GE ReadyToProcess WAVE 25 Operating Instructions Manual

Type
Operating Instructions Manual
ReadyToProcess WAVE
â„¢
25
Operating Instructions
Original instructions
Page intentionally left blank
Table of Contents
51 Introduction ..........................................................................................................
61.1 About this manual ................................................................................................................................
71.2 Important user information .............................................................................................................
91.3 Regulatory information ......................................................................................................................
101.3.1 EU Directives ....................................................................................................................................
111.3.2 Eurasian Customs Union ............................................................................................................
121.3.3 Regulations for USA and Canada ...........................................................................................
131.3.4 Other regulations and standards ............................................................................................
151.4 Important concepts .............................................................................................................................
161.5 User documentation ...........................................................................................................................
172 Safety instructions ...............................................................................................
182.1 Safety precautions ...............................................................................................................................
262.2 Labels .........................................................................................................................................................
272.2.1 Instrument labels ...........................................................................................................................
312.2.2 Safety labels .....................................................................................................................................
332.2.3 Additional labels .............................................................................................................................
352.3 Emergency procedures ......................................................................................................................
382.4 Recycling information .........................................................................................................................
392.5 Declaration of Hazardous Substances (DoHS) ........................................................................
413 System description ..............................................................................................
423.1 System overview ...................................................................................................................................
443.2 ReadyToProcess WAVE 25 rocker .................................................................................................
523.3 ReadyToProcess CBCU .......................................................................................................................
553.4 ReadyToProcess Pump 25 ................................................................................................................
583.5 Cellbag bioreactor ................................................................................................................................
613.6 UNICORN software overview ..........................................................................................................
623.6.1 General UNICORN operation .....................................................................................................
653.6.2 Administration .................................................................................................................................
663.6.3 System control ................................................................................................................................
723.6.4 Evaluation .........................................................................................................................................
734 Installation ............................................................................................................
744.1 Site preparation .....................................................................................................................................
754.1.1 Delivery and storage ....................................................................................................................
764.1.2 Site requirements ...........................................................................................................................
814.1.3 Client computer specifications .................................................................................................
834.2 Hardware installation .........................................................................................................................
844.2.1 Unpack the system units ............................................................................................................
864.2.2 Connect the system components ...........................................................................................
904.3 Software installation ...........................................................................................................................
914.3.1 Install UNICORN software ..........................................................................................................
944.3.2 Configure an e-license .................................................................................................................
1014.3.3 Define the system ..........................................................................................................................
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 3
Table of Contents
1035 Operation ..............................................................................................................
1045.1 Set up the system .................................................................................................................................
1055.1.1 Select the tray and Cellbag bioreactor .................................................................................
1065.1.2 Attach and detach tray ................................................................................................................
1095.1.3 Prepare pH and DO sensors ......................................................................................................
1125.1.4 Attach the Cellbag bioreactor ...................................................................................................
1145.1.5 Prepare the pump ..........................................................................................................................
1195.1.6 Connect gas to the system ........................................................................................................
1235.2 Start and configure the system .....................................................................................................
1245.2.1 Start the system and log on to UNICORN ...........................................................................
1255.2.2 Connect to the system .................................................................................................................
1275.2.3 Configure system properties .....................................................................................................
1295.2.4 Configure system settings ..........................................................................................................
1315.2.5 Start a run .........................................................................................................................................
1355.3 Prepare for cultivation ........................................................................................................................
1365.3.1 Inflate the Cellbag bioreactor ...................................................................................................
1375.3.2 Adjust pump parameters ...........................................................................................................
1385.3.3 Add and equilibrate culture medium .....................................................................................
1415.3.4 Prepare the sensors ......................................................................................................................
1445.4 Perform cultivation ..............................................................................................................................
1455.4.1 Inoculate the culture .....................................................................................................................
1465.4.2 Monitor the run ...............................................................................................................................
1485.4.3 End a run ...........................................................................................................................................
1506 Maintenance .........................................................................................................
1516.1 Calibration ................................................................................................................................................
1536.2 Cleaning ....................................................................................................................................................
1546.3 Cleaning before planned service ...................................................................................................
1557 Troubleshooting ...................................................................................................
1567.1 ReadyToProcess WAVE 25 system ................................................................................................
1577.2 ReadyToProcess WAVE 25 rocker .................................................................................................
1617.3 ReadyToProcess CBCU .......................................................................................................................
1627.4 ReadyToProcess Pump 25 ................................................................................................................
1637.5 UNICORN System Control .................................................................................................................
1658 Reference information ........................................................................................
1668.1 Chemical resistance ............................................................................................................................
1678.2 Health and Safety Declaration Form ...........................................................................................
169Index .......................................................................................................................
4 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
Table of Contents
1 Introduction
About this chapter
This chapter contains important user information, the intended use of ReadyToProcess
WAVE 25, description of safety notices, and regulatory information.
In this chapter
This chapter contains the following sections:
See pageSection
61.1 About this manual
71.2 Important user information
91.3 Regulatory information
151.4 Important concepts
161.5 User documentation
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 5
1 Introduction
1.1 About this manual
Purpose of this manual
The Operating Instructions provide you with the information needed to install, operate
and maintain the product in a safe way.
Scope of this document
This manual covers the entire ReadyToProcess WAVE 25 system, including the main unit
(rocker), CBCU and pump, as well as accessories.
Typographical conventions
Software items are identified in the text by bold italic text. A colon separates menu levels,
thus File:Open refers to the Open command in the File menu.
Hardware controls, indicators and connections are identified in the text by bold text (for
example, Power switch).
Text entries that UNICORNâ„¢ generates or that the user must type are represented by a
monospaced typeface (forexample, \Program Files\GE Healthcare\UNICORN\).
6 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.1 About this manual
1.2 Important user information
Read the Operating Instructions
before operating the product
All users must read the entire separate Operating Instructions before installing, op-
erating, or maintaining the product.
Always keep the Operating Instructions at hand when operating the product.
Do not operate the product in any other way than described in the user documentation.
If you do, you may be exposed to hazards that can lead to personal injury and you may
cause damage to the equipment.
Intended use
The ReadyToProcess WAVE 25 system is intended to be used as laboratory and manu-
facturing equipment for cell cultivation. The system may not be used for clinical or diag-
nostic purposes.
Prerequisites
In order to follow this manual and use the system in the intended manner, it is important
that:
•
you have a general understanding of how the client computer and Microsoft
®
Win-
dows
®
operating systems work.
•
you are acquainted with the use of general laboratory equipment and with handling
of biological materials.
•
you have read and understood the Safety instructions chapter in these Operating
Instructions.
•
the system is installed according to the instructions in these Operating Instructions.
•
a user account has been created according to UNICORN Administration and Technical
manual.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 7
1 Introduction
1.2 Important user information
Safety notices
This user documentation contains safety notices (WARNING, CAUTION, and NOTICE)
concerning the safe use of the product. See definitions below.
WARNING
WARNING indicates a hazardous situation which, if not avoided,
could result in death or serious injury. It is important not to proceed
until all stated conditions are met and clearly understood.
CAUTION
CAUTION indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury. It is important not to pro-
ceed until all stated conditions are met and clearly understood.
NOTICE
NOTICE indicates instructions that must be followed to avoid
damage to the product or other equipment.
Notes and tips
A note is used to indicate information that is important for trouble-free and
optimal use of the product.
Note:
A tip contains useful information that can improve or optimize your procedures.
Tip:
8 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.2 Important user information
1.3 Regulatory information
Introduction
This section lists the regulations and standards that apply to ReadyToProcess WAVE 25.
Manufacturing information
The table below summarizes the required manufacturing information.
InformationRequirement
GE Healthcare Bio-Sciences AB,Name and address of manufacturer
Björkgatan 30, SE 751 84 Uppsala, Sweden
In this section
See pageSection
101.3.1 EU Directives
111.3.2 Eurasian Customs Union
121.3.3 Regulations for USA and Canada
131.3.4 Other regulations and standards
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 9
1 Introduction
1.3 Regulatory information
1.3.1 EU Directives
Conformity with EU Directives
This product fulfills the European Directives listed below. See the EU Declaration of
Conformity for the directives and regulations that apply for the CE marking.
If not included with the product, a copy of the EU Declaration of Conformity is available
on request.
TitleDirective
Machinery Directive (MD)2006/42/EC
Electromagnetic Compatibility (EMC) Directive2014/30/EU
Low Voltage Directive (LVD)2014/35/EU
Restriction of Hazardous Substances (RoHS) Directive2011/65/EU
CE marking
The CE marking and the corresponding EU Declaration of Conformity is valid for the in-
strument when it is:
•
used according to the Operating Instructions or user manuals, and
•
used in the same state as it was delivered from GE, except for alterations described
in the Operating Instructions or user manuals.
10 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.3 Regulatory information
1.3.1 EU Directives
1.3.2 Eurasian Customs Union
Introduction
This section contains additional regulatory information to comply with the Eurasian
Customs Union technical regulations.
Manufacturer and importer
information
The table below summarizes the manufacturer and importer information required by
the Eurasian Customs Union.
InformationRequirement
See Manufacturing informationName and address of manufacturer
Telephone: + 46 771 400 600Telephone number of manufacturer
GE Healthcare LLCImporter and/or company for obtain-
ing information about importer
GE Healthcare Life Sciences
Presnenskaya nab., 10C, 12th floor
RU-123 317 Moscow, Russian Federation
Telephone 1: + 7 495 411 9714
Fax nr: + 7 495 739 6932
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 11
1 Introduction
1.3 Regulatory information
1.3.2 Eurasian Customs Union
1.3.3 Regulations for USA and Canada
NRTL certification
This symbol indicates that Ready to Process bioreactor has been certified by Intertek,
which is a US Occupational Safety and Health Administration Nationally Recognized
Testing Laboratory (NRTL).
This product Conforms to UL 61010-1, and is Certified to CAN/CSA-C22.2 No. 61010-1.
CAN ICES/NMB compliance
This product complies with the Canadian standard ICES-001/NMB-001 concerning
electromagnetic compatibility.
FCC compliance
This device complies with part 15 of the FCC Rules. Operation is subject to the following
two conditions: (1) This device may not cause harmful interference, and (2) this device
must accept any interference received, including interference that may cause undesired
operation.
The user is cautioned that any changes or modifications not expressly approved
by GE could void the user’s authority to operate the equipment.
Note:
This equipment has been tested and found to comply with the limits for a Class A digital
device, pursuant to part 15 of the FCC Rules. These limits are designed to provide rea-
sonable protection against harmful interference when the equipment is operated in a
commercial environment. This equipment generates, uses, and can radiate radio frequen-
cy energy and, if not installed and used in accordance with the instruction manual, may
cause harmful interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case the user will be re-
quired to correct the interference at his own expense.
12 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.3 Regulatory information
1.3.3 Regulations for USA and Canada
1.3.4 Other regulations and standards
Environmental conformity
This product conforms to the following environmental requirements.
TitleRequirement
Management Methods for the Restriction of the Use of Haz-
ardous Substances in Electrical and Electronic Products.
China RoHS
Standards, machinery and
electrical equipment
Standard requirements fulfilled by this product are summarized in the table below.
DescriptionStandard
Safety of machinery. General principles for design. Risk
assessment and risk reduction.
EN ISO 12100
Safety requirements for electrical equipment for mea-
surement, control, and laboratory use - Part 1: General
requirements.
EN 61010-1, IEC 61010-1,
UL 61010-1, CAN/CSA-
C22.2 No. 61010-1
Particular requirements for laboratory equipment for
the heating of materials
IEC/EN 61010-2-010
Electrical Equipment for Measurement, Control, and
Laboratory Use-EMC requirements-Part 1: General re-
quirements
EN 61326-1
(Emission according to CISPR 11, Group 1, class A)
NOTICE
This equipment is not intended for
use in residential environments
and may not provide adequate
protection to radio reception in
such environments.
Industrial, Scientific and Medical (ISM) Radio Frequency
Generators (Canada)
ICES-001/NMB-001
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 13
1 Introduction
1.3 Regulatory information
1.3.4 Other regulations and standards
Software declaration of
conformity
UNICORN 6.3, 7.0 and later versions are technically compatible with all relevant sections
of FDA 21 CFR Part 11.
A part 11-system assessment checklist is available on request from your local GE repre-
sentative.
14 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.3 Regulatory information
1.3.4 Other regulations and standards
1.4 Important concepts
Concepts and abbreviations used in this manual are explained in the table below.
ExplanationConcept/
abbreviation
The disposable container in which the cells are cul-
tured.
Cellbagâ„¢ bioreactor
Dissolved oxygen.DO
Optical sensor for measurement of dissolved oxygen.
Attached to DO configured Cellbag bioreactors.
DO sensor
Operating mode with one Cellbag bioreactor on the
rocker.
Single mode
Operating mode with two Cellbag bioreactors on the
same rocker. Cultivation is monitored and controlled
independently in the two bioreactors.
Dual mode
Optical sensor for pH measurement. Attached to pH
configured Cellbag bioreactors.
pH sensor
Control unit for gas mix, pH and DO control.ReadyToProcessâ„¢ CBCU
The pump.ReadyToProcess Pump 25
The rocker.ReadyToProcess WAVE 25
rocker
Tray for Cellbag, mounted on the rocker. Different
tray sizes are available for different culture capacities.
Tray
The entire bioreactor system, including rocker,
CBCU(s), and pump(s), together with Cellbag bioreac-
tor(s) and filter heater(s).
ReadyToProcess WAVE 25
The ReadyToProcess WAVE
25 system
The bioreactor system
The software used for controlling and monitoring the
system.
UNICORN
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 15
1 Introduction
1.4 Important concepts
1.5 User documentation
The table below describes the user documentation for ReadyToProcess WAVE 25, which
is available from the Help menu in UNICORN or on the user documentation CD.
Main contentsDocument
Instructions needed to install, operate and maintain
ReadyToProcess WAVE 25 in a safe way. Includes
basic UNICORN 7.0 system control functions.
ReadyToProcess WAVE 25
Operating instructions
Detailed system descriptions and instructions on
how to run, maintain and troubleshoot
ReadyToProcess WAVE 25. Includes UNICORN 7.0
system control functions, method creation and
handling, together with evaluation and presentation
of data.
ReadyToProcess WAVE 25
System Handbook
Brief instructions providing an overview of how to
run the system.
ReadyToProcess WAVE 25 Cue
Card
Overview and detailed description of network setup
and complete software installation. Administration
of UNICORN and the UNICORN database.
UNICORN Administration and
Technical manual
Dialog descriptions for UNICORN 7.0.UNICORN Online Help
CD containing the listed manuals and translated
versions of ReadyToProcess WAVE 25 Operating
instructions.
User Documentation CD
16 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
1 Introduction
1.5 User documentation
2 Safety instructions
About this chapter
This chapter describes safety precautions, labels and symbols that are attached to the
equipment. In addition, the chapter describes emergency shutdown procedures, and
provides recycling information.
Important
WARNING
Before installing, operating or maintaining the product, all users
must read and understand the entire contents of this chapter
to become aware of the hazards involved.
In this chapter
This chapter contains the following sections:
See pageSection
182.1 Safety precautions
262.2 Labels
352.3 Emergency procedures
382.4 Recycling information
392.5 Declaration of Hazardous Substances (DoHS)
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 17
2 Safety instructions
2.1 Safety precautions
Introduction
ReadyToProcess WAVE 25 is powered by mains voltage and handles materials that may
be hazardous. Before installing, operating or maintaining the system, you must be aware
of the hazards described in this manual.
Follow the instructions provided to avoid personal injuries, damage to the cell cul-
tures, to the product, or to other personnel and equipment in the area.
The safety precautions in this section are grouped into the following categories:
•
General precautions
•
Flammable liquids and explosive environment
•
Personal protection
•
Installing and moving the equipment
•
Power supply
•
System operation
•
Maintenance
Some of the safety precautions in this chapter concern situations that are described in
other manuals.
General precautions
WARNING
Do not operate the product in any other way than described in the
user documentation.
WARNING
Only properly trained personnel may operate and maintain the
product.
WARNING
Do not use any accessories not supplied or recommended by GE.
18 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
2 Safety instructions
2.1 Safety precautions
WARNING
Do not use ReadyToProcess WAVE 25 if it is not working properly,
or if it has suffered any damage, for example:
•
damage to the power cord or its plug
•
damage caused by dropping the equipment
•
damage caused by splashing liquid onto it
NOTICE
Any computer used with the equipment must comply with EN/IEC
60950-1, and be installed and used according to the manufacturer's
instructions.
Flammable liquids and explosive
environment
WARNING
ReadyToProcess WAVE 25 is not designed to handle flammable
liquids.
WARNING
ReadyToProcess WAVE 25 is not approved for work in a potentially
explosive atmosphere.
Personal protection
WARNING
Always use appropriate Personal Protective Equipment (PPE) during
operation and maintenance of this product.
ReadyToProcess WAVE 25 Operating Instructions 29009597 AD 19
2 Safety instructions
2.1 Safety precautions
WARNING
Hazardous substances. When using hazardous chemical and
biological agents, take all suitable protective measures, such as
wearing protective glasses and gloves resistant to the substances
used. Follow local and/or national regulations for safe operation,
maintenance and decommissioning of the system.
WARNING
Spread of biological agents. The operator must take all necessary
actions to avoid spreading hazardous biological agents. The facility
must comply with the national code of practice for biosafety.
Installing and moving the
equipment
CAUTION
Heavy object. Because of the significant weight of ReadyToProcess
WAVE 25 rocker, assistance from another person is highly recom-
mended when lifting or moving the equipment. Use the handles
on the sides of the rocker when possible. Do not lift ReadyToProcess
WAVE 25 rocker with tray attached.
CAUTION
Due to the size and weight of Tray 50, at least two persons are
recommended for installing the tray.
CAUTION
Falling equipment. Do not stack more than one ReadyToProcess
CBCU and/or ReadyToProcess Pump 25 unit on top of each other.
20 ReadyToProcess WAVE 25 Operating Instructions 29009597 AD
2 Safety instructions
2.1 Safety precautions
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120
  • Page 121 121
  • Page 122 122
  • Page 123 123
  • Page 124 124
  • Page 125 125
  • Page 126 126
  • Page 127 127
  • Page 128 128
  • Page 129 129
  • Page 130 130
  • Page 131 131
  • Page 132 132
  • Page 133 133
  • Page 134 134
  • Page 135 135
  • Page 136 136
  • Page 137 137
  • Page 138 138
  • Page 139 139
  • Page 140 140
  • Page 141 141
  • Page 142 142
  • Page 143 143
  • Page 144 144
  • Page 145 145
  • Page 146 146
  • Page 147 147
  • Page 148 148
  • Page 149 149
  • Page 150 150
  • Page 151 151
  • Page 152 152
  • Page 153 153
  • Page 154 154
  • Page 155 155
  • Page 156 156
  • Page 157 157
  • Page 158 158
  • Page 159 159
  • Page 160 160
  • Page 161 161
  • Page 162 162
  • Page 163 163
  • Page 164 164
  • Page 165 165
  • Page 166 166
  • Page 167 167
  • Page 168 168
  • Page 169 169
  • Page 170 170
  • Page 171 171
  • Page 172 172

GE ReadyToProcess WAVE 25 Operating Instructions Manual

Type
Operating Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI