Newport Brass 6-293 Installation guide

Category
Sanitary ware
Type
Installation guide
INSTALLATION INSTRUCTIONS
AIR GAP
Model No: 6-028
Recommended Installation by a Professional Plumbing Contractor
Note: The use of petroleum base plumbers putty on our products will nullify the warranty. We recommend the use of clear silicone
sealing materials. Recommended deck thru hole Ø 1.25" to Ø1.38
1. INSTALLING FAUCET TO AIR GAP
(See Fig 1)
Note:
Air gap assembly will replace the escutcheon provided with faucet.
· Place the faucet inlet and mounting stud through air gap assembly and mounting surface hole.
· Slide mounting cresent over mounting stud on underside of mounting surface and secure into place with mounting nut.
2. ATTACHING WATER SUPPLY CONNECTION
(See Fig 2)
· Slide the 1/4” OD R/O water supply tube (not included) through compression nut and compression sleeve. Place insert into end
of tube. Insert the end of tube into faucet inlet and thread compression nut onto the end of inlet.
· Connect 3/8” OD black tube (supplied) to drain saddle or drain clamp (not included) in waste drain. The waste drain should be
installed above the p-trap on the vertical section of the tailpiece and be as short and straight as possible to the drain saddle. Keep
this tube on a down hill slope from the faucet, tighten firmly so tube will not pull out of drain clamp. Cut off excess tube if nec-
essary.
Note:
This is a gravity fed line, if there is any bend or dip in the tube, the rinse water will not flow into the drain properly.
Water will back up and come out the air gap hole in the back of the faucet base.
· Connect 1/4” OD black tube (supplied) to Reverse Osmosis filter system drain (not supplied).
3.
TEST INSTALLED FAUCET
· With handle in OFF position, turn on water supplies and check all connections for leaks.
Air gap assembly
Mounting
Cresent
Mounting surface
& hole
Mounting nut
Faucet
Escutcheon
Figure 2
Faucet inlet
Insert
1/4” OD Tubing
(not included)
Compression
sleeve
Compression
nut
Connect to
R/O water supply
(not included)
3/8” OD
black tubing
(included),
connect into
waste drain
1/4” OD
black tubing
(included),
connect to
R/O filter
system drain
Figure 1
!
(949) 417-5207
NWP-6-028 Santa Ana, CA 92705 10/10/2011
www.brasstech.com
6-028 & 6-290
  • Page 1 1

Newport Brass 6-293 Installation guide

Category
Sanitary ware
Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI