Kval Architect DI Owner's manual

Type
Owner's manual
Innovation, Quality & Honesty
Operation and Service Manual
: 6/16/15
Architect-DI System
KVAL Architect-DI Operation/Service Manual
Proprietary Notice
This Manual is confidential and contains proprietary information and intellectual
property of KVAL Inc., and is to be used solely by Customer as an operating manual
for KVAL Inc. machines. Neither this Manual nor any of the information contained
herein may be reproduced or disclosed under any circumstances without the express
written permission of KVAL Inc. For authorization to copy this information, please
call Kval Customer Support at (800) 553-5825 or fax (707) 762-0485. Outside the
U.S. and Canada, call (707) 762-7367.
Manual Part Number: 070_OPSRV_ARCHDI_V1
The Architect-DI is a trademark of Kval Incorporated.
Copyright 2014 Kval Incorporated. All rights reserved.
Beckhoff® , TwinCAT 2® , and EtherCat® are registered trademarks and are licensed
by Beckhoff Automation GmbH
Windows 7® is a registered trademark of Microsoft Corporation.
All other products are trademarks or registered trademarks of their respective holders,
all rights reserved. Reference to these products is not intended to imply affiliation with
or sponsorship of Kval Incorporated.
Contacting KVAL
Customer Service: For further information about this manual or other Kval Incorpo-
rated products, contact the Customer Support Department
• Mailing address:
Customer Support Department
Kval Incorporated
825 Petaluma Boulevard South
Petaluma, CA 94952
• Phone and Fax:
In the U.S and Canada, call (800) 553-5825 or fax (707) 762-0485
Outside the U.S. and Canada, call (707) 762-7367 or fax (707) 762-0485
• Business hours:
Technical Support:
6:00 AM to 4:00 PM Pacific Standard Time, Monday through Thursday
6:30 AM to 1:30 PM Pacific Standard Time, Friday
Parts & Service Sales:
6:30 AM to 4:00 PM Pacific Standard Time, Monday through Thursday
6:30 AM to 1:30 PM Pacific Standard Time, Friday
(Other sales related inquiries: http://www.kvalinc.com)
KVAL Architect-DI Operation/Service Manual
KVAL Architect-DI Operation/Service Manual
Your Feedback is Welcome: To help us design products that make your job easier
and your business more successful, we'd like to gain your perspective about your user
experience with our product - that is, the manual, the machinery, the software, etc.
What was easy or difficult to use or to learn? If you could change something about the
design, what would it be? Please email your comments and suggestions for improve-
ment to [email protected]. (NOTE: This is not a customer support email
link. For that, please refer to the Customer Service contact information above.) Thank
you!
http://www.kvalinc.com
KVAL Architect-DI Operation/Service Manual
KVAL Architect-DI Operation/Service Manual
Chapter 1 Introduction to the Architect-DI
Chapter 1 at a Glance.............................................................. 1-1
Overview of the Architect-DI System ....................................... 1-2
Available Options..................................................................................1-3
About this Manual .................................................................................1-3
Safety First!.............................................................................. 1-5
Safety Sheet Sign-Off Sheet.................................................................1-5
Safety Terminology of Labels................................................................1-5
Safety Guidelines..................................................................................1-5
Lockout Tagout Procedure....................................................................1-9
Follow the P-R-O-P-E-R lockout rule of thumb...................................1-11
Zero-Energy to Start-Up........................................................... 1-12
Zero-Energy State to Start-Up to Operating State ..............................1-12
Getting Help from KVAL........................................................... 1-14
On-Line Help.......................................................................................1-14
Product Return Procedure..................................................................1-14
How to Download the Service Application ............................... 1-16
Download Application .........................................................................1-16
Safety Sign-Off Sheet .............................................................. 1-19
A Note to the Operator:.......................................................................1-19
Chapter 2 Operation of the Architect-DI
Operators Tour........................................................................ 2-2
In-Feed Section ....................................................................................2-3
Front Section ........................................................................................2-4
Back Section.........................................................................................2-6
Out-Feed...............................................................................................2-9
About the Electrical Panels.................................................................2-10
Description of the Six Light Panel ......................................................2-11
About Switches and Sensors..............................................................2-12
Quick Start ............................................................................... 2-14
Powering Operations for the Architect-DI ................................ 2-15
How to Power Up the Architect-DI......................................................2-15
Home the Machine..............................................................................2-16
How to Power Down the Machine.......................................................2-16
Emergency Shutdown and Recovery .................................................2-17
Table of Contents
TOC
Architect -DI
Description of User Interface Screens ..................................... 2-18
Screen Selection Menu Map.................................................... 2-19
Machine Feed Back ............................................................................2-20
Main Control Screen ...........................................................................2-20
About the Lock Plates Tab ..................................................................2-25
About the Predrill Tab ........................................................................2-26
Predrill Template References..............................................................2-27
About Manual Control Tab ..................................................................2-28
About the Status Screen.....................................................................2-30
About the Log Screen .........................................................................2-31
Important: Sequence of Calibration ......................................... 2-32
About Calibration .................................................................... 2-33
About the Calibration Buttons .............................................................2-33
How to Enter Calibration Data ............................................................2-34
Hinge Head Menu Map.......................................................................2-36
About Head Axes Calibration..............................................................2-36
About Head Chisels Calibration..........................................................2-38
About Hinge Router and Predrill Calibrations .....................................2-39
Back Section Calibration Menu Map...................................................2-40
Door Stop Menu Map..........................................................................2-44
KVAL 2012 User Interface Visual Tour .................................... 2-46
Entering Data......................................................................................2-46
Structure, how the program thinks:.....................................................2-47
Door Files: Creation and Editing.............................................. 2-48
Creating and Saving a Permanent Door File ......................................2-48
Creating a New Permanent Door File.................................................2-49
Creating a Permanent Door File from an Existing Door File...............2-50
Modifying (Permanently) an Existing Door File...................................2-51
Merging Doors ....................................................................................2-53
Creating Door Templates From Merged Doors...................................2-53
Deleting a Door File ............................................................................2-54
Chapter 3 System IT Administration
System IT Administration......................................................... 3-2
About the Architect-DI Computer..........................................................3-2
Connections on the PLC.......................................................................3-2
Backing up the Computer .....................................................................3-3
About Remote Connection to KVAL Service.........................................3-3
TOC
KVAL Architect-DI Operation/Service Manual
Chapter 4 Maintenance of the Architect-DI
Maintenance Schedule ............................................................ 4-2
Daily......................................................................................................4-2
Weekly ..................................................................................................4-2
Six Month Checkups.............................................................................4-3
Lubrication Requirements........................................................ 4-4
Linear Bearings, Flange Bearing, and Pillow Blocks ............................4-4
Gear Motor Lubrication Requirements..................................................4-5
Ball Screws ...........................................................................................4-5
Description of Air Input System ............................................................4-5
Adjusting the Air Line Lubricator ..........................................................4-6
Priming the Air Line Lubricator .............................................................4-6
Replacing Bits.......................................................................... 4-7
Replacing Bits in the Front Section ......................................................4-7
How to Access to Bit Assemblies .........................................................4-7
Back Section.........................................................................................4-9
Changing the Bore Drill.......................................................................4-10
Changing the Bolt Drill ........................................................................4-10
Chapter 5 Troubleshooting the Architect-DI
About Motion Control ............................................................... 5-2
Basic Control Circuit .............................................................................5-2
Typical Positioning Systems .................................................................5-4
Troubleshooting Basics ........................................................... 5-7
Before you Adjust .................................................................................5-7
Analyze the Sub Systems.....................................................................5-8
Using Sensors to Trouble Shoot .............................................. 5-10
Troubleshooting Electrical Problems ....................................... 5-11
If the Power Stops During Normal Operation......................................5-11
Troubleshooting with the Status Light Panel ......................................5-12
About VFD Troubleshooting ...............................................................5-17
Troubleshooting the Air Cylinders............................................ 5-18
Adjusting Cylinder Extension Speed:..................................................5-19
Adjusting Cylinder Retraction Speed: .................................................5-19
Network System Overview....................................................... 5-20
Connections to Servo Drives ..............................................................5-20
Connections to VFD’s (High Freq Panel)............................................5-20
TOC
Architect -DI
TOC
Chapter 1 at a Glance
1-1
KVAL Architect-DI Operation/Service Manual
CHAPTER 1 Introduction to the Architect-DI
This chapter provides an overview of the KVAL Architect-DI System and important safety infor-
mation to follow when operating the machine.
Chapter 1 at a Glance
Section Name Summary Page
Overview of the
Architect-DI System
This section provides an overview of the Architect-DI. It
includes a general description and a table of available
options
page 1-2
Safety First! IMPORTANT safety information is described in this
section
page 1-5
Zero-Energy to Start-Up Procedure to power up your machine for the first time. page 1-12
Getting Help from KVAL This section describes the method to contact the KVAL
service center for help. The section includes how to get
information from the specification plate tor provide to
KVAL, service center hours, and return procedures
page 1-14
How to Download the
Service Application
Procedure to download an interactive application to
allow Service Technicians to control your machine and
help troubleshoot.
page 1-16
Safety Sign-Off Sheet A record to track operators that are trained on the
machine.
page 1-19
CH-1
Overview of the Architect-DI System
1-2 KVAL Architect-DI Operation/Service Manual
Overview of the Architect-DI System
KVAL's Architect-DI automatically positions, routs, and bores architectural doors for hinges and
locks in about 25-30 seconds, door-to-door. This fast cycle time also includes drilling hinge screw
holes for hinge pockets and lever lock screw holes with the optional drill cartridge system.
The "DI" after the Architect's name refers to digital integration. The Windows-based computer
system and 21 servo drives are integrated into the Architect-DI to vastly reduce set-up times and
eliminate errors. All of the adjustments listed below are now fully automatic and all of them are
accomplished simultaneously in under 10 seconds.
• Door Width
• Door Length
• Door Thickness
• Left/Right Door Swing
• 1 to 4 Hinges
• Hinge Centers
• Hinge Bevel (0 or 3 degrees)
• Hinge Pocket Backset
• Pre-Drill Location & Backset for 4-1/2” Hinges
• Lock 1 Centerline and Backset
• Lock 2 Centerline and Backset
Programming:
The Architect-DI features a touch screen panel connected to a high speed computer with a Win-
dows ® operating system. Pre-programmed door files or “recipes” are accessed by touching the
on-screen drop down list, and then touching the appropriate file name. Depending on the selected
file, a graphic image of the door changes the hand, number of hinges and locks, and a list of
parameters along the right edge of the screen updates. These parameters include all the items
listed, along with a list of less frequent manual adjustments, like hinge width, hinge depth, and
lock backset.
New files can be created, or existing parameters modified, by touching the part of the door image
the operator wants to change. For example, touch the second hinge to enter a new location. The
individual parameter on the screen also changes to red, and the operator can enter new dimensions
in decimals, fractions or even metric with a convenient number pad displayed at the bottom of the
screen. If preferred, a standard PC mouse and keyboard can be plugged in for data entry.
Because the system is PC based, there is virtually no limit to the number of different patterns that
can be stored. The computer is equipped with a network card to connect to your facility's com-
puter system for downloads, backups, and for remote support from our service center in Califor-
nia. Barcode scanning, which automatically reads barcode labels on incoming doors and
automatically selects the correct program pattern for that door, can be quoted on request.
CH-1
Overview of the Architect-DI System
1-3
KVAL Architect-DI Operation/Service Manual
System Vigilance:
A second user interface displays a use-friendly tabbed menu to monitor the real-time performance
of the Architect-DI. With a single click, the performance of servo motor assemblies, program
information, and machine position can be viewed. From this powerful interface, fine tuning to
servo motors can be achieved, manual control of machine can be performed, error logs can be
observed, and speed of the machine process can be controlled.
Available Options
The table below lists the available Options for this machine. Check the machine contract to verify
what options are applied to your machine.
Option Title Description
Option A1 Lever Lock Gearbox - Sargeant 6500
Series
Drill Attachment
Option A2 Lever Lock Gearbox - Yale 8071 Series Drill Attachment
Option A3 Lever Lock Gearbox - Schlage D-792
Series
Drill Attachment
Option A4 Lever Lock Gearbox - Corbin-Russwin
8VG-304 Series
Drill Attachment
Option A5 Lever Lock Gearbox - Best 093-K
Series
Drill Attachment
Option B CNC Horizontal Hinge Movement &
Hinge Corner Chisels
With this option you have the ability to not only square the 1/4
radius hinge pockets on the door, but to also use a 1/2" bit to cut a
5/8" radius hinge pocket. This option also allows you to select
your hinge pocket length & width.
Option SB Servo Back-section with Corner Squar-
ing
Architect-DI system combines very high quality hardware detail-
ing, with high speed productivity. Unique features include com-
puter controlled ball screw movements for all router and chisels,
complete with square lock face plates.Backsection will have the
ability to machine a face plate at both "0" and "3" degree. Opera-
tor can select widths from 1" to 1-1/4" wide and up to 2-3/4" in
length.
Option O Door Blow-Off System Air blow-off tube cleans dust and chips off the top of door
Option SE Single 440volt Electrical Drop
Option W Point to Point Pre-Drill Four (4) single spindle drill units (one for each hinge) with pro-
grammed motion to pre-drill holes in succession for hinge
screws. The screw pattern is saved and recalled by name The
cycle adds approximately 10 seconds to that of the multiple spin-
dle pre-drill. Requires Corner Squaring option.
About this Manual
This manual contains operation information and service and maintenance information.
It includes identification of machine assemblies, power-up and power-down steps, and informa-
tion about using the user interface.
CH-1
Overview of the Architect-DI System
1-4 KVAL Architect-DI Operation/Service Manual
The Troubleshooting and Maintenance sections are directed toward qualified service
technicians
TABLE 1- 1.
Title Part Number
Architect-DI Operation and Service Manual 070_OPSRV_Archdi
CH-1
Safety First!
1-5
KVAL Architect-DI Operation/Service Manual
Safety First!
This machine is a powerful electro-mechanical motion control
system. You should test your motion system for safety under
all potential conditions. Failure to do so can result in dam-
age to equipment and/or serious injury to personnel.
Safety Sheet Sign-Off Sheet
At the end of this chapter, there is a safety sign-off sheet. It lists personnel and machine safety cri-
teria to understand before operating the machine. It is highly recommended that personnel operat-
ing, working on a machine meet the criteria listed in this sheet. It is recommended the sheet be
signed and kept for records. See “Safety Sign-Off Sheet” on page 1-19.
Safety Terminology of Labels
In addition to the nameplate, KVAL machines may have other warning labels or decals that pro-
vide safety information to operators. Safety labels should be clearly visible to the operator and
must be replaced if missing, damaged, or illegible.
There are three types of warning labels or decals:
DANGER means if the danger is not avoided, it will cause death or serious injury.
WARNING means if the warning is not heeded, it can cause death or serious
injury.
CAUTION means if the precaution is not taken, it may cause minor or moderate
injury.
Safety Guidelines
In addition to the caution and warning labels affixed to this machine, follow the guidelines below
to help ensure the safety of equipment and personnel.
Ensure that all employees who operate this machine
are aware of and adhere to all safety precautions
posted on the machine and are trained to operate this
machine in a safe manner.
Training
CH-1
Never operate the machine without proper eye and
ear protection.
Protective Gear
Never reach hands beyond safety cage. Servo
motors can unexpectedly move quickly.
Never clear screws or hinges out of the machine
while it is running.
Never reach into the router area to retrieve a
hinge. The router may still be running down
after shut down.
Never perform any maintenance unless machine
is at zero state.
Never clean the machine while it is running.
Never walk away from the machine while it is
running.
When the Machine is ON
The compressed air system connected to this
machine should have a three-way air valve
for shut-off and pressure relief.
All cylinders on machine are under high
pressure and can be very dangerous when
activated. Before performing any mainte-
nance or repairs on this machine turn off the
main air disconnect. Lockout and tagout
this connection.
See “Lockout Tagout Procedure” on
page 1-9.
Compressed Air
Safety First!
1-6 KVAL Architect-DI Operation/Service Manual
CH-1
Electrical circuitry on this
machine is protected by an
approved lockable disconnect
circuit. In addition to this equip-
ment, you must install an
approved disconnect for the
electrical power supplying this
machine.
When opening the cabinet you must first turn off the
disconnect switch. When the cabinet door is open there
is still power on the top side of the disconnect switch.
Some machines are powered by more than one supply
located at different locations. Before performing any repairs or mainte-
nance, lockout and tagout must be installed at all locations
All maintenance and repairs to electrical circuitry should only be per-
formed by a qualified electrician.
Still has power
in OFF position
Electrical
Prior to performing any maintenance, repairs,
cleaning or when clearing jammed debris, you
must disconnect, tag out, or lock out the elec-
trical and air pressure systems. This should be
done in accordance with applicable state and/
or federal code requirements.
Before Conducting Maintenance
Safety First!
1-7
KVAL Architect-DI Operation/Service Manual
CH-1
KVAL advises that you request an on-site state
safety review of your installation of this
machine. This is to ensure conformance to any
additional specific safety and health regula-
tions which apply in your geographic area.
Compliance with Codes and Regulations
Report a Hazard
Before You Report an Accident
Safety First!
1-8 KVAL Architect-DI Operation/Service Manual
CH-1
Safety First!
1-9
KVAL Architect-DI Operation/Service Manual
Lockout Tagout Procedure
This policy is required by OSHA regulation 1910.147 and Cal OSHA’S SB198 ruling of July
1991.
Use the following lockout procedure to secure this machine while it is powered down. During a
lockout, you disconnect all power and shut off the air supply. Be sure to use the tagout guidelines
noted below.
To Lockout the This Machine
1. Assess the equipment to fully understand all energy sources (multiple electrical sup-
plies, air supply and pressure, spring tension, weight shifts, etc.).
2. Inform all affected personnel of the eminent shutdown, and the duration of the shut-
down.
3. Obtain locks, keys, and tags from your employers lockout center.
4. Disconnect power:
a.Turn the disconnect switches on the main electrical panel to the OFF position.
Then pull out the red tab and place a padlock through the hole. Place your tag
on the padlock, as per the tagout guidelines below. (see illustration below).
When multiple people are
working on the machine, each
person needs to have a lock on
the handle in the extra holes
provided.
b.Turn the disconnect switch on the larger high-frequency panel to the OFF
position. Then pull out the red tab and place a padlock through the hole. Place
your tag on the padlock, as per the tagout guidelines below.
CH-1
Safety First!
1-10 KVAL Architect-DI Operation/Service Manual
5. Turn the main air valve to the OFF position and place a padlock through the hole
(see illustration below).
NOTE: Place your tag on the padlock, as per the tagout guidelines below.
6. Once the locks and tags are in place and all personnel are clear, attempt to operate
the machine to ensure equipment will not operate.
7. Maintenance or repairs may now be completed. The person performing the work
must ensure all tools, spare parts, test equipment, etc., are completely removed and
that all guards and safety devices are installed.
8. Before removing the locks and tags, the person who attached them shall inspect the
equipment to ensure that the machine will not be put in an unsafe condition when
re-energized.
9. The lock and tag can now be removed (only by the person(s) who placed them), and
the machine can be re-energized.
10. The tags must be destroyed and the locks and keys returned to the lockout center.
Lockout-Tagout Guidelines
• Place a tag on all padlocks. On a tag, each
operator must put their own name and date.
(These locks are only to be removed by the
person who signs the tag)
• If more than one person is working on the
machine, then each additional person places a
lock and tag on each disconnect.
• Only each operator may remove their own
lock and tag.
CH-1
Safety First!
1-11
KVAL Architect-DI Operation/Service Manual
Important: When many people are all working on the same machine you will need a
multiple lockout device, such as the one shown here.
Follow the P-R-O-P-E-R lockout rule of thumb.
P...... Process shutdown
R ...... Recognize energy type (electrical, pneumatic, mechanical, etc.)
O...... OFF! Shut off all power sources and isolating devices
P...... Place lock and tag
E...... ENERGY: Release stored energy to a zero-energy state
R ...... Recheck controls and test to ensure they are in the “OFF” state
CH-1
Zero-Energy to Start-Up
1-12 KVAL Architect-DI Operation/Service Manual
Zero-Energy to Start-Up
Zero-Energy State to Start-Up to Operating State
Starting the equipment properly is just as important as the lockout/tagout guidelines in terms of
safety.
Start-up Guidelines
The following guidelines below should be followed to start the equipment.
Inspect
The equipment must be inspected for proper adjustment before starting equipment.
Clean Up
All materials and debris must be cleaned up. Any combustible materials or old parts
used during repairs must be cleaned up and/or properly disposed of.
Replace Guards
Replace all equipment guards. If part of equipment cannot be properly adjusted after
start-up with guard on, contact the KVAL Service team. See “Getting Help from
KVAL” on page 1-14.
Check Controls
Confirm that all switches are in the “OFF” position. Please be advised that some com-
ponents of the machine may start automatically when energy is restored.
Remove Locks
Each operator must remove his or her own lock and tag. This will ensure that all oper-
ators are in a safe place when the equipment is started.
Perform Visual Checks
If the equipment is too large to see all around it, station personnel around the area and
sound the personnel alarm before starting the equipment. If your operation is more
complex, your company’s comprehensive safety procedure may involve additional
steps. You will need to ask your supervisor about these procedures. The company’s
lockout procedure should be posted at each machine. On larger or long-term mainte-
nance or installation projects, the company’s procedures must be explained to all new
operators and a copy of the company’s procedures should be posted on-site for the
duration of the work.
The Company’s procedures should also include provisions for safely handling shift
changes and changes in operators or new operators.Comprehensive lockout/tagout
CH-1
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118
  • Page 119 119
  • Page 120 120

Kval Architect DI Owner's manual

Type
Owner's manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI