SCE SCE-20POS, SCE-22POS, SCE-26POS, SCE-342424SSWS, SCE-342424WS, SCE-642424SSWS, SCE-642424WS, SCE-642432SSWS, SCE-642432WS, SCE-66ST2626SSWS, SCE-66ST2626WS Installation Information

  • Hello! I've reviewed the provided installation instructions for the Saginaw Control pull out shelves, specifically models SCE-20POS, SCE-22POS, and SCE-26POS. This document includes assembly steps, parts details, and diagrams to guide you through the installation process. I'm ready to answer any questions you might have about these products and the assembly process.
  • What parts are included with the pull out shelf?
    How are the Z-rails attached?
    How is the height of the pull-out shelf adjusted?
PULL OUT SHELF
1
SCE-20POS
SCE-22POS
SCE-26POS
ITEM
#
PART NAME
QTY.
1
Z-RAIL
2
2
SLIDE RAIL
2
3
1/4-20 X 3/4 SLOTTED HEX HEAD
SCREW
4
4
1/4-20 CHANNEL NUTS
4
INSTALLATION INSTRUCTIONS
1.
INSTALL (4) CHANNEL NUTS (ITEM 4) INTO
CHANNELS PROVIDED ON THE RIGHT AND
LEFT SIDE OF THE ENCLOSURE
2. ATTACH RIGHT AND LEFT Z-RAIL (ITEM 1)
AS SHOWN. USE (4) SCREWS (ITEM 3) AND
THREAD INTO THE CHANNEL NUTS (ITEM 4)
IN THE RIGHT AND LEFT SIDE.
3. ADJUST THE PULL OUT SHELF TO THE
DESIRED HEIGHT AND TIGHTEN SCREWS
(ITEM 3)
SECTION VIEW:
INSIDE L.H. WALL OF
WORKSTATION ENCLOSURE
EXPLODED VIEW:
SCE-20POS INSIDE
WORKSTATION ENCLOSURE
/