Broan Replacement HSI Control for CMF PG Furnace Installation guide

Type
Installation guide
Replacement HSI Control for CMF-PG Furnaces
P/N 902922
INSTALLATION SEQUENCE
1. Disconnect electrical power.
2. Remove the Honeywell Hot Surface Ignition Control
from the top of the control box located on the burner
assembly (See Figure 1).
3. Remove the Time Delay Relay and the Motor Relay
inside control box located on burner assembly (See
Figure 1).
4. Install the new control onto the control box cover and
wire (See Figure 2).
MODEL PGB-D1 GAS BURNER
“DIRECT IGNITION”
Figure 1. Old Assembly
MODEL PGB-D1 GAS BURNER
“DIRECT IGNITION”
Figure 2. New Assembly
INSTALLATION INSTRUCTIONS
7074800 (NEW)
Specifications & illustrations subject to change without notice or incurring obligations (06/15).
O’Fallon, MO, © Nortek Global HVAC LLC 2015. All Rights Reserved.
  • Page 1 1

Broan Replacement HSI Control for CMF PG Furnace Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI