Effluent Pump
Quick Reference Guide
See instruction manual for
complete instructional details.
1. Ensure basin is clear of all debris and place pump on hard level
surface (not dirt or gravel). 30” x 18” minimum basin requirement.
2. Measure, cut and install discharge fittings, check valve, and piping.
Drill a 1/8” hole in the discharge pipe about 2“-3” above the pump
discharge connection.
3. Plug Pump in to GFCI outlet on dedicated circuit with 15 amp
breaker
4. Test operation by filling the basin above the Float Switch Operation
ON Height to make the pump start pumping out. When the water
reaches below the Float Switch Operation OFF Height, ensure it
stops pumping.
5. Install optional basin cover.
18” Minimum
30” Minimum
1/8” Vent Hole
Check Valve
2” Discharge Pipe GFCI Outlet
ON Height:17”
OFF Height:9.91”
EB-0040-rev 10/2021