Mastervolt CZone MasterBus Bridge Interface Installation guide

Type
Installation guide
Installation CZone – MasterBus Bridge Interface
Mastervolt International B.V, P.O.Box 22947, NL-1100 DK Amsterdam, The Netherlands. Tel.: +31-20-3422100 Email: info@mastervolt.com Copyright © Mastervolt v1.1 120718EN
CZone - MasterBus
Bridge Interface
Red - Fault
Orange Flash - Traffic
Green - Active/OK
TM
1 2
3
5
Check if the CZone - MasterBus Bridge Interface works correctly.
Red - Fault
Orange Flash - Traffic
Green - Active/OK
LED (3) functions:
Green: Active/OK, CZone (1) and MasterBus (2) connected.
Orange flashing: Traffic, communication.
Red: Fault, no connection.
If there is no connection, check the cables first.
Then check the configuration in both networks.
3
Check the contents of the delivery.
Contact your supplier if one of the items is missing.
Do not use the Bridge Interface if it is damaged!
MasterBus
adapter
User’s
manual
CZone - MasterBus
Bridge Interface
CZone - MasterBus
Bridge Interface
Red - Fault
Orange Flash - Traffic
Green - Active/OK
TM
4
1. CZone terminator
2. CZone devices
3. CZone terminator
4. Bridge Interface
5. CZone connector
6. MasterBus connector
7. Adapter including cable
8. MasterBus terminator
9. MasterBus devices
10. MasterBus terminator
11. Polarization nock
Mount the interface on a sturdy
underground. Use 4 mm screws
or bolts. The hole-to-hole distance
is 55 mm. The minimum
installation height including
connectors is 100 mm. Install the
interface like indicated. The CZone
connector must be plugged at the
left hand side (5), the MasterBus
connector at the right (6). Notice
the polarization nock (11).
Be sure to put terminators at
the e
nds of both networks!
C1 C2 C3
M2 M3
1 3
2
5 6
7
10
4
M1
8
9
2
9
TM
11
This Quick installation guide provides a brief overview of the CZone – MasterBus Bridge Interface installation.
Reading the user’s manual is still necessary for safety instructions and years of trouble-free service.
The CZone – MasterBus Interface manual is available at www.Mastervolt.com.
2
Read the safety instructions (chapter 2 of the user’s manual).
Mastervolt does not hold itself liable for:
Damage resulting from the use of the CZone – MasterBus Bridge Interface;
Possible errors in the included manual and the consequences of these;
Use that is inconsistent with the purpose of the product.
  • Page 1 1

Mastervolt CZone MasterBus Bridge Interface Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI