1. HIGH-FLOW KIT INSTALLATION STORM - SEED TREATER
1.5. INSTALL AND TEST THE SECOND PUMP HEAD
10 30982-R1
2. Slide the extended mounting screws (see Figure 1.4) through the empty mounting
holes of the second pump head.
3. Align the extended mounting screws with the screw holes of the installed pump
head.
4. Fit the second pump head onto the installed pump head.
5. Turn the rotor of the second pump head to connect the shafts of the two pump
heads.
Note: The shafts are properly seated in the receiver when the additional pump heads move
closer together.
6. Tighten the extended mounting screws.
1.5.2. To Test the Second Pump Head
1. From the main menu, tap Maintenance — Flush Out.
2. Ensure the conveyor and pump 2 are set to Off.
3. Ensure pump 1 is set to On in the Forward direction.
4. For 2015 models, verify the pump heads are rotating clockwise. For 2014 models,
verify the pump heads are rotating counterclockwise.
5. Tap Stop after verifying the pump rotation.
Note: If the pump heads do not rotate, the extended mounting screws are likely too tight.
Loosen the screws until both rotors begin to rotate. Tighten and loosen the screws as
required. If the pump heads continue to seize, remove both pump heads and strike the
mounting surface with a rubber mallet to ensure the mounting surface is true.
Table 1.4.
#Description
1Installed pump head
2Second pump head
3Extended mounting screws
4Path to align mounting screws