Danfoss BasicClip Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Danfoss BasicClip Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1 2
3
4
5 6
7 8
9
10
Instruction
BasicClip
Installation Guidelines
1
Attach the perimeter insu-
lation with tape on wall.
Note!
If additional insulation is 5 cm
thick or more attach the
perimeter insulation on the
additional insulation.
2
Begin laying insulation
panels with the overlay flap
upright against the wall.
3
Observe the overlap
throughout installation.
4
Install insulation panels
throughout all rooms.
5
Attach perimeter insulation,
tension free, by using the self
adhesive strips.
6
Joints without any overlap
should be taped up. When
using liquid screed tape over-
lapping joints.
7
Tack down Danfoss com-
posite pipe with 2 BasicClip
clips per metre.
8
Position tacker vertically
over the required spot and
fasten pipe by pushing down
the tacker handle.
9
Lay pipes in snail form
throughout the room.
10
Install expansion joint
profile e.g. for door thresh-
olds, as shown, using the
Basic movement gap strip.
Danfoss HES VI.CT.E1.02 © Danfoss 11/2008 1
/