Spectrum Industries 55266B Assembly Instructions

Type
Assembly Instructions
Assembly Instructions:
(4) 026064
1/4
20 x 5/8
"
PHMS
(4) 054781
10-24 x 1/2" PHMS
Rack Rail Kit-Media Director V2
#55266
Tools Required:
Phillips screwdriver
(2) 056947
5-1/4" Rack Rail
(3RU)
(2) 0103319
Rack Rail Mount
1/4
-
20
x
5/8
PHMS
(2) 026547
1/4-20 x 1-1/2" PHMS
Before you begin, please make sure all parts and proper quantities are included. Any parts damaged during shipment must be reported within 15
days of receipt. To report information regarding damages or if you have any questions, please call 1-800-235-1262.
A. Determine the preferred side of the lectern the rack rail will be mounted (left or right.)
(Figure 1 shows a left-sided installation.)
B. Remove any worksurface hole plugs at the Rack Rail location.
Attach Rack Rail Mounts
1.
C. Attach the Rack Rail Mounts with the fasteners shown.
RkRil
#10-24 X 1/2" PHMS
(2) per Mount Worksurface
R
ac
k
R
a
il
Mount
1/4-20 x 1-1/2" PHMS
(1) per Bracket
1/4-20 x 5/8" PHMS
(2) per Rail
Rack Rail
Rack Rail Mount
Figure 1
Figure 2
Rack Rail
Rack Rail Mount
A. Attach each Rack Rail to the Rack Rail Mounts with (2) 1/4-20 x 5/8" PHMS. Figure 2.
Attach Rack Rails
2.
Figure
2
0103299X Page 1 of 1
  • Page 1 1

Spectrum Industries 55266B Assembly Instructions

Type
Assembly Instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI