Shine Company 4212AQ Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Shine Company 4212AQ Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
PARTS INCLUDED:
How To Assemble Your Bench
TOOLS NEEDED: Philips screwdriver, power drill optional
CAUTION: When assembling bench, DO NOT completely tighten the bolts and nuts
until all the parts & holes are properly aligned.
(REV. 9/2016)
6 PCS
Lag Bolts
(6 x 60 m/m)
6 PCS
Barrels
Right Armrest
A
Left Armrest
B
B
B
B
B
Seat Back
C
C
C
Seat
D
D
D
D
Step 2:
Attach Left Armrest to Seat Back.
Step 3:
Repeat same on the other side.
Step 1:
Attach Left Armrest to Seat.
Step 4:
Place 2 barrels into holes found on the Seat Back. Remove any debris from holes.
Step 6:
Place 4 barrels into holes found under the Seat. Remove any debris from holes.
B
B
C
C
C
C
D
D
D
D
A
A
A
A
Left
Left
Right
Right
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Lag Bolt
(6 x 60 m/m)
1 PC Barrel
Barrel
Barrel
1 PC Barrel
Barrel
Step 7:
Use 2 PCS of Lag Bolts (6 x 60 m/m) to attach Right Armrest into Seat.
Repeat same on the other side. Tighten all bolts into barrels.
Step 5:
Use 1 PC Lag Bolt (6 x 60 m/m) to attach Right Armrest into Seat Back.
Do not tighten. Repeat same on the other side.
/