lehman Trikes Crossfire Installation guide

Category
Motorcycle Accessories
Type
Installation guide
2010+ Victory Cross Country / Cross Roads
Installation Guide
Nov 2014
125 Industrial Drive | Spearfish, SD 57783 | Toll Free 888.3WHEELS
w w w . l e h m a n t r i k e s . c o m
2
UNDERSTANDING SAFETY LABELS & INSTRUCTIONS
READ AND BECOME FAMILIAR WITH ALL WARNING, CAUTION SYMBOLS AND STATEMENTS
LISTED BELOW AND IN THE TEXT OF THIS MANUAL BEFORE YOU BEGIN WORK.
DANGER, WARNINGS & CAUTION SYMBOLS
This is the safety alert symbol. When you see this
symbol on your machine or in this manual, be alert
to the potential for personal injury. Your safety is
involved!
SAFETY ALERT WARNING indicates a potential hazard
that may result in severe injury or death to the operator, by-
stander or person (s) inspecting or servicing the vehicle.
WARNING
Indicates a potential hazard that may result in minor per-
sonal injury or damage to the vehicle.
CAUTION
CAUTION indicates special precautions that must be taken
to avoid vehicle damage or property damage.
CAUTION
NOTE provides key information by clarifying instructions.
NOTE:
IMPORTANT provides key reminders during disassembly,
assembly and inspection of components.
IMPORTANT:
3
General Information
This kit is designed to be installed by a competent technician. Improper installation can affect
the safe operation of your trike, which could also result in serious injury or death. Make sure you
have a complete understanding of the work to be preformed. Unqualified installers are urged to
have the unit installed by a trained technician.
Always protect yourself when the vehicle is in the air. Make sure the vehicle is properly supported
anytime you use a hoist or jack.
Always use the proper tools.
Protect your eyes by using proper safety glasses or goggles.
Read through the installation instructions before you begin. Make sure you have all the proper tools,
parts and skill set to perform the installation safely and completely.
Verify that you have all components before assembly.
Before installing your new Lehman kit, we recommend that your motorcycle be inspected and ser-
viced by a qualified technician. Replace any worn or damaged parts before installing the trike kit.
If the motorcycle has more than 12,000 miles, Lehman Trikes recommends installing a new drive
belt during the trike conversion.
CAUTION: This kit is not designed for use on lowered motorcycles. Interference between the
tires and body may occur.
OverallWidth 57.75"
OverallLength(w/EZSteer)106"
WheelBase(w/EZSteer)67"
CurbWeight1170lb
RearTireSize 205/7015
RearTirePressure26PSI
RearSuspensionDoubleAArmIndependent
Storage5Cubicfeet
RearWheelSize15x7,4x4.5,+35mmOffset
4
Disassembly
NOTE: Refer to the Victory service manual for detailed instructions on removal of OEM parts.
1. Load motorcycle on lift and secure front wheel.
2. Place motorcycle on center stand or scissor style jack.
3. Disconnect negative battery cable.
4. Remove seat, save mounting hardware.
5. Remove side covers.
NOTE: Save tour box mounting hardware
6. Disconnect wiring and Remove tour box. (if
equipped)
7. Remove saddlebags (if equipped).
8. Remove saddlebag frames (if equipped).
9. Remove antenna and wiring. Plug is located
behind front fairing (Can be removed during
EZ Steer installation if applicable)
10. Remove mufflers and rear heat shields.
11. Remove rear wheel.
12. Disconnect rear brake line at caliper and
remove caliper.
13. Remove rear fender.
14. Remove passenger floorboard assemblies,
save hardware.
NOTE: See Fig. 1. for steps 15-17.
15. Remove shock linkage from swingarm.
16. Remove swingarm pivot shaft and remove
swingarm. Save pivot shaft and hardware.
17. Remove shock from motorcycle frame.
NOTE: See Fig. 2. The Lehman differential is
preassembled for shipping purposes. Swin-
garm, rear frame and top frame must be re-
moved for belt installation. RH park brake
cable must also be disconnected from the
balance bar.
Swingarm
Rear Frame
Top Frame
Fig. 1
Fig. 2
5
ABS Pump Relocation– ABS Models Only
1. Remove ABS Pump mounting hardware from frame. Do not remove front brake lines from
pump.
2. Remove mounting bracket from pump. Remove grommets and spacers from bracket.
3. See Fig. 1. Remove entire rear brake line assembly from motorcycle. Disconnect line at master
cylinder and ABS pump.
4. See Fig. 2. Install original grommets and spacers to new ABS pump bracket as shown.
Fig. 1
Front brake line assembly ABS Pump
Install grommets and
spacers to Lehman
ABS pump bracket
Fig. 2
6
5. See Fig. 3. Install new bracket to ABS pump
using original hardware.
(1) ABS Bracket– S002350
6. See Fig. 4. Install banjo bolts, spacers and
washers to block off rear brake line ports on
pump. Torque banjo bolts to 16 ft-lbs.
(2) Banjo Bolts– CB6001
(4) Banjo Washers- CGC6002
(2) Spacer– S001067
7. Set pump assembly above frame until differ-
ential assembly is installed.
8. Apply “ABS Disabled” sticker over ABS light
on instrument cluster.
Block off ports for rear lines
Fig. 3
Fig. 4
7
Swingarm Installation
1. See Fig. 1. Apply grease to plastic bushings and press into swingarm. Insert steel sleeves in
bushings.
2. See Fig. 2. Install swingarm to motorcycle and slide the pivot bolt though. Place two OEM wash-
ers on the RH side as shown below.
3. See Fig. 2. Reattach both floorboards supports with OEM hardware in lower holes. For the LH
side, Torque the lower 8mm screw to 19 ft-lbs. For the RH side, attach the floor board and torque
the lower 10MM screw to 35 ft-lbs. Place the OEM washers and nuts onto the pivot bolt. Hand
tighten pivot hardware.
1
2
2
3
4
3
1
2
Item # Description Part # QTY
1 OEM Nut OEM 2
2 OEM Washer OEM 4
3 Sleeve S002349 2
4 Bushing S002348 2
5 Swingarm S002347 1
6 OEM Pivot Shaft OEM 1
5
6
Fig. 1
Fig. 2
8
Top Frame Installation
1. See Fig. 1. Mount Top Frame to the motorcycle sub-frame using the hardware indicated below.
Torque hardware to 19 ft-lbs evenly across all screws.
(2) M8x35 Hex Bolt– CB1622
(2) M8x40 Socket Head Bolt– CB1975
(4) M8x45– CB1986
(8) M8 Lock Washers– CW2168
(8) M8 Flat Washers– CW2167
M8x35 Hex Bolt
w/ Flat and Lock Washer
M8x45 SHCS
w/ Flat and Lock Washer
M8x40 SHCS
w/ Flat and Lock Washer
Fig. 1
9
Differential Installation
1. See Fig. 1. Remove 3 of the 4 cross tubes as shown below.
2. Pass drive belt over differential assembly and position onto rear pulley.
3. Reinstall the cross tubes and spacers. Apply anti seize to all bolts and torque the 3/4” x 2-1/2”
hex head screws to 150 ft-lbs. Torque the 1/2” x 2-1/4” hex head cap screw to 50 ft-lbs.
4. Guide differential under rear motorcycle frame while reinstalling belt past swingarm and onto front
drive pulley.
5. See Fig. 2. Attach body mounts to top frame using the 3/8” x 1-1/4” hex head cap screws. Torque
to 45 ft-lbs.
Front
Body mount
3/8” x 1-1/4” Hex Bolts
w/ Flat Washers and Lock Nuts
Leave front lower
tube installed
Fig. 1
Fig. 2
Top frame
10
Rear Frame and Swingarm
1. See Fig. 1. Position lower rear body frame inside of swing arm and install the 1/2” bolts through
the mounting holes.
(4) 1/2” x 3-1/2” Hex Head Bolts– CB2178
(8) 1/2” Washers– CN3060
2. See Fig. 2. Attach the adjuster plate to swingarm as
shown with adjuster bolt in place. Torque adjuster
plate mounting hardware to 45 ft-lbs.
(2) 3/8” x 1-1/4” Hex Head Bolts– CB2018
(2) 3/8” Flat Washers– CW2180
(2) 3/8” Lock Nuts– CN3051
3. See Fig. 3. Leave approximately a 1/16” gap be-
tween the top of the stud and the face of the nut for
both sides on swingarm pivot shaft. It is critical to
have correct spacing. Torque pivot shaft nuts to 85
ft-lbs.
4. The floorboards need to be swapped with the op-
posite side such that the LH floorboard will be in
the reversed position on the RH. Torque the re-
place RHS to 18 ft-lbs. Do not attach the floorboard
onto the LHS. The park brake will need to be in-
stalled which is later in the instructions.
Fig. 1
Fig. 2
Fig. 3
Swingarm
Rear Frame
1/16” Gap
Attach plate
to Swingarm
Aduster bolt
11
Align and Tension Drive Belt
1. Set the belt tension and alignment by moving the independent drive train unit forward or rearward as
necessary using the adjuster bolts. Belt tension can be measured by total vertical movement and
should be approximately ¾”-1” with a new belt.
Tip: Measure from the bracket to the face of the drive train on each side to get the alignment
close. Then perform the next step.
2. To check the alignment, turn the sprocket by hand in the forward direction, noting whether the belt
runs in the center of the pulley. If the pulley runs on the right side plate of the pulley, use the right
hand adjuster bolts to move the right wheel rearward until the belt runs in the center. If the belt runs
on the left side plate of the pulley, use the left adjuster bolts to move the left wheel rearward. Make
small adjustments and recheck the alignment.
3. Once the belt is aligned, torque the four front 1/2" fasteners to 70 ft-lbs and double check belt align-
ment. If alignment is off, please repeat alignment process.
Tighten all fasteners left loose for belt adjustment.
Torque the four rear ½” fasteners to 70 ft-lbs.
4. Recheck belt tension and alignment after tightening the fasteners.
5. If belt is off to right or left go back to step 2.
Belt Centered
12
Longer Side on RHS
(10.80 Approximately) Shorter Side on LHS
(10.42 Approximately)
Install Anti-Roll Bar
1. See Fig. 1. Install Anti-Roll Bar with the short side on the LH side of trike as shown below.
2. See Fig. 2. Install hardware through anti-roll bar housing onto swingarm. Position the anti-roll bar
on the frame so that the rod ends will be close to vertical when attached to the control arms.
Torque hardware to 45 ft-lbs.
(4) 3/8” x 1-1/4” Hex Head Bolts– CB2018
(8) 3/8” Flat Washers– CW2180
(4) 3/8” Lock Nuts– CN3051
Fig. 1
13
3. See Fig. 1. Attach rod-end to right control arm
with the included hardware in the following
order: 3/8” x2-1/4” bolt, washer, rod-end,
washer, control arm, washer, and then nut.
Torque to 45 ft-lbs.
(2) 3/8” x 2-1/4” Hex Head Bolts– CB2001
(6) 3/8” Thin Flat Washers– CW2182
(2) 3/8” Lock Nuts– CN3051
4. Adjust left side rod-end until it aligns with the
left control arm mounting hole.
5. Tighten jam nut on the left side rod end as-
sembly.
6. Attach rod end to left control arm just as was done to right control arm. Torque to 45 ft-lbs.
Brakes
1. See Fig. 1. Assemble the new brake lines and residual valve and install as shown using the fol-
lowing hardware. Route front of new brake line to master cylinder in original location.
(1) Rear Brake Line, 29”- S002367
(1) Front Brake Line, 23.5”- S002368
(1) Residual Valve- GB1146
(2) Clamps– S001654
2. See Fig. 2. Attach front brake line to master
cylinder with brake light switch.
(1) Brake Light Switch– S002369
(2) Banjo Washers– GC6002
Front line/clamp
Front line/clamp
Residual Valve
Fig. 1
Fig. 1
Fig. 2
OEM Master Cylinder Switch
Line
14
3. Route new brake light switch wiring to original
brake light switch connector on LH side of mo-
torcycle and connect.
4.
4. See Fig. 3. Attach brake block to bolt on
swing arm using 1/4” locknut and washer.
Torque to 11 ft-lbs. Connect both rear brake
lines to t-block.
(1) Brake Block– S002163
(1) 1/4” Flat Washer– CW2005
(1) 1/4” Lock Nut– CN3040
5. See Fig. 4. Route the rear brake line around
the LHS passenger floorboard as shown be-
low. Attach the rear line to the brass block on
swingarm. Torque banjo bolt to 16 ft-lbs.
(1) Banjo Bolt– CB6001
(2) Banjo Washers– GC6002
6. See Fig. 5. Verify new brake reservoir hous-
ing is assembled as shown.
(1) Reservoir Bracket– S002356
(1) Reservoir Tank– S002357
(1) Cap– S002358
(1) Tank Mount– S002359
(2) M6 x 1 Flange Head Screws– CB1905
(2) M6 Flange Lock Nut– CN1902
Rear brake line
Fig. 3
Fig. 4
Fig. 5
Tank
Bracket
Tank Mount
15
5. See Fig. 6. Install new reservoir assembly to
original bracket on motorcycle. New bracket
will mount to the inside of the existing bracket
with star washer between the two brackets.
(1) M6 x 1 Flange Head Screws– CB1905
(1) M6 Flange Lock Nut– CN1902
(1) Star Washer– CW2067
5. See Fig. 6. Install new rubber hose between
reservoir and master cylinder. Secure with
clamps on each end.
(5”) 5/16” Brake Hose– CH2016
(2) Clamps- CC2016
5. See Fig. 7. ABS Models Only- Finish mount-
ing ABS pump to the top frame using the origi-
nal hardware. Secure lines and wiring to
frame.
7. Use the specified brake fluid in the owner’s
manual and bleed the rear brake system.
Thoroughly bleed the system of any air using
the upper bleeders and lower bleeders on rear
brake caliper.
Fig. 6
Secure wiring to
upper frame
Fig. 7
OEM bracket
16
Park Brake
1. See Fig. 1. Verify park brake cables are
routed in front of rubber body mounts and se-
cured to upper A-arms on both sides.
2. See Fig. 2. Verify cables are secured to bal-
ance bar as shown.
Fig. 1
Fig. 2
17
Exhaust Installation
1. See Fig’s. 1 & 2. Install exhaust extensions onto OEM header pipes (longer extension is used on
the LHS). Reuse the factory clamps plus additional clamp provide for RH side. Keep all the clamps
slightly loose until the mufflers are installed.
(1) Exhaust Clamp– S001412
(1) RH Exhaust Extension– S002351
(1) LH Exhaust Extension– S002352
2. See Fig. 3. Install muffler brackets to body mount frame with rubber isolators as shown. Tighten
the nuts until a few threads of the bolts are visible.
(1) RH Muffler Bracket– S002353
(1) RH Muffler Bracket– S002354
(6) Muffler Isolators– S002225
NOTE: See Fig. 3. Verify rear body mounts are installed before mounting mufflers.
Make sure rubber body mounts are
installed before mounting mufflers.
Fig. 2 Fig. 1
RH Side
LH Side
Fig. 3
18
3. See Fig. 4. Place mufflers over exhaust extensions with clamps in place. Attach mufflers to brack-
ets using the original flange head bolts. Torque hardware to 20 ft-lbs.
4. Adjust the extensions and mufflers until the best fit is achieved. Make sure the mufflers are at the
same angle relative to the body frame otherwise the gap around the muffler to the body may differ.
Torque the OEM exhaust clamps to 35 ft-lbs.
5. See Fig. 5. Trim both heat shields. Cut
shields behind rear clamp as shown.
6. See Fig. 6. Bend front tab on LH heat shield
as shown.
7. Reinstall heat shields in original locations.
Fig. 4
Remove rear
section from shield
RH heat shield shown
Before After
Fig. 5
Fig. 6
19
Side Panel Modification
1. See Fig’s 1 & 2. Trim both LH and RH side panels to fit around sway bar. Keep both panels loose
on the Trike after cutting.
Fig. 1 Fig. 2
RH panel shown RH panel shown
Grab Handle Installation
1. See Fig. 3. Mount grab handles to body using
the following hardware. Install spacers between
handles and body.
(2) Grab Handle– S001035
(4) Grab Handle Spacer– S001701
(4) 5/16” x 1-1/4” Button Head Bolt– CB1163
(4) 5/16” Fender Washer– CW2109
(4) 5/16” Lock Washer– CW2046
(4) Rubber Washer– FG1002
20
Body Installation
NOTE: The installation /alignment of the body
is an important process to find the correct po-
sition of the body in relation to the wheels.
The pre-drilled holes in the body are for ship-
ping purposes. Re-drill the holes if necessary
once the body is properly aligned.
NOTE: Verify steps 1-4 are complete before
installing body to trike.
1. See Fig. 1. Verify park brake cables are
routed in front of rubber body mounts and se-
cured to upper A-arms on both sides.
2. See Fig. 2. Verify cables are secured to bal-
ance as shown.
3. See Fig. 3. Verify all the rubber body mounts
are in place before installing body. The three
rear mounts should be loose.
(7) Body Mounts– S002156
4. Verify wire harness and taillights are installed
and secure. Taillights are mounted with the
following hardware.
(8) M4 x 8 Socket Head Screws– CB1704
(8) #6 Stainless Flat Washers– CW2086
(2) Taillights– S002335
(2) Taillight Grommets- GG0011
(1) Crossfire Wire Harness– S002305
5. Carefully position the body to the trike frame.
Secure the body with the following hardware
(original shipping hardware). Tighten hard-
ware evenly to 20 ft-lbs.
(7) 3/8” Fender Washers– CW2180
(7) 3/8” “Thin” Locknuts– CN3055
Fig. 1
Fig. 3
Fig. 2
Cables installed
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24

lehman Trikes Crossfire Installation guide

Category
Motorcycle Accessories
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI