Hoshizaki American, Inc. C-100BAF-AD User manual

Category
Ice cube makers
Type
User manual

This manual is also suitable for

Hoshizaki
“A Superior Degree
of Reliability”
www.hoshizaki.com
Models
C-100BAF-AD
C-100BAF-ADDS
Self-Contained Cubelet
Hoshizaki America, Inc.
Number: 73180
Issued: 10-6-2010
SERVICE MANUAL
2
IMPORTANT
Only qualied service technicians should install, service, and maintain the
icemaker. No service or maintenance should be undertaken until the technician
has thoroughly read this Service Manual. Failure to service and maintain
the equipment in accordance with this manual may adversely affect safety,
performance, component life, and warranty coverage.
Hoshizaki provides this manual primarily to assist qualied service technicians in the
service and maintenance of the icemaker.
Should the reader have any questions or concerns which have not been satisfactorily
addressed, please call, write, or send an e-mail message to the Hoshizaki Technical
Support Department for assistance.
HOSHIZAKI AMERICA, INC.
618 Highway 74 South
Peachtree City, GA 30269
Attn: Hoshizaki Technical Support Department
Phone: 1-800-233-1940 Technical Support
(770) 487-2331
Fax: 1-800-843-1056
(770) 487-3360
E-mail: techsuppor[email protected]
Web Site: www.hoshizaki.com
NOTE: To expedite assistance, all correspondence/communication MUST include the
following information:
• Model Number ________________________
• Serial Number ________________________
• Complete and detailed explanation of the problem.
3
Important Safety Information
Throughout this manual, notices appear to bring your attention to situations which could
result in death, serious injury, or damage to the unit.
WARNING Indicates a hazardous situation which could result in death or
serious injury.
CAUTION Indicates a situation which could result in damage to the unit.
IMPORTANT Indicates important information about the use and care of the
unit.
WARNING
This icemaker should be destined only to the use for which it has been
expressly conceived. Any other use should be considered improper and
therefore dangerous. The manufacturer cannot be held responsible for injury or
damage resulting from improper, incorrect, and unreasonable use.
To reduce the risk of death, electric shock, serious injury, or re, follow
basic precautions including the following:
This unit requires an independent power supply. See the nameplate for proper
voltage and breaker/fuse size. Failure to use a proper breaker or fuse can
result in a tripped breaker, blown fuse, or damage to existing wiring. This
could lead to heat generation or re.
THIS APPLIANCE MUST BE GROUNDED: This unit is equipped with a
3-prong grounding plug to reduce the risk of potential shock hazards. It must
be plugged into a properly grounded, independent wall outlet. If the outlet is a
2-prong outlet, it is your personal responsibility to have a qualied electrician
replace it with a properly grounded, independent 3-prong wall outlet. Do not
remove the ground prong from the power cord and do not use an adapter
plug.
• Do not use an extension cord.
• Make sure the power switch is in the "OFF" position before plugging in or
unplugging the unit to reduce the risk of electric shock.
• Do not use a unit with a damaged power cord. The power cord should not be
altered, jerked, bundled, weighed down, pinched, or tangled. Such actions
could result in electric shock or re. To unplug the unit, be sure to pull the
plug, not the cord, and do not jerk the cord.
To reduce the risk of electric shock, do not touch the plug or power switch with
damp hands.
• Do not place ngers or any other objects into the ice discharge opening.
This unit should be disassembled or repaired only by qualied service
personnel to reduce the risk of electric shock, injury, or re.
• Do not make any alterations to the unit. Alterations could result in electric
shock, injury, re, or damage to the unit.
4
CONTENTS
Important Safety Information ................................................................................................. 3
I. Specications ...................................................................................................................... 6
II. General Information ........................................................................................................... 7
A. Construction .................................................................................................................. 7
1. Icemaker .................................................................................................................. 7
2. Ice Making Unit ........................................................................................................ 8
B. Sequence of Operation ................................................................................................. 9
1. Freeze Cycle ............................................................................................................ 9
2. Bin Control Thermostat Shutdown ........................................................................... 9
III. Technical Information ...................................................................................................... 10
A. Water Circuit and Refrigeration Circuit ........................................................................ 10
B. Wiring Diagram .............................................................................................................11
1. C-100BAF Series ....................................................................................................11
2. C-100BAF Series with Optional Drain Pump HS-0248 ...........................................11
3. Sequence Wiring Diagram ..................................................................................... 12
a) Freeze Cycle ....................................................................................................... 12
b) Bin Control Thermostat Shutdown ...................................................................... 13
c) Low Water/Freeze-Up Safety Shutdown ............................................................. 14
d) Gear Motor Protector (external overload) Shutdown .......................................... 15
e) Optional Drain Pump HS-0248 Safety Shutdown ............................................... 16
C. Performance Data ....................................................................................................... 17
IV. Service Diagnosis ........................................................................................................... 18
A. Ice Production Check .................................................................................................. 18
B. Diagnostic Procedure .................................................................................................. 18
C. Diagnostic Charts ....................................................................................................... 20
1. No Ice Production ................................................................................................... 20
2. Low Ice Production ................................................................................................ 22
3. Other ...................................................................................................................... 23
D. Optional Drain Pump HS-0248 .................................................................................... 24
1. Overview ................................................................................................................ 24
2. Float Switch Cleaning ............................................................................................ 24
V. Removal and Replacement of Components .................................................................... 26
A. Service for Refrigerant Lines ....................................................................................... 26
1. Refrigerant Recovery ............................................................................................. 26
2. Brazing .................................................................................................................. 27
3. Evacuation and Recharge (R-134a) ...................................................................... 27
B. Removal and Replacement of Compressor ................................................................. 28
IMPORTANT
This manual should be read carefully before the icemaker is serviced or
maintenance operations are performed. Only qualied service technicians
should install, service, and maintain the icemaker. Read the warnings contained
in this booklet carefully as they give important information regarding safety.
Please retain this booklet for any further reference that may be necessary.
5
C. Removal and Replacement of Evaporator Assembly Components ............................. 30
1. Upper Bearing Wear Check .................................................................................. 31
2. Removal and Replacement of Extruding Head ...................................................... 32
3. Removal and Replacement of Auger ..................................................................... 32
4. Removal and Replacement of Evaporator ............................................................. 33
5. Removal and Replacement of Mechanical Seal and Lower Housing ................... 35
6. Removal and Replacement of Gear Motor ............................................................ 36
D. Removal and Replacement of Fan Motor .................................................................... 36
E. Removal and Replacement of Water Reservoir .......................................................... 37
F. Removal and Replacement of Bin Control Thermostat Assembly ................................ 37
VI. Cleaning and Maintenance ............................................................................................. 38
A. Cleaning and Sanitizing Instructions ........................................................................... 38
1. Cleaning Solution ................................................................................................... 38
2. Cleaning Procedure ............................................................................................... 38
3. Sanitizing Solution ................................................................................................. 40
4. Sanitizing Procedure - Initial .................................................................................. 40
5. Sanitizing Procedure - Final ................................................................................... 41
B. Maintenance ................................................................................................................ 42
C. Preparing the Icemaker for Long Storage ................................................................... 44
6
I. Specications
A. C-100BAF-AD, C-100BAF-ADDS
Note: We reserve the right to make changes in specications and design without prior
notice.
AC SUPPLY VOLTAGE 115/60/1
AMPERAGE 4.0 A
MINIMUM CIRCUIT AMPACITY 15 A
MAXIMUM FUSE SIZE 15 A
A
PPROXIMATE ICE PRODUCTION
A
mbient WATER TEMP. (°F)
PER 24 HR. Temp.(°F) 50 70 90
lbs./day ( kg/day
)
70 *92 (42) 89 (40) 84 (38)
Reference without *marks 80 81 (37) 71 (32) 66 (30)
90 66 (30) *62 (28) 57 (26)
100 55 (25) 54 (24) *49 (22)
SHAPE OF ICE Cubelet
ICE QUALITY Approx. 90%
A
PPROXIMATE STORAGE CAPACITY 29 lbs. (13 kg) [Bin Control Setting 22 lbs. (10.0 kg)]
ELECTRIC & WATER CONSUMPTION 90/70°F 70/50°F
ELECTRIC W (kWH/100 lbs.) 310 (12.1) 297 (7.7)
WATER gal./24HR (gal./100 lbs.) 7.7 (12) 11.1 (12)
EXTERIOR DIMENSIONS (WxDxH) 14.9" x 22.6" x 31.5" (378 x 575 x 800mm)
EXTERIOR FINISH Stainless steel, Galvanized Steel (Rear)
WEIGHT Net 104 lbs. ( 47 kg ), Shipping 115 lbs. (52 kg) without pallet
CONNECTIONS - ELECTRIC Cord Connection
- WATER SUPPLY Inlet 1/2" FPT
- DRAIN Outlet 1/2" FPT
ICE MAKING SYSTEM Auger type
HARVESTING SYSTEM Direct Drive Auger (80W Gear Motor)
ICE MAKING WATER CONTROL Mechanical float valve
COOLING WATER CONTROL N/A
BIN CONTROL SYSTEM Thermostat
COMPRESSOR Hermetic, Model QA51K13GAU6
CONDENSER
EVAPORATOR Copper Tube on Cylinder
REFRIGERANT CONTROL Capillary Tube
REFRIGERANT CHARGE R134a 3.17 oz. (90 g)
DESIGN PRESSURE High 240 PSIG, Low 120 PSIG
P.C. BOARD CIRCUIT PROTECTION N/A
COMPRESSOR PROTECTION Auto-reset Overload Protector
GEAR MOTOR PROTECTION Manual reset Circuit Breaker
LOW WATER PROTECTION Suction Temperature Safety
ACCESSORIES - SUPPLIED Ice Scoop; pump adapter hose
- REQUIRED N/A
OPERATING CONDITIONS VOLTAGE RANGE 104 - 127 V
AMBIENT TEMP. 45 - 100° F
WATER SUPPLY TEMP. 45 - 90° F
WATER SUPPLY PRESSURE 7 - 113 PSIG
AGENCY UL OUTDOOR APPROVED, cUL
ETL
Air-cooled, Fin and tube type
7
II. General Information
A. Construction
1. Icemaker
Compressor
Rear
Float-Operated Water Valve
Air-Cooled Condenser and
Condenser Fan Motor
Front
Control Box
Water Reservoir
Evaporator Assembly
Gear Motor
Upper Rear Panel
Suction Temperature Safety
Drier
Bin Control Thermostat
Fig. 1
Front Panel
Louver
Top Panel
Power Switch
Gear Motor Protector (External Overload) Reset Switch
Ice Discharge Opening
Bin Control
Thermostat Bulb
Slope
C-100BAF-AD Shown
Lower Rear Panel
C-100BAF-AD Shown
8
2. Ice Making Unit
Allen Head Cap Screw
Gear Motor
Spline Coupling
Housing and
Lower Bearing
O-Ring
Mechanical Seal
Cylinder
Auger
Extruding Head
and Upper
Bearing
Cutter (motionless)
Insulation
Allen Head
Cap Screw
with Washer
Hex Head
Bolt with
Washer
Fig. 2
Evaporator Flange
9
B. Sequence of Operation
This icemaker utilizes a thermostatic bin control to switch the gear motor, fan motor, and
compressor on and off as needed. This icemaker utilizes a oat-operated water valve in
the water reservoir to allow water into the icemaker as needed. After the power switch is
placed in the "ON" position, the sequence is as follows:
1. Freeze Cycle
GM, FM, CR, and Comp energize. As the water in the evaporator cools, ice starts
forming within 4 to 6 minutes. This time frame depends on the inlet water and ambient
temperature conditions.
The oat-operated water valve allows water into the reservoir as needed to continue the
ice making process. This continues until BC shuts down the icemaker or power is turned
off to the icemaker.
2. Bin Control Thermostat Shutdown
Ice lls storage bin to level of BC. When BC opens, GM, FM, CR, and Comp de-energize.
When ice level lowers and BC closes, the icemaker starts operating again.
C-100BAF Series Sequence Flow Chart and Component Operation
2. Shutdown
1. Freeze Cycle
The oat-operated water valve allows
water into the reservoir as needed to
continue the ice making process.
When BC opens, the icemaker shuts
down. When BC closes, the icemaker
starts operating again.
Full Bin
BC closed
GM energized
FM energized
CR energized
Comp energized
Power Switch
"ON"
BC closed
GM continues
FM continues
CR continues
Comp continues
BC open
GM de-energized
FM de-energized
CR de-energized
Comp de-energized
BC open
BC closed
Legend: BC–bin control thermostat; Comp–compressor; CR–compressor relay;
FM–fan motor; GM–gear motor
10
III. Technical Information
A. Water Circuit and Refrigeration Circuit
1. C-100BAF Series
Drier
Condenser
Fan Motor
Condenser
Compressor
Float-Operated
Water Valve
Water
Reservoir
Water Level
Suction
Temperature
Safety
Gear
Motor
Evaporator
Assembly
Water Inlet
Water Supply
Fig. 3
Capillary Tube
Overow Hose
Suction
Discharge
11
B. Wiring Diagram
1. C-100BAF Series
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
2. C-100BAF Series with Optional Drain Pump HS-0248
12
3. Sequence Wiring Diagram
a) Freeze Cycle
Power supplied. Gear motor, fan motor, compressor relay, and compressor energize. The
oat-operated water valve allows water into the reservoir as needed to continue the ice
making process.
C-100BAF Series
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
13
b) Bin Control Thermostat Shutdown
Ice lls storage bin to level of bin control thermostat. Bin control thermostat opens. Gear
motor, fan motor, compressor relay, and compressor de-energize.
C-100BAF Series
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
14
c) Low Water/Freeze-Up Safety Shutdown
If the water supply is interrupted or a freeze-up condition occurs, the decrease in suction
line temperature causes the suction temperature safety to open and shut down the
icemaker. See the table below for suction temperature safety cut-out/cut-in temperatures.
Suction Temperature Safety
Cut-out 23.9°F±2.7°F (-4.5°C±1.5°C)
Cut-in 29.0°F±2.7°F (-1.5°C±1.5°C)
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
C-100BAF Series
15
d) Gear Motor Protector (external overload) Shutdown
If gear motor amperage exceeds 2.4~3.0 amps, the gear motor protector (external
overload) operates independently to turn off the gear motor. The gear motor external
overload can be manually reset by pressing the switch on the control box.
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
C-100BAF Series
16
e) Optional Drain Pump HS-0248 Safety Shutdown
If the water level in the drain pump reservoir rises high enough to close the drain pump
upper oat switch, the drain pump safety interrupts power to the icemaker. When the
water level lowers enough to open the drain pump upper oat switch, power is restored to
the icemaker.
The pump motor remains energized as long as the drain pump lower oat switch is
closed.
C-100BAF Series
(3W)
(external
overload
2.4~3.0A)
(internal)
(external)
17
70/21
92
42
89 40 84 38
80/27
81 37 71 32 66 30
90/32
66 30
62
28
57 26
lbs./day kg./day
100/38
55 25 54 24
49
22
70/21
80/27
90/32
watts
100/38
70/21
11
0.04
11 0.04 10 0.04
80/27
10 0.04 9 0.03 8 0.03
90/32
8 0.03
8
0.03
7 0.08
gal./day m
3
/day
100/38
7 0.03 6 0.02
6
0.02
70/21
80/27
90/32
100/38
70/21
115
8.1
130 9.1 141 9.9
80/27
126 8.9 149 10.5 156 11.0
90/32
130 9.1
165
11.6
174 12.2
PSIG kg/cm
2
G
100/38
129 9.1 167 11.7
183
12.9
70/21
12
0.8
13 0.9 15 1.1
80/27
13 0.9 15 1.1 16 1.1
90/32
13 0.9
17
1.2
18 1.3
PSIG kg/cm
2
G
100/38
13 0.9 17 1.2
19
1.3
-2
310
310
309
312
316
316
316
-2
-5 -5
308
WATER TEMP. (ºF/ºC)
AMBIENT TEMP.
(ºF/ºC) 50/10 70/21 90/32
297
310
313
316
-5
-5
APPROXIMATE ICE
PRODUCTION PER 24 HR.
APPROXIMATE ELECTRIC
CONSUMPTION
APPROXIMATE WATER
CONSUMPTION PER 24 HR.
Evaporator Outlet
1
1
SUCTION PRESSURE
TOTAL HEAT OF REJECTION FROM CONDENSER
1
-2
1
-2
HEAD PRESSURE
1850 BTU/h [AT 90ºF (32ºC) / WT 70ºF (21ºC)]
C. Performance Data
1. C-100BAF-AD, C-100BAF-ADDS
Note:
1. The data not in bold should be used for reference only.
2. We reserve the right to make changes in specications and design without prior
notice.
18
IV. Service Diagnosis
WARNING
1. This unit should be diagnosed and repaired only by qualied service
personnel to reduce the risk of death, electric shock, serious injury, or re.
2. Risk of electric shock. Use extreme caution and exercise safe electrical
practices.
3. Moving parts (e.g., fan blade) can crush and cut. Keep hands clear.
4. CHOKING HAZARD: Ensure all components, fasteners, and thumbscrews
are securely in place after the unit is serviced. Make sure that none have
fallen into the storage bin.
5. Make sure all food zones in the icemaker and storage bin are clean after
the unit is serviced. For cleaning procedures, see "VI. Cleaning and
Maintenance."
A. Ice Production Check
To check production, prepare a bucket or pan to catch the ice and a set of scales
to weigh the ice. After the icemaker has operated for 10 to 20 minutes, catch the ice
production for 10 minutes. Weigh the ice to establish the batch weight. Multiply the
batch weight by 144 for the total production in 24 hours. When conrming production
or diagnosing low production, see "III. C. Performance Data" for typical production
information.
B. Diagnostic Procedure
This diagnostic procedure is a sequence check that allows you to diagnose the electrical
system and components. Before proceeding, check for correct installation, adequate
water supply (minimum of 7 PSIG, maximum of 113PSIG), and proper voltage per unit
nameplate. When checking voltage (115VAC), always choose a white (W) neutral wire to
establish a good neutral connection.
1) Move the power switch to the "OFF" position, then unplug the unit from the electrical
outlet.
2) Remove the front panel and louver. Remove the screws securing the control box, then
gently pull the box out. Remove the control box cover.
3) Plug the unit back in. Place the power switch in the "ON" position.
4) Freeze Cycle – GM, FM, CR, and Comp energize. Ice production begins 4 to 6 minutes
after Comp starts depending on ambient and water conditions.
Diagnosis:Check that GM, FM, and Comp start. If not, check the power switch, STS
(see"III.B.3.c)Low Water/Freeze-Up Safety Shutdown"), BC assembly (including
heater), GM protector (external overload) (see "III.B.3.d) Gear Motor Protector (external
overload) Shutdown"), GM thermal protector (internal overload), GM windings, GM
capacitor, voltage to FM, voltage on CR, PTC relay, voltage on Comp terminals, Comp
windings, and Comp thermal protector (external overload). If optional drain pump
HS-0248 is installed, see "IV.D. Optional Drain Pump HS-0248." If GM starts, but the
auger does not turn, check the spline coupling between the auger and GM.
19
5) Shutdown (bin full) – Ice lls storage bin to level of BC. BC opens. GM, FM, CR, and
Comp de-energize. Diagnosis: When the icemaker is running, hold ice in contact with
BC bulb. If the components fail to de-energize, check BC.
6) Move the power switch to the "OFF" position and unplug the unit from the electrical
outlet.
7) Make any repairs necessary, then replace the removed parts in the reverse order of
which they were removed.
8) Plug the unit back in. Move the power switch to the "ON" position to start the automatic
icemaking process.
Legend: BC–bin control thermostat; Comp–compressor; CR–compressor relay;
FM–fan motor; GM–gear motor; STS–suction temperature safety
20
C. Diagnostic Charts
1. No Ice Production
Problem Possible Cause Remedy
[1] The icemaker will not
start.
a) Power Supply 1. Off, blown fuse, or
tripped breaker.
1. Turn on, replace, or reset.
2. Power cord
unplugged.
2. Plug into outlet.
3. Loose connection. 3. Tighten.
4. Bad contacts. 4. Check for continuity and
replace.
5. Not within
specications.
5. Refer to nameplate and
correct.
b) Power Switch
(Control Box)
1. "OFF" position. 1. Move to "ON" position.
2. Bad contacts. 2. Check for continuity and
replace.
c) Suction Temperature
Safety
(Low Water/Freeze-Up
Safety)
1. Open due to water
supply cut-off.
1. Check water supply,
water lters, water inlet
strainer-washer, oat, and
water valve.
2. Open due to
evaporator freeze-up
(gear motor not
operating).
2. Check gear motor
operation.
3. Bad contacts. 3. Check for continuity and
replace.
d) Bin Control Thermostat
Assembly (with
integrated heater)
1. Open with bin lled
with ice.
1. Remove ice.
2. Ambient temperature
too cool.
2. Increase ambient
temperature.
3. Bulb out of position. 3. Place in position.
4. Bad contacts. 4. Check for continuity
and replace. See
"V.F. Removal and
Replacement of Bin
Control Thermostat
Assembly."
5. Bad thermostat
heater.
5. Check and replace.
See "V.F. Removal
and Replacement of
Bin Control Thermostat
Assembly."
e) Gear Motor Protector
(External Overload)
(2.4~3.0A)
1. Tripped. 1. Press switch on control
box to reset. Check
supply voltage, gear
motor amperage, gear
motor bearings, and
auger bearings (see
"V.C.1. Upper Bearing
Wear Check"). Check for
evaporator freeze-up.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44

Hoshizaki American, Inc. C-100BAF-AD User manual

Category
Ice cube makers
Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI