20
Body Installation
NOTE: The installation /alignment of the body
is an important process to find the correct po-
sition of the body in relation to the wheels.
The pre-drilled holes in the body are for ship-
ping purposes. Re-drill the holes if necessary
once the body is properly aligned.
NOTE: Verify steps 1-4 are complete before
installing body to trike.
1. See Fig. 1. Verify park brake cables are
routed in front of rubber body mounts and se-
cured to upper A-arms on both sides.
2. See Fig. 2. Verify cables are secured to bal-
ance as shown.
3. See Fig. 3. Verify all the rubber body mounts
are in place before installing body. The three
rear mounts should be loose.
• (7) Body Mounts– S002156
4. Verify wire harness and taillights are installed
and secure. Taillights are mounted with the
following hardware.
• (8) M4 x 8 Socket Head Screws– CB1704
• (8) #6 Stainless Flat Washers– CW2086
• (2) Taillights– S002335
• (2) Taillight Grommets- GG0011
• (1) Crossfire Wire Harness– S002305
5. Carefully position the body to the trike frame.
Secure the body with the following hardware
(original shipping hardware). Tighten hard-
ware evenly to 20 ft-lbs.
• (7) 3/8” Fender Washers– CW2180
• (7) 3/8” “Thin” Locknuts– CN3055
Fig. 1
Fig. 3
Fig. 2
Cables installed