ABB i-bus
£
KNX Contents
© 2010 ABB STOTZ-KONTAKT GmbH ii
3.2.12 Commissioning without bus voltage................................................93
3.3 Communication objects...................................................................... 94
3.3.1 General............................................................................................ 94
3.3.2 Manual operation............................................................................. 95
3.3.3 Control input....................................................................................96
3.3.3.1 Communication objects HVAC System – 1 Control value/2-pipe. 96
3.3.3.2 Communication objects HVAC System 1 Control value/4-pipe,
with switching object..................................................................... 97
3.3.3.3 Communication objects HVAC System 2 Control values/2-pipe.. 98
3.3.3.4 Communication objects HVAC System 2 Control values/2-pipe,
with switching object..................................................................... 99
3.3.3.5 Communication objects HVAC System 2 Control values/4-pipe 100
3.3.3.6 Communication object Fault control value.................................. 101
3.3.4 Multi-level fan ................................................................................ 102
3.3.5 One-level fan.................................................................................109
3.3.6 Valve HEATING............................................................................. 113
3.3.7 Valve COOLING............................................................................ 115
3.3.8 Input A ........................................................................................... 116
3.3.9 Input B ........................................................................................... 118
3.3.10 Output............................................................................................ 119
4 Planning and application 121
4.1 Heating, ventilation, climate control with Fan Coil units................... 121
4.1.1 Terms............................................................................................. 121
4.1.2 Fan operation ................................................................................ 122
4.1.2.1 Fan in a two-way connection ...................................................... 123
4.1.2.2 Fan with speed switching............................................................ 123
4.1.3 Configuration of a HVAC system with Fan Coil units.................... 124
4.1.4 Design of a Fan Coil unit.............................................................. 124
4.1.5 Pipe systems .................................................................................125
4.1.5.1 2 pipe system, configuration....................................................... 126
4.1.5.2 2-pipe system HEATING and COOLING.................................... 127
4.1.5.3 2-pipe system HEATING or COOLING....................................... 128
4.1.5.4 3-pipe system, configuration....................................................... 129
4.1.5.5 4-pipe system, configuration....................................................... 130
4.2 System configuration with a Fan Coil Actuator................................ 131
4.2.1 Automatic operation....................................................................... 132
4.2.2 Direct operation.............................................................................134
4.2.3 Switchover between automatic and direct operation..................... 134
4.2.4 Logic of the speed switching ......................................................... 135
4.2.5 Fan operation functional diagram.................................................. 136
4.3 Valve drives, valves and controller .................................................. 137
4.3.1 Electromotor valve drives.............................................................. 137
4.3.2 Electro-thermal valve drives.......................................................... 137
4.3.3 Valve curve....................................................................................138
4.3.4 Control types .................................................................................141
4.3.4.1 Continuous control...................................................................... 141
4.3.4.2 Pulse width modulation (PWM)................................................... 142
4.3.4.3 Pulse width modulation – calculation.......................................... 144
4.4 Behaviour with, …............................................................................ 145
4.4.1 Bus voltage recovery..................................................................... 145
4.4.2 Reset via bus.................................................................................147
4.4.3 Download (DL)............................................................................... 148
4.4.4 Reaction on bus voltage failure..................................................... 149
4.4.5 Behaviour with bus voltage failure, recovery and download......... 149
4.5 Priorities with, …..............................................................................153