New England Arbors VA68166 Operating instructions

Type
Operating instructions
Check Box for These Contents
In the event of missing or defective parts please call our customer service dept. at
1 800 282 9346, ext #20
(Mon. to Fri. 8:00 AM to 4:00 PM EST).
1. Arch System & Spokes (1)
2. Post Caps (2)
3.
Pre-Assembled Lattice Screen
(1)
4. Ground Anchoring Stakes (2)
5. Hardware (in plastic bag)
a) 5/8” Self-Auguring Stainless Steel Screws (8)
b) #2 Robertson Drill Bit (1)
Tools You Will Need
• Cordless Drill
• Hammer
Tape Measure
• Level
• Shovel
General Information
Read Instructions through carefully before beginning assembly.
When assembling components, place on a non-abrasive surface
(i.e. shipping box) to avoid scratching.
We recommend an area approx 5’x 8’ for unobstructed assembling.
You should not need to use excessive force when assembling components.
The Madrid Trellis
Please read through before starting assembly.
ASSEMBLY INSTRUCTIONS
1
www.edenarbors.com
1
(Pre-Assembled)
5 a b
Not to Scale
4
57.85
4
41.65
21.27
24.27
2
3
7
3
2
STEP TWO
5 -
Insert the ground anchoring stakes into the bottom of the trellis
posts. Secure with screws into the four pre-drilled holes.
Mounting Into the Ground
Install the Ground Anchor Stakes
EDEN ARBORS, 1915 Dove St., Port Huron MI USA 48060
Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286
www.edenarbors.com
2
Trellises must be well secured in the event of heavy vine growth, etc. We
have provided two ground anchoring stakes for securing the trellis
either into the ground or into a concrete footing. If you are installing
your trellis directly to the wall of your home, or on a wood deck or concrete
surface, please see your hardware store for the appropriate galvanized
bracket hardware.
STEP THREE
6 - Move the trellis to its final location. When you are satisfied with
the location, mark the positions of the posts, then move the trellis
aside and lay it carefully on it’s side. Excavate the 2 post holes
approximately 18" deep x 6" diameter. Carefully move the trellis
back into position.
7 - Level it both vertically and horizontally into the excavated holes.
8 - Backfill the holes with the excavated soil.
Install Trellis into Ground
6
18”
Level
6“
STEP ONE
1 - Install post caps. Push down firmly to lock into place.
2 -
Take arch system and guide the three spokes into the pre-routed
holes on the top rail of the trellis while guiding the arch system into the
post caps.
3 - Push down firmly on arch system to lock into the post caps.
Assemble Trellis
1
5
1
23
  • Page 1 1
  • Page 2 2

New England Arbors VA68166 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI