
D2
B5
F3
F3
B11 x2
Base and Frame Assembly
Anchor Installation
Attach the anchor B5 to the corner of base B10.
fix B5 anchors onto B10 and D2 by F3 screws.
Make sure all holes are all in alignment and then
Repeat the step to complete anchor installation for other 3 corners.
-5-
Bottom of workbench P6 Installation
Attach P6 onto B7&B12 with 8 pieces F5 screws.
Attach D2 & B12 with 12 pieces F7 screws.
Workbench Assembly
Align holes for D2 and B12.
Panels of platform B12 Installation
B7 x1
P6
F7 x12
F5 x8
x6
F7
F7
B12
D2
x8
F5
F5
F5
F5
F5
P6
P6
P6
B7
B7
B12
B12
F7
F7
B7
B12 x2
B12
B12
D2
D2
D2
D2
B7
P6
F7
F7
F7
F7
B12
B12
D2
Step I:
Step II:
-6-
Step 2:
Step 1:
Workbench Assembly
F5 x4
F7 x4
D2
F7
F7
B7
x2
D2
B7
F7
B7
B7
D2
D2
F7
F7
P6
F5
F5
F5
F5
P6
P6
B7
B12
B7
F7
F7
-7-
Install the last piece
4 pcs F7 screws.
the two frames D2 with
of wall panel B7 and
Fix the bottom panel P6 to
the last piece B7 wall panel
with 4 pieces F5 screws.
Rotate and tighten the water pipe G3.
head and pipe.
G3 water pipe kit is composed by 2 parts,including connecting
Water Pipe G3 Installation
Back wall panels Installation
G3
P8 x2
P8
P8
P8
D2
D2
G3
P6
P8
P8
P8
D2
B10
D2
P8
Step 1:
Step 2:
Insert wall panels P8 into parts D2,
2 pcs P8 panels for each wall.
Step 3:
Ensure the bottom edge of
base B10.
the first P8 panel inserted into
Step 4:
two walls.
Repeat the step 2 for other
Step 5:
Ensure the bottom edge of
the top edge of the first P8 panel.
the second P8 panel is against
-8-
P6
How to install the water pipe kit?
Step I: Insert the connecting head into the holes in the
middle of P6;
Step II:Attach the water pipe onto connecting head, then
rotate and tighten it via the screw thread on connecting
head.
Insert the second piece
Step 4:
Step 3:
Step 2:
the top edge of the first P9 panel.
-9-
the second P9 panel is against
the first P9 panel inserted into
Side wall panels Installation
P9
P9
P9
D2
B10
D2
P9
P9 x4
P9
P9
P9
P9
D2
D2
D2
D2
Ensure the bottom edge of
base B10.
Ensure the bottom edge of
Insert the first piece
side wall panel P9.
Insert the second piece
wall panel P9 of same
wall.
Step 1:
side wall panel P9.
fix them with 2pieces F6 screws.
F6 x10
S2R
S2L
P7 x2
D1 x2
DOOR
back
S2L
S2R
D1
D1
P7
P7
P7
P7
D1
P7
back
back
D1
D1
P7
P7
D1
S2L
S2R
F6
F6
P7
D1
F6
3.Assemble them together in the middle with 2 pieces F6 screws.
1.Put the 2 pieces panels P7 together;
Step 1:
2.Make sure the two panels are against each other;
Edge frame D1 installation.
F6x6
Step 2:
Fix D1 & P7 with 6 pieces F6 screws,
but don't drive the 2 pieces on the
top where should be left for S2R and
S2L.
corner caps S2R,S2L and
Installation for plastic door
Step 3:
-10-
Door Assembly
the door with 1 piece F5 screw. There are 2 pre-drilled
1 hole at each side.
Door Stopper B3 Installation
pieces front D2 according to figure I.
Stick the 4 pieces on the inside surfaces of the 2
Door sealer S10 Installation
B3 x2
DOOR
B3
B7
B3
B7
F5
DOOR
DOOR
S10
S10
S10
B3
B7
B3
F5 x2
Cut the S10 adhesive stripe in
4 pieces,33" long.
Install B3 beneath the part B7 close to
There are 2 holes on parts B3.
holes on the bottom of part B7,
-11-
D2
D2
Planform of D2
surfaces of B7 and B12, then mount the nuts but
Installation for base frame of greenhouse.
1 x2
F5 x10
!
F5
F5
F5
F5
F5
B7
B12
B7
B12
B7
F5 x10
x2
2
1
B12
B7
B12
B7
F5
F5
F5
B7
1
F5
B7
1
2 x2
2
2
1
1
Don't fully lock F5 screws
Step I:
Place10 pieces F5 screws
into the pre-drilled holes on the upper
not fully locked.
Step II:
and ensure the tail of F5 screws inserting into
Install the 1# profile by pushing it above B7
the groove of 1# profile.
Amplifying detailed figure.
-12-
Silicon
Silicon
Seal the gaps between
every two panels.
Silicon
B7
B12
Place 9 pieces F4 screws into the pre-drilled holtes on
-13-
3 x2
F4 x9
F4 x9
F4
F4
F4
F4
!
1
2
2
1
1
F4
Locked
x4
x2
6
6
3
3
Locked
2
1
1
13 x2
3
3
13
13
6
6
1
2
2
F4
F4
F4
F4
F4
!
!
Installation for the frame of greenhouse
Don't lock F4 screws
Step I:
but don't fully tighten them.
1# profiles
Step II:
into the frame profiles 3#
Inserting the tail of F4 screws
of mini greenhouse.
into the long frame profiles 6#
Step III:
Inserting the tail of F4 screws
of mini greenhouse.
and part 14# must be 30cm/11.8".
The distance between part 2#
and part 5# must be 40cm/15.7".
F8 screw. 2 pieces F8 screws needed totally.
Step V
Step I,II,III,IV
-14-
Pre-place 13 pieces F4 screws
Installation for the beam of greenhouse
5 x1
9 x2
F8 x2
F4 x13
7 x2
x2
9
F4
F4
F4
F4
5
x2
F4
F4
7
9
3
x2
3
9
F8
1
2
x2
14 x2
14
F4
F4
14
5
3
3
13
13
6
14
9
9
into 7#,9# and 5# parts.
Fix the other end of part 9# on to part 1# with
Reinforcing rib 9# installation
5
6
1
13
13
40cm
40cm
F4
F4
F4
14
2
3
13
30cm
The distance between part 1#
Part 5# must be installed inside
of part 6#.
7
3
3
7
F4
F4
5
F4
x4
Step VI
Install part 7#
and part 3# together.
1
2
2
1
-15-
Fix the part 4# with pre-planced
Step III:
Assemble roof profiles 12# to connectors 7#.
groove of profile 12#.
Step V:
Step IV:
Step II
PC Panels for back wall
Pre-place 1 piece F4 screw into each 13# and 6# part.
Step I
比例 25.400
比例
25.400
12 x2
B1 x2
F4 x7
1
13
P3
P6L
P6R
P3 x2
4
P6R
P6L
12
12
4
P3
P3
3
3
13
13
6
13
13
6
P3 P3
13
13
1
4
P3
P3
6
13
13
F4
F4
F4
F4
F4
F4
x2
B1
F4
F4
12
P6L
B1
F4
7
12
F4
P6L
7
5
12
x2
B1
B1
Roof frames installation
Amplifying detailed figure.
Ensure the panels P3 inserted
into the groove of part 13.
Pre-place part B1 into the
F4 screws at the first step.
3
Step I,II:
Moving the pre-placed F4 screws
-16-
Step VI:
at each end.
to part B13 with 1 piece F4 screw
Fix the other side edge of part 8#
Step V:
pre-placed in profile 12#.
fix both with 2 pieces F4 screws
into frame profiles 12 and
Step IV:
in each of profile 13.
in each of profile 12.
Step III:
8
B6 x2
F4 x9
x2
F4 x2
8
B13
F6 x3
8
B13
B6
B6
12
13
6
13
F4 x1
12
x2
13
F4 x1
8
F4
F4
12
12
F4
F4
F4
B13
F6
F6
F6
13
13
6
12
8
8
B13
8
B6
F4
F4
12
13
Pre-embedding 2 pieces
F4 screws in the holes
at each end of roof beam 8#.
Pre-pance 1 pieces F4 screws
Pre-place 2 pieces F4 screws
Inserting the roof beam 8#
into the pre-punched holes of
end cover B6 and lock the screws.
profiles 12 and cover the end edge with
Inserting P5 PC panel into frame
Step II:
10
P5
F4 x2
F4 x2
10
F3x2
S8L
S8R
10
P5
8
12
12
B1
B1
S8L
S8R
P5
10
B1
F4
x2
x2
S8L
S8R
F3
F3
B1
10
P5
P5
12
Roof Panel Installation
Pre-place 2xF4 screws
into the profile 10#.
connecting profile 10.
Step I:
Install corner caps S8L & S8R.
Assemble profile 10 on
Part B1 and lock them.
-17-
10
-18-
2 pieces F8 screws for one handle.
Step IV:
of W4.
1.Note the direction of W4;
Step III:
Step II:
Window
W1 x3
W5 x2
W4 x2
W3
F3x8
F8 x2
GB
W1
W1
W1
W3
GB
W5
W5
W4
W4
P4
P1
F3
F3
F3
F3
F3
F3
F3
F3
F8
F8
W5
W1
W1
P4
W5
F3
F3
!
Direction
!
Direction
W1
W4
F3
P1
W3
GB
P1
F8
F8
S6 x2
S6
S6
S6
S6
F3
F3
W4
W4
W3
W3
P1
!
Direction
Middle Window
Bottom Window
Handle Installation
1.Note the direction of W5;
2.Note the parts P4 & W1
are involved in the groove
of W5.
2.Note the parts P4 & W1
are involved in the groove
F3x2
S3 x2
S3
11 x2
11
12
10
W5
11
W4
W5
W1
W1
11
10
W1
W5
W5
W1
W1
W4
11
S8L
x2
S3
8
F3
S3
P1
P4
12
3
12
13
11
11
Installation for rail 11#
Insert rail profile 11# into the
grooves of profile 10#.
Roof corner plastic caps
S3 installation.
-19-
Install S5 onto S9 with 1 piece F2 screws.
F1 x8
S7L S7R S9L
S9R
S5 x2
F2 x2
x2
S7L
S5
S9L
F2
F1
F1
W5
x4
11
11
W5
W4
S9L
S7L
S7R
S9R
S5
S5
Installation for plastic end caps.
Install S7R in same way.
Install S7L with 2 pieces F1 screws.
Install S9R in same way.
Install S9L with 2 pieces F1 screws.
-20-
/