Prcparation
& Installation
Step 1
Decd6rFpo,ono
h6ooo
ro/
h
6lol
_ob
litted
(m
d-heiqht recomme.dedl, ho
d
ock
aga
nst the
door and mark lhe 1op
and botlonr of the ock case and
the top
and bottom ol the lorend.
Contnle the lines
o.
10 the fiont
edge of the d@r and the
Step 2
rvd
o
bndt bdor.
t-f.on
Fdg-ofLedoor
oa!.
Temp ate A on lhe cenae .e
a.d
in .e wilh the
top
.c
marked on the
door n step I above
Using a bradaw mark the centre of the
s
x hole
pos
I
o.s
lor
dnlling the ho es thal
are
to make the
pocket
for
the
ock case wlh n the
dool llsng a drillol l6mm
d ameter
dr
ll
the si\ lro s shown on Temp are A to a
depth
ot85mm. Wiren tlre six hols have ben dr ed,
make
a c ean
pockel
ior the l@k case us ng a
sha.p
Step 3
nsert the
ock case nio the I n shed
pocket
keeping it n
.e wilh
tire lines akeady drawn on the door the.
draw
compelelyarclnd the
ock
fore.d
Femove ihe
ock and using a sharp chise
prepae
the
edge
of
the
door lo.eceive the ock ioend
(abolt
4mm
deep) so that I is tush with the fro.t
edge ol
the
door
Us nq a bradawl mak ihe four holes lor lasten
ng the
loend lo lhe door
and d
iip
ot hoes.
Sbp 4
Agn Tempaie B on the oltside face
oi
the
door and
w1h
a bradaw mark!p and dr ixingsc€who€s A
though tire door
(for
the escutcheon)usng
a
14mm
Us ng thm
and
12mm
d ameter dril bts rogerher wrh
a
chlse
prepare
tlre apenure for the cy nder
(hole
B')
,ous'
"
door
Dd6r.oLc.sein.o redoo.jrd
thouqh the iorend
us
ng the lour
screre
prov
ded
Sle! 1
step 2
Slep3
Step 4
?
!,uur-r-rocr.