BEFORE YOU BEGIN COMPONENT KEY
FOCAL POINT
Configurations are run specific, please
consult factory drawings before
beginning installation.
Luminaires must be installed by a qualified
electrician (check with local and national
codes for proper installation).
To prevent electrical shock, disconnect
electrical supply before installation or
servicing.
Contractor is responsible for adequately
reinforcing walls and/or ceilings to support
fixture weight.
Focal Point, LLC accepts no responsibility
for inadequately reinforced walls and/or
ceilings.
The information contained in this drawing
is the sole property of Focal Point, LLC. Any
reproduction in part or whole without the
written permission of Focal Point, LLC is
prohibited.
POWER OFF
POWER ON
ATTENTION
SEE ADDITIONAL
INSTRUCTIONS
INSTRUCTION KEY
Flat Washer
1.5" x .281" x .062"
(75221)
Bolt
1/4-20 x 4.5"
(700547)
SEEM  ACOUSTIC
TRUBLADE
DIRECT TO STRUT HARDWARE
SHIPPED IN BAG
SEEM  ACOUSTIC DIRECT TO STRUT INSTALLATION  PG 
SEEM  ACOUSTIC AIRCRAFT CABLE INSTALLATION  PG 
TRUBLADE STRUTKLIP INSTALLATION  PG 
TRUBLADE MAGNET INSTALLATION  PG 
TRUBLADE AIRCRAFT CABLE INSTALLATION  PG 
MULTIPLE ARRAY INSTALLATION  PG 
SEEM  ACOUSTIC LUMINAIRES
MUST BE INSTALLED PRIOR TO
INSTALLING TRUBLADE BAFFLES
Aircraft Cable
with Stop Sleeve
(73060-XX)
StrutKlip
(A55717-01)
STRUTKLIP HARDWARE
SHIPPED IN BAG
AIRCRAFT CABLE SUSPENSION
HARDWARE SHIPPED IN BAG
Cable
Coupler
(73650)
4"
6" 12"
6"
4"
12"
4"
6" 12"
6"
4"
12"
Spacer Tool
(A59289)
INSTALLATION TOOL
SHIPPED IN PACKAGING
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
2 of 9
IS0792 REV. B
FACTORY DRAWINGS
TRUBLADE INSTALLATION SEQUENCE
Each TruBlade bale is labeled with a fixture key that is aixed to the extrusion. DO NOT REMOVE LABEL.
Match the fixture key on the factory drawing with the
corresponding fixture key on the TruBlade bale to
determine the installation sequence.
Ensure all TruBlade bales are installed with the fixture
key facing the same direction.
QTY 1 SEEM 1 LUMINAIRE
QTY 48 TRUBLADE
CONSULT FACTORY DRAWINGS FOR MOUNTING LOCATIONS AND OTHER INSTALLATION DIMENSIONS
WA-U1
WA-U1
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
3 of 9
IS0792 REV. B
STRUT INSTALLATION
AVOID INSTALLING STRUT SUSPENSION RODS
AND BOLTS AT MOUNTING LOCATIONS
SPACER TOOL
INSTALLATION METHOD STRUT ORIENTATION
Seem 1 Acoustic Direct to Strut Strut can be installed in "n" or "u" orientation
Seem 1 Acoustic Aircraft Cable Strut can be installed in "n" or "u" orientation
TruBlade StrutKlip Strut must be installed in "n" orientation
TruBlade Magnet Strut must be installed in "u" orientation
TruBlade Aircraft Cable Strut can be installed in "n" or "u" orientation
STRUT FOR SEEM  ACOUSTIC INSTALLS PERPENDICULARLY
ABOVE STRUT FOR TRUBLADE BAFFLES
4"
6"
12"
4"
6" 12"
6"
4"
12"
4"
6" 12"
6"
4"
12"
Bend spacer tool at perforation
for 6" on-center spacing
Use the provided spacer tool to evenly space and install TruBlade bales.
6"
4"
12"
4"
6"
4"
6" 12"
4" on-center spacing 6" on-center spacing 12" on-center spacing
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
4 of 9
IS0792 REV. B
SEEM  ACOUSTIC DIRECT TO STRUT INSTALLATION
STRUT CAN BE INSTALLED
IN "n" OR "u" ORIENTATION
FOR CONTINUOUS RUNS MORA CREATE
FOLLOW FOCAL POINT INSTRUCTIONS
FOR SEEM  ACOUSTIC
DIRECT TO STRUT JOINING
SEE IS
AVOID INSTALLING STRUT
SUSPENSION RODS AND BOLTS AT
SEEM  ACOUSTIC MOUNTING LOCATIONS
2b
3a 3b
12a
Strut for Seem 1 Acoustic installs
perpendicularly above strut for TruBlade baes.
4.625"
1.87"
3.00"
9.25"
Center Seem 1 Acoustic between TruBlade baes. Refer to factory drawings for specic installation dimensions.
4
MAKE ELECTRICAL CONNECTION
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
5 of 9
IS0792 REV. B
Adjust mounting bolt depth so that the top of Seem 1 Acoustic is flush with the top of TruBlade bales
5
3
1
HARDWARE BY OTHERS
/" 
THREAD
2a 2b
Strut for Seem 1 Acoustic installs
perpendicularly above strut for TruBlade baes.
4.625"
1.87"
3.00"
9.25"
Center Seem 1 Acoustic between TruBlade baes. Refer to factory drawings for specic installation dimensions.
SEEM  ACOUSTIC AIRCRAFT CABLE INSTALLATION
FOLLOW FOCAL POINT INSTRUCTIONS
FOR SEEM  ACOUSTIC
SUSPENDED JOINING
SEE IS
AVOID INSTALLING STRUT
SUSPENSION RODS AND BOLTS AT
SEEM  ACOUSTIC MOUNTING LOCATIONS
STRUT CAN BE INSTALLED
IN "n" OR "u" ORIENTATION
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
6 of 9
IS0792 REV. B
456
MAKE ELECTRICAL CONNECTION
Adjust cable height so that the top of Seem 1 Acoustic is flush with the top of TruBlade bales
7
3
11
2
Rotate StrutKlip 90° to lock into place
Use spacer tool to evenly space and
install the remaining StrutKlip fasteners.
Refer to factory drawings for
specic installation dimensions.
1a
Insert StrutKlip lengthwise into strut channel
TRUBLADE STRUTKLIP INSTALLATION
STRUT MUST BE INSTALLED
IN "n" ORIENTATION
AVOID INSTALLING STRUT
SUSPENSION RODS AND BOLTS AT
TRUBLADE MOUNTING LOCATIONS
1b
Insert StrutKlip lengthwise into strut channel
4"
6" 12"
6"
4"
12"
4"
6" 12"
6"
4"
12"
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
7 of 9
IS0792 REV. B
3
11
1
2
Magnet is preinstalled
on TruBlade bae
Attach TruBlade bae directly to strut
TRUBLADE MAGNET INSTALLATION
STRUT MUST BE INSTALLED
IN "u" ORIENTATION
Use spacer tool to evenly space
and install the remaining TruBlade baes.
Refer to factory drawings for specic installation dimensions.
AVOID INSTALLING STRUT
SUSPENSION RODS AND BOLTS AT
TRUBLADE MOUNTING LOCATIONS
7
511
6
Ensure StrutKlip fully engages with TruBlade extrusion
Install remaining TruBlade baes
Install TruBlade bae
4
Repeat installation of StrutKlip fasteners on second unistrut row
8
Center and align edges of TruBlade baes to ensure ush installation
4"
6" 12"
6"
4"
12"
4"
6" 12"
6"
4"
12"
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
8 of 9
IS0792 REV. B
6
Install remaining TruBlade baes
2
Use spacer tool to evenly space and
install the remaining suspension points.
Refer to submittal drawings for specic installation dimensions.
5
4
3a 3b
TRUBLADE AIRCRAFT CABLE INSTALLATION
1
HARDWARE BY OTHERS
/" 
THREAD
AVOID INSTALLING STRUT
SUSPENSION RODS AND BOLTS AT
TRUBLADE MOUNTING LOCATIONS
4
Center and align edges of TruBlade baes to ensure ush installation
4"
6" 12"
6"
4"
12"
4"
6" 12"
6"
4"
12"
STRUT CAN BE INSTALLED
IN "n" OR "u" ORIENTATION
©2023 Focal Point, LLC | 4141 S. Pulaski Rd., Chicago, IL 60632 | www.focalpointlights.com/reference
9 of 9
IS0792 REV. B
MULTIPLE ARRAY INSTALLATION
." MINIMUM SPACING RECOMMENDED BETWEEN ARRAYS.
REFER TO RCP REFLECTED CEILING PLAN FOR EXACT DIMENSIONS.
7
Level and align top of TruBlade baes to ensure ush installation
." SPACING BETWEEN ARRAY MOUNTING LOCATIONS.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9

Focal Point Mora Create Alpine AMRC-ALP Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI