Rotary SM65-55 Owner's manual

Type
Owner's manual

This manual is also suitable for

OM-SM-1
Rev.A 5/10/2014
© Rotary Lift, All rights reserved
O
P
E
R
A
T
I
O
N
&
M
A
I
N
T
E
N
A
N
C
E
M
A
N
U
A
L
O
P
E
R
A
T
I
O
N
&
M
A
I
N
T
E
N
A
N
C
E
M
A
N
U
A
L
4 -Post Alignment Lift
SM65-51/55,SM55LT-51
Installer: Please return this booklet to literature package and give to lift owner/operator.
SJ140506
EC Declaration of Conformity
Pursuant to EC Directive 2006/42/EC on Machinery (Annex II A)
Name and address of manufacturer BlitzRotary GmbH
HüngerStr.55
78199Bräunlingen,
Deutschland
Thisdeclarationrelatessolelytothemachineasconguredwhenlaunchedontothecommercialmarket;
partswhichhavebeenaddedbytheenduserand/ormodicationsmadefollowingpurchaseremain
unaffected.UnauthorisedmodicationsorchangestothismachineinvalidatethisDeclaration.
We hereby declare that the machine described below
Productdesignation:4-postlift
Series/typedesignation:
Loadcapacity6500kg SM65-51,SM65-55
Loadcapacity5500/3500kg SM55LT-51
Machine/serialnumber: ...................................................
Yearofmanufacture: 20…
complies with all key provisions of Machinery Directive 2006/42/EC.
Furthermore,themachinecomplieswiththeprovisionsoftheElectromagneticCompatibilityDirective
2004/108/ECandtheLowVoltageDirective2006/95/EC(safetystandardshavebeenmetpursuantto
AnnexI,No.1.5.1oftheMachineryDirective2006/42/EC).
Related harmonised standards:
EN1493:2010 Vehiclelifts
ENISO12100:2010 Safetyofmachinery–basicconcepts
EN60204-1:2006+A12009 Electrical equipment of machines
EN349:1993+A1:2008 Safetyofmachinery–Minimumdistances
ENISO13850:2008 Safetyofmachinery–emergencystops
Related miscellaneous technical standards and specications:
BGG945 Inspectionoflifts
BGR500 Useofworkequipment
BGVA3 AccidentPreventionRegulationrelatingtoElectricalinstallations
and Equipment
Nameofpersonauthorizedtocompilethetechnicaldocumentation:
Mr.Pohl,HüngerStr.55,78199Bräunlingen
Place,date:
Bräunlingen,19.05.2014 ___________________________
 FrankScherer/ManagingDirector
2
Table of Contents
1. Introduction................................................................4
1.1Aboutthisoperatingmanual....................................4
1.2Warningandinformationsymbols...........................4
1.3Intendeduse...........................................................5
1.4Incorrectuse,incorrectbehavior............................5
1.5Internalaccident,healthandsafety,andenvironme-
ntalinformation........................................5
2. Safety ............................... .......................... ....6
2.1Operators..................................................................6
2.2Basicsafetyrequirements........................................6
2.3Permittedaxleloadsandweightdistribution........7
2.4Banonunauthorizedmodicationsoralterations......8
2.5Experts,competentpersons......................................8
2.6Maintenancecontractors,installationstaff................8
2.7Safetyinspectionsbycompetentpersons................9
3. The 4-Post Lift ...............................................10
3.1Overviewofparts.....................................................10
3.2Generalworkow.....................................................10
3.3Workarea,dangerzones.........................................11
3.4Safetymechanisms..................................................11
3.5Controlunit ........................................................15
4. Operation .......................................................16
4.1Emergencystop........................................................16
4.2Switchthemachineon.............................................16
4.3Determinethevehicledata......................................16
4.4Drivingon.................................................................17
4.5Lifting/lowering...........................................17
4.6Driveoff...................................................................18
4.7Switchthemachineoff.............................................18
5. Problems, causes, actions............................19
5.1Troubleshootingbytheoperator..............................19
5.2Troubleshootingbyauthorizedmaintenance
contractors.......................................................................21
6. Authorized lowering .......................................24
6.1 Manuallyloweringtheliftwhenthereisaheight
differenceof>50mm.......................................................24
6.2Levelingtherollingjacks..........................................25
6.3Emergencymanualfunction.....................................25
7. Technical data .................................................27
8. Cleaning ...........................................................28
9. Maintenance and repair ..................................29
9.1Qualicationofmaintenanceandrepairstaff...........29
9.2Maintenanceandrepairsafetyregulations..............29
9.3Maintenancework ...........................................30
9.4Approvedhydraulicoils............................................33
9.5Check,rell,changethehydraulicoil.......................34
9.6Repairwork(Repairs)..............................................35
10.Transport, Storage ...................................37
10.1Transport.................................................................38
10.2Ofoading..................................................................38
10.3Storage....................................................................38
11.Assembly ........................................................39
11.1Assemblysafetyinstructions.................................39
11.2Quickassemblyinstructions..................................39
11.3Sitespecications...................................................40
11.4Installationpreparations..........................................40
11.5Preparetherunways...............................................41
11.6Preparethecrossbeams........................................41
11.7Setupthecables....................................................42
11.8Fastentherunwaystothecrossbeams.................42
11.9Assembletheliftcolumn.........................................42
11.10Attachthelatchbarsandcables...........................43
11.11Attachtheexiblehose.........................................44
11.12Assemblethehydraulicsmodule..........................44
12. Electrical connections ..................................45
12.1Safetyinstructionsforconnectingpowercables....45
3
12.2Connecttheliftpowersupply.................................46
13. Commissioning .............................................48
13.1Testthepneumaticandhydraulicsystem..............48
13.2Testthesafetymechanism.....................................48
13.3Aligntherollingjacks..............................................49
13.4Levelingthemainlift................................................49
14. Wheel alignment kit AK... (optional) ............50
14.1Suppliedparts........................................................50
14.2Assembly................................................................50
14.3Adjustmentwork.....................................................51
15. Disassembly ...................................................52
16. Disposal ..........................................................53
16.1Environmentalproceduresfordisposal...................53
16.2Packaging................................................................53
16.3Oils,grease,andotherchemicalsubstances..........53
16.4Metals/Electronicwaste........................................53
ANNEX
SM65-51/55,SM55LT-51:
Pneumaticcircuitdiagram,wiringdiagrams,
hydrauliccircuitdiagram,sparepartslists
Maintenanceschedule:Instructionsforconducting
visualinspectionsandfunctiontesting
Inspectionlog
4
1. Introduction
1.1 About this operating manual
The post lift conforms to state of the art technolo-
gyandcomplieswiththeapplicableoccupational
health&safetyandaccidentpreventionregulations.
Notwithstanding,improperuseoruseotherthanthat
whichisintendedmayresultinariskoffatalor
physicalinjurytotheuserorthirdpartiesandmay
alsoresultindamagetoproperty.
It is therefore imperative that the relevant people
carefullyreadandunderstandthisoperatingmanu-
al.Readtheinstructionscarefullytopreventincor-
rectuse,potentialhazardsanddamage.Thepost
liftshouldalwaysbeoperatedaccordingtoregula-
tions.
Pleasenotethefollowing:
• Theoperatingmanualmustbekeptnearthelift
andbeeasilyaccessibleforallusers.
• Thisoperatingmanualprovidesinformationon
thepostliftsSM65-51,SM65-55,SM55LT-51
variantwithliftingtable..
• Make sure that you have read and understood
Chapter 2, Safety and also the operating
instructions supplied with the machine.
• Weassumenoliabilityfordamageandopera-
tionalbreakdownswhichmayoccurasaresultof
non-compliancewiththeinstructionscontained
withinthisoperatingmanual.
• Installationandcommissioningoftheliftsis
describedindetailinChapters11to13.
Installation may only be carried out by authorized
installationspecialistsandqualiedelectricians.
• Ifyoushouldrunintodifcultiespleasecontact
aspecialist,ourcustomerserviceorspareparts
departmentoroneofourrepresentatives.
• Illustrationsmaydifferfromthesuppliedversion
ofthemachine.Functionsorprocessestobe
carriedoutremainthesame.
Disclaimer:
Weassumenoresponsibilityforprintingerrors,
mistakesandtechnicalchanges.
Thebrandsandtrademarksmentionedinthis
documentrefertotheirownersortheproducts
thereof.
1.2 Warning and information symbols
Warningsareidentiedbythefollowing
symbols,dependingonthehazardclassication.
Beespeciallyawareofsafetyandhazardswhen
workinginsituationsidentiedbywarningsymbols.
Complywiththeoccupationalhealth&safety
andaccidentpreventionregulationswhichare
applicableinyourcountry.
Risk of death or injury
Direct threat to life and health
ofpeople.Non-compliancemay
leadtodeathorseriousinjury.
Risk of death or injury
Potentialrisktolifeandhealth
ofpeople.Non-compliancemay
leadtoseriousorcriticalinjury.
Risk of injury
Potentiallyhazardoussituation.
Non-compliancemayleadto
minorormoderateinjury.
Damage to property
Potentiallyhazardoussituation.
Non-compliancemayleadto
damagetoproperty.
Other Symbols
INFO symbol
UsefulinformationandTips.
Bullet point:
Forlistswithkeyinformation
ontherespectivesubject.
Handling instructions:
Carry out the detailed steps
insequence.
Handling instructions,warning
Carry out the detailed steps in
sequence.
DANGER
WARNING
CAUTION
ATTENTION
i
.
1.
5
1.3 Intended use
The post lift may only be used:
Inindoorareasforliftingunoccupiedmotorvehi-
cles.
Forliftingvehicleswithamax.loadcapacityof
6500kg,5500kg,accordingtotheliftvariant.
Thepermittedloadcapacityoftheliftingtableis
max.3500kg.
Iftheweightisdistributedcorrectly.Bydefault,
the load should be centered in the direction of
motion.Ifthemainload(e.g.engine)ishowever
atthefrontortheback,thefollowingapplies:
mainlift:atfrontmax.2/3,
atback1/3ofloadorviceversa.
forliftingtables:atfrontmax.3/5,
atback2/5ofloadorviceversa.
Withcorrectlyaligned,adjustablerunways.The
vehicle must be approximately centered on the
tworunways.
InaccordancewiththetechnicaldatainChapter
7,intechnicallysoundcondition.
1.4 Incorrect use, incorrect behavior
Incorrectbehaviorpresentsaresidualrisktothe
lifeandhealthofthepeopleworkingintheliftarea.
The manufacturer assumes no liability for
damageresultingfromuseotherthantheintended
purposeandfromincorrectbehavior.
The following is prohibited:
Climbingontoorridingonthepostliftortheload.
Liftingwhentherearepeopleinthevehicle.
Lifting/loweringwhenpeopleoranimalsareinthe
dangerzone,inparticularbelowthelift.
Jerkyliftingorlowering.Donotcausetheliftto
vibrate.
Throwingobjectsontoorunderthelift.
Liftingavehicleattheincorrectpick-uppoints
whenusingaliftingtable.
Liftingaloadononlyonerunwayofthemainlift
ortheliftingtable.
Loiteringorworkinginthedangerzonewhenitis
notloweredintothelockposition(latchbars).
Activatingthemachinewhensafetyequipmentor
mechanismsarenotinplace(Example:locking
latchesarenottted).
Drivingontotheliftwhentheadjustablerunways
areincorrectlyaligned.
LiftingloadsnotlistedinChapter1.3.
Liftingvehiclescontaininghazardousgoods.
Operatingoutdoorsorinworkshopsatriskfrom
reorexplosion.
Washingcarsonthepostlift.
Modicationsofanykind.
1.5 Internal accident, health and safety, and
environmental information
Thisoperatingmanualdoesnotincludetheope-
ratinginstructionswhichneedtobedraftedbythe
userofthepostlift.
Theinternaloperatinginstructionsregulateacti-
onswithinthecompanyforthepreventionofaccid-
ents,andriskstohealth&safetyandtheenvironm-
ent.
These also include actions in the case of an
emergency,rstaidmeasuresetc.
6
2. Safety
2.1 Operators
Thepostliftmayonlybeoperatedwithoutsuper-
visionbypersonswho:
Are18yearsoldandabove.
• Arefamiliarwiththebasicregulationsonhealth&
safetyandaccidentprevention.
• Havebeentrainedtohandleandoperatethepost
lift.
• Haveproventheirabilitytodosotothecompany.
• Havebeenexpresslyappointedinwritingtoope-
ratethelift.
• Havereadandunderstoodtheoperatingmanual.
2.2 Basic safety requirements
• Onlyoperatethepostliftafteraspecialisthasce-
tiedintheinspectionlogthatithasbeencorrec-
tlysetup.
• Alwaysfollowtheoperatinginstructions(labelson
thepostlift).
• Ifseveralpeopleworkonthepostlift,asupervis-
ormustbeappointedbythecompany.
• Thepostliftmayonlybeoperatedintechnically
soundconditionwithregardtosafetyandwithall
safetymechanismsinplace.
• Thecontrolboxorcontrolunitmayonlybeopen-
edbyaqualiedelectrician.
• Safetyinspectionsmustbeconductedregularly,
atleastonceannually.
• Ifsignsofadefectappear,immediatelyshut
downthepostlift,informasupervisorandcontact
thecustomerserviceifnecessary.
• Keeptheworkareacleanandfreeofoil,grease,
andcontamination.
• Beforelifting/lowering,checkthattheacoustic
alarm(buzzer)works.
• Beforestandingorworkinginthedangerzone
underneaththemainlift/liftingtable,loweritinto
thelockposition(latchbars)usingthe"Down“
button.
• Theremustbenoobstaclesinthepathofthe
mainliftortheliftingtables.
• Alwaysmonitortheloadcarefullywhenliftingand
lowering.
• Alwaysstopthevehiclessafely,centeredonthe
runways.Securethevehicleagainstrollingwith
wheelchocks.
• Forliftswithliftingtables:
Alwaysliftthevehiclewiththeliftingtableonthe
pick-uppointsapprovedbythevehiclemanufac-
turer.Liftitforashortdistanceandcheckthat
thepick-uppointsaresecure.Onlythencanthe
vehiclebemovedtotherequiredheight.
• Takestepsagainsttrafcintheareaofthepost
lift.Donotparkothervehiclesinthedangerzone.
• Donotloadmainliftsandliftingtablebeyondthe
permittedcapacity,complywiththepermittedaxle
loadsandloaddistributioninaccordancewith
Chapter2.3.
• Whendisassemblingorttingheavyvehicle
parts,watchoutfordangerousshiftsinthe
weightbalance,inparticularwhenthevehicle
issupportedbyliftingtable.Securethevehicle
beforehand.
• Alwaysfullylower,switchoffandsecuremain
liftsandliftingtablestopreventunauthorized
useaftercompletionofwork(turnmainswitchto
"OFF“andlock).
• Followthemaintenanceandserviceschedule,
recordperformanceofmaintenanceandservicing
(Chapter9).
• Installation,maintenanceandservicingmay
only be carried out by authorized specialists
(maintenancecontractors)(Chapter9).
• Onlyqualiedelectriciansmayworkontheelec-
trics.
• Onlytrainedpeoplewithknowledgeofhydraulics/
pneumaticsmayworkonhydraulicorpneumatic
equipment.
• Appropriatepersonalprotectiveequipment
mustbewornwhenworkingintheareaofthe
liftinaccordancewiththeapplicablehealth&
safetyandaccidentpreventionregulations.For
example,protectivegloves,protectivegoggles,
safetyshoes.
• Onlyoriginalsparepartsfromthemanufacturer
maybeused.
• The lift must be inspected by a specialist after
repairinganysupportingparts.
7
2.3 Permitted axle loads and weight
distribution
Beforeliftingthevehicle,youmustensurethatthe
weightdistributioniscorrect.
Whentheweightdistributioniscorrect(default
position in direction of motion) the main load is
locatedatthefront(e.g.engine).
Risk of injury through toppling of
the vehicle when incorrectly loaded.
Complywiththepermittedloadcapacityasin
Fig.1and2.
Complywiththepermittedweightdistribution
asinFig.1and2.
Complywiththeapproveddistancesbetween
pick-uppointsasinFig.3.
Figure 1: SM55LT-51 (with lifting table)
Load capacity
•Mainlift 5500kg
Liftingtable 3500kg
Permittedweightdistribution
•Mainlift frontmax.2/3:
F1=max.3670kg
backmax.1/3:
F2=max.1830kg
Liftingtablefrontmax.3/5:
F1:2100kg
backmax.2/5:
F2:1400kg
Figure 2: SM65 -51/55
Load capacity
Mainlift 6500kg
Permittedweightdistribution
frontmax.2/3:
FA1=max.4330kg
backmax.1/3:
FA2=max.2170kg
Figure 3: Approveddistancebetweenpick-up
pointsonliftingtable
•Length max.2.1m
Width min.1.4m
WARNING
F1
F2
1
3
FA1
FA2
2
max 2.1m
min 1.4m
8
2.4 Ban on unauthorized modications or
alterations
Unauthorizedmodicationsandalterationstothe
postliftarenotpermittedforsafetyreasons.
Theoperatingpermitshallalsobedeemednull
andvoid.
The Declaration of Conformity also becomes null
andvoid.
2.5 Experts, competent persons
Thepostliftmustbeinspectedaftercommiss-
ioningandatregularintervals(aftermax.oneyear),
aswellasafterdesignmodicationsorrepairofsup-
portingparts.Inspections may be carried out by
the following people:
Certied expert
Thesearepeoplewhohavespecialistknowled-
geintheeldofliftsbasedontheirprofessional
trainingandexperience.
Expertsshouldbeabletoinspectliftsandmake
anexpertassessmentthereof.
 TÜVexperts,specialistengineersfromthemanu-
facturerorself-employedspecialistengineerscan
beusedforinspections.
Competent persons
Thesearepeoplewhohaveadequateknowledge
intheeldofliftsbasedontheirprofessionaltraining
andexperience.
Theyaresufcientlyfamiliarwithhealth&safety
andaccidentpreventionregulationsaswellaswith
lifttechnologyinordertobeabletoassessthe
occupationalhealth&safetycomplianceoflifts.
2.6 Maintenance contractors, installa-
tion staff
Maintenance,servicingandinstallationwork
may only be done by companies or specialists
authorizedbythemanufacturer.
Thesepeopletrainedintheeldofliftsareco-
mpetentpersons,whoaretrainedformaintenance
aswellasrepairwork.
Acompetentpersonisapersonwhohasadequ-
ateknowledgebasedonhisprofessionaltraining
andexperienceandisalsofamiliarwithkeyregul-
ationssothathe:
Canassesstheworkassignedtohim,
Canrecognizepotentialrisks,
Cantakeactionsrequiredtoeliminatetherisk,
Andhastherequiredknowledgeofrepairand
tment.
Thespecialistknowledgeofacompetentperson
must enable him to be in a position to
Readandfullyunderstandcircuitdiagrams,
Fullyunderstandthecontextwithparticularregard
toanyinstalledsafetyequipment.
Possessknowledgeofthefunctionanddesignof
systemcomponents.
Simplefaultsonthepostliftmayberectiedby
operatingstaff.
Intheeventofamoreseriousfault,contactan
authorizedmaintenancecontractor.
9
2.7 Safety inspections by competent
persons
Safetyinspectionsmustbecarriedouttoguar-
anteethesafetyoflifts.
Safetyinspectionsshouldbecarriedoutinthe
followingcases:
Beforeinitialoperation,afterinitialinstallation.
Usetheform"Initialsafetyinspectionbeforein-
stallation“.
•Afterinitialoperationatregularintervals,butat
leastonceayear.Usetheform"RegularSafety
Inspection“.
Afteranydesignmodicationtopartsofthelift.
Usetheform"UnscheduledSafetyInspection“.
Theinitialsafetyinspectionaswellasthe
safety inspections must be carried out by a
competent person
.Werecommendthat
you also perform maintenance in the course
oftheinspection.
Unscheduledsafetyinspectionsandspec-
ialmaintenanceworkarerequiredinthe
eventofdesignmodicationstothelift
(ttingadditionalparts).Thesafetyinspe-
ction must be carried out by a competent
person.
UsetheformsuppliedintheAnnexcon-
taininglistsforcarryingoutsafetyinsp-
ections.Pleaseusetherelevantformand
stapleittothemanualaftercompletion.
i
i
i
10
3. The 4-Post Lift
3.1 Overview of parts
Figure 4: Example of a 4-post lift with lifting
table (SM55LT-51)
1.Standardliftcolumn
2.Liftcolumnwithcontrolunit
3.Automaticrampchock
4.Crossbeams
5.Powerunit
6.Controlbox
7.Compressedairunitwithlubricator(option)
8.Baseplate
9.Fixedrunway
10.Drive-onramp
11.Latchbar
12.Slaverunway
13.Slipplate
14.Liftingtable(SM55LTonly)
15.Fillerplate
T Nameplate
3.2 General workow
Afterdeterminingthevehicledataandaligning
therunways,thevehicleisdrivenontothemain
liftandsecuredagainstrolling.
Thevehicleisraisedtothedesiredheightwith
themainlift.
Withoptionalliftingtable:
Ifaliftingtableisused,themanufacturer-
approvedpick-uppointsonthevehicleare
selectedandthematchingsupportsareplaced
underneath.Afteradjustingtheselectoron
thecontrolunitandcheckingthattheweight
distributioniscorrect,thevehicleisliftedbythe
liftingtable,andthelockinglatchthenlocks.
Onlythencanworkcontinueinthedangerzone.
Mainliftsandliftingtablearettedwithapneu-
maticlockingmechanism.
Iftheliftlowersevenslightly,forsafetyreasons
itautomaticallymovesintothelatchbar(locking
latch).
Aftercompletionofthework,thevehicleislow-
eredagaintothegroundanddrivenoff.





7

4
11
3.3 Work area, danger zones
Figure5:Workarea,dangerzones
1.Controlarea
2.Workareaanddangerzone
3.Vehicleoverhang
Riskofinjuryinthedangerzoneofthe
post lift in the event of incorrect
behavior.
Onlyremaininthedangerareaifyou
have been trained and briefed and
assignedtothearea.
Keeptheworkareaclean.
Keepescaperoutesclearsothatyou
canleavethedangerzonequickly
andsafelyintheeventofanemer-
gency.
3.4 Safety mechanisms
See gures 6 ... 13
Safety mechanisms protect both
people and lift. They must not be
disabled!
Postliftdangerzonesareprotectedby
safetymechanisms.
Functionandconditionofthesafetymecha-
nismsmustbecheckeddaily!
Ifsafetymechanismsaretriggered,thepost
liftstopsimmediately.
Ifsafetymechanismsaredefective,thepost
liftmustbetakenoutofuseimmediately
andthemainswitchlockedwithapadlock.
Any further use must be prevented until the
machineisfullyrepaired!
Ifthepostliftismovedortakenoutofusefor
longperiods,checkthesafetymechanisms
beforere-commissioningandrepairifnec-
essary.
WARNING
WARNING
5
min 2m
min 0.8m
min 0.8m
min 0.8m
12
1. Buzzer
Acousticalarm.Sounds:
•Whenloweringthemainlift<120mm
(footprotection).
•Whenloweringtheliftingtable(handand
ngerprotection).
•Whentroubleshooting(lifting/loweringusing
theoverrideswitch,forheightequalizingor
duringemergencymanuallowering).
2. Lockable main switch
"ON“setting:Postliftreadyforuse.
"OFF“setting:Postliftoutofuse.Themains
voltageisstillpresentinsidethecontrolbox.
Switchingoff(OFF)immediatelystopsany
movementofthepostlift(=emergencystop).
3. Locking latch on each lift column
Thelockingmechanismconsistsofalatchbar
androllerwithcamshaft.Latchbarwith100mm
lockinglatchnotches.
If a fault occurs in the hydraulic system or if
thecablebreaksorbecomesslack,thebrake
mechanismisactivated.Thecamispressed
againstthelatchbarthroughapowerfulspring
action.Inadditionalockcamlatches(viaan
airpiston)intothelatchbar.Allupordown
movementsstopimmediately.Anyfurtherlow-
eringisprevented.
4. Locking latch on both lifting table
Thelockingmechanismconsistsoftoothed
lockbars.Onreleasingtheliftorlowerbutton,
theupperbracketswingsdown.Thelockbars
engage(ratchets).
5. Foot protection switch on the lift column with
control unit
Deactivatestheloweringprocessataliftheight
of120mm(footprotection,otherwiseacrushing
orshearinghazardexists).
Youcanonlylowerfromthisheightbypressing
the"Lowerindangerzone“button(1-button
safetyswitch).
6
7
8
9
13
6. Pressure control valve
Thepressurecontrolvalve(arrow)isfactory
settoca.210bar.
Preventsasuddenloweringoftheliftintheeve-
ntofaleakinthehydraulichose(loweringspeed
=max.1.5xdefaultspeed).
7. Lowering valve (emergency release) and
emergency manual valves
•Pos.6.1Loweringvalveforemergencyrelease
ofthemainlift(SM65lift).
•Pos.7:Emergencymanualvalvefor
mainliftandrollingjack.Fitteddifferentlyacco-
rdingtovariant.Beforeusecheckassignmentto
mainliftandliftingtable.
Duringapowerfailurethevalvescloseand
stopanymovement.
8. Broken cable and slack cable switch
•Pos.8.1:Brokencableswitch:
Thisswitchisactivatedifthecableisbroken.
Allmovementofthepostliftstopsimmediately.
Thecontrolbuttonswillnotfunction.Consulta
competentpersonforrepair.
Pos.8.2:Slackcableswitch:
Thisswitchisactivatedwhenthecableistoo
slack.Allmovementofthepostliftstopsimm-
ediately.TheDownbuttonwillnotfunction.The
Upbuttonwillhoweverfunctioninorderthatthe
cablecanbepulledtightagainbyraisingthelift
slightly.
6
7.1
6.1
7.3
7.2
10
11
12
i
Lock nut
14
9. Photo sensor for rolling jack runways:
Guardsagainstheightdifferencesof>50mm
betweentherunways
Stopstheloweringorliftingprocessifthedif-
ferenceinheightbetweenthetworunwaysis
greaterthan50mm.
9
13
15
3.5 Control unit
All movement of the lift stops immediately
whenyoureleaseapressedbutton.
Figure 14: Control unit in the lift column
1.
Selector, onlyforSM55LTvariantwithlifting
table:
Leftsetting:Mainliftactive
•Rightsetting:Liftingtableactive
2. UP button
Formainliftsorliftingtables.
Functionsonlyifthebuttonispressed.
Postlift/liftingtablerunwaysmoveup.
3.On/Off switchforoptionallighting.
4. DOWN button
Formainliftsorliftingtables.
Functionsonlyifthebuttonispressed.
Themainliftorliftingtablerunwaysmoveup
for around 2 seconds to release themselves
fromthelockinglatches.
Runwaysmovedownuntiltheautomaticshut-
offisactivated120mmabovetheground
(footprotection,otherwisethismaypresent
acrushingandshearinghazard).The lower-
ingprocessstops.
5. LOCK button
Formainliftsorliftingtables.
Functionsonlyifthebuttonispressed.
Mainlift:Locksthecrossbeamsinthelatchbars
ofthefourliftcolumns.Keepbuttonpresseduntil
allcrossbeamslocksecurelyintothelatchbars.
Liftingtable:Lowersbothrunwaysontothetoot-
hedlockbars(ratchets).
Keepbuttonpresseduntilbothrunwayslockse-
curelyintothelatchbars.
6.DOWN button in the danger zone below 120
mm
•Formainlifts.
Onlyfunctionsafterthe120mmautomaticshut-
offhasreactedtoDOWN(4).Therunwayscan
thenbeloweredcompletelyifonlybutton(6)is
pressedatthattime.Abuzzersoundsthrough-
outtheentireloweringprocess.
7. Buzzer
Acousticalarm.Sounds:
•Whenthemainliftisbeinglowered<120
mm (Foot protection)
•Whentheliftingtableisbeinglowered(hand
andngerprotection).
•Whentroubleshooting(lifting/loweringusing
theoverrideswitch,forheightequalizingor
duringemergencymanuallowering).
8.Lockable main switch
"ON“setting:Postliftreadyforuse.
"OFF“setting:Postliftoutofuse.Themains
voltageisstillpresentinsidethecontrolbox.
Switchingoff(OFF)immediatelystopsany
movementofthepostlift(=emergencystop).
14
i
i
16
4. Operation
Risk of injury when lowering the
load onto objects below the lift
or the vehicle. Vehicle may topple
over.
Beforelowering,youmustremoveallobjects
fromunderneaththelift.Thisappliesinparti-
culartochassisstandsandauxiliaryjacks.
Alwaysmonitortheliftandvehiclecarefully
whenliftingorlowering.
Risk of fatal injury if load is incor-
rectly distributed on both lifting
tables.Vehicle may topple over.
Checkthataxleloadsandweightdistribution
arecorrectinaccordancewithChapter1.3.
Securetheloadwithadequatelysizedchas-
sisstands.
Risk of fatal injury in the event of
malfunction or damaged parts.
Shutdownpostlift.Todoso,setthemain
switchto"OFF“andlockitwithapadlock.
Consultacompetentperson.
When working with the post lift, make
sure you follow the instructions listed
in Chapter 2. Safety.
4.1 Emergency stop
1.Toperformanemergencystop,setthemainswi-
tchtoOFF("OFF“setting).Themainliftorthelift-
ingtablestopsimmediately.
4.2 Switch the machine on
1.Switchonthepowersupplywiththemainswitch
("ON“setting).
2.Checktheoperationalstatusofthemainliftand
theliftingtable.
3.Checkthefunctionalityofthecontrolbuttons.
4.Checkthefunctionalityofthebuzzer.Todoso
raisetherunwaysslightlyfromthebottompositi-
onandloweragain.Abuzzermustsoundwhen
lowering.
5.Lowerthemainlift(includingdrive-onramps)
liftingtablecompletely.
6.Keepworkareaandrunwaysclean(noobjects
lyingaround,nogrease,nooil).
4.3 Determine the vehicle data
1.Determinetheweightdetailsandthevehicle
height(seevehiclelicense).
Checkthevehiclecenterofgravity,check
theloadandbody.Checkthepermitted
weightdistributiononthelift.
2.Comparedetailswiththenominaldataofthelift.
3.Determinetheapprovedpick-uppointsaccordi-
ngtothemanufacturersspecications.
4.Ifthevehicledataisnotavailable,askthesup-
ervisor.
DANGER
DANGER
DANGER
i
i
17
4.4 Driving on
1.Ifrequired,settheadjustablerunways(Fig.15,
PosR)accordingtothewidthofthevehicle.To
movethem,loosen2runwayboltsoneachofthe
twocrossbeams,movetherunwaysinparallel,
thentightentheboltsagain.
2.Drivethevehicleontotherunwayscenteredon
bothsides(havesomeoneguideyouon).Make
surethatthewheelsdonothangovertheedges
oftherunways.
3.Applythevehiclehandbrake,getout,andclose
allvehicledoors.
4.Securethevehiclewithchocksagainstrolling.
5.Placesupportsorpadsatthe4approvedpick-up
points.Onlyusesupportsorpadsapprovedby
themanufacturer.Thesemustbecorrectlyand
stablypositioned.
6.Takesafetymeasurestoensurethatneither
people nor loads can collapse or fall and loads
cannotslip.Makesuretheweightdistributionis
correct.
4.5 Lifting/lowering
Risk of injury in the post lift zone.
Donotputpeopleatriskwhentheliftorlift-
ingtablemoves.
Alwaysmonitorthedangerzoneswhenlifting
orlowering.
No-onemuststandinthetrafczoneofthe
lift.
Danger of crushing and shearing of
limbs (foot, toe, nger etc.). Possib-
le uncontrolledmovement when lo-
wering in the danger zone (below
the runways, cross beams) or when
moving the lifting table scissors.
Nopartsofthebodybelowtherunways,cro-
ssbeams,orintherollingjackscissorszone
Abuzzersoundsduringtheloweringprocess
inthedangerzone<120mm.
Donotplaceobjectsbelowtheliftorthelifti-
ngtable,
Damage to high vehicles when LIF-
TING
and LOWERING. Vehicles
which are too high may collide with
the ceiling.
EvenwhenLOWERING,themainliftorlift-
ingtablebrieymovesup(outofthelatches).
Monitortheprocessconstantly.
Makesurethatthevehicledoesnotcollide
withtheceiling.
Theliftingorloweringprocessmustbecarri-
ed out uniformly so that the load does not
changeposition.
Ifthevehicledoesnotremainstable,endall
movementimmediately.Thenturnthemain
switchto"OFF“andlockit.Thevehiclemust
nowbeloweredbyanauthorizedcompetent
person.
DANGER
WARNING
ATTENTION
15
i
i
18
Raising the lift
1.Settheselectortotheleft(mainlift).
2.LiftthemainliftslightlywiththeUPbutton.
3.Checkthesteadinessandpick-upstabilityofthe
vehicle.
4.Onlystarttoliftsmoothlyandtotherequired
heightifthevehicleisstable.
Destruction of the hydraulic pump.
Operating error, when the main lift
is moved for long periods to its full
rise.
Onlymovethelifttojustbelowitsfullrise.
Thenreleasethebutton.
5.Lowerthemainliftwiththe"Lock“buttontothe
lockposition.
Complywithoccupationalhealth&safetyand
accidentpreventionregulations.Usesafety
standswhendisassemblingheavyparts.
Checkthatweightdistributioniscorrect.
Raise the lifting table
6.Settheselectortotheright(liftingtable).
7.Checkthepositionofthesupportsorpadsand
correctifnecessary.
8.LiftthevehicleslightlywiththeUpbutton.
9.Proceedasdescribedabove(Pos.3to5).
Lifting with a slack cable
Ifthemainliftisontheskew,theslackcable
switchactivatesastop.Onlytheliftfunction
isstillactive.Thebuzzersoundscontinuously
throughoutthelifting.Theliftfunctionisalso
lockedifthecablebreaks.
Ifthecableisslack,presstheUpbutton.
Raise the lift so that all 4 cables are
tensioned.
Lowering the main lift or lifting table
1.Removeallobjectsintheliftandliftingtable
zone,inparticularundertheliftandliftingtable.
2.Settheselectortothedesiredposition.
3.UsingtheDownbutton,steadilylowertheliftor
theliftingtableuntiltheautomaticshut-off(120
mm)isactivated.
Todoso,rstmovetherunwaysupforaround
2secondstoreleasethemfromtheratchets.
Onlythenmovetherunwaysdownuntiltheau-
tomaticshut-offisactivated.Theloweringproc-
essstops.
Whenlowering,makesurethatthemainlift
lowerssmoothly.Ifnotthenstoptheprocess.
Ifthemainliftisskew,moveitupwardsslig-
htlysothatthecablespulltight..Thenconti-
nuetheloweringprocess.Ifthisdoesnot
work,consultacompetentperson.
4.Tocompletelylowertheliftpress"Lock“and
"Lowerinthedangerzone“together.
Move the main lift or liftingtablerighttothebot-
tomposition.Makesurethatthedrive-onramps
arefullylowered.
4.6 Drive off
1.Removechocks.
2.Carefullydrivethevehicleofftheliftandaway
fromtheliftarea(havesomeonetoguideyou).
Indoingso,makesurethatthewheelsneverrun
overtheedgeoftherunwaysoralongsidethem.
4.7 Switch the machine off
1.Disconnectthepowersupplywiththemainswitch
("OFF“setting)andlocktheswitchwithapadlock.
i
i
i
i
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58

Rotary SM65-55 Owner's manual

Type
Owner's manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI