NextStone CL-OC-TTB-4 Installation guide

Type
Installation guide

This manual is also suitable for

COUNTRY LEDGESTONE OUTSIDE CORNER
Step 1
Metal Starter Strip - Determine at what height above grade level you want
the panel to sit on. Measure up 2 ¾" from this point and strike a level line.
Aach the top of the starter strip on this line. End the strip 2" from each side
of the corner. (Fig. 1)
Step 2
Set the Ledgestone outside corner piece against the
corner and down against the starter strip. Use the screw
guides and place at least 3 screws along the tongue.
(Fig. 2)
Place 2 screws in the right lap side of the panel where
indicated. (Fig. 3)
When making mulple courses, alternate the corners
le and right to give proper oset and stagger to joints.
(Fig. 4)
Step 3
Aach the panels working out from each side of the
corner as previously described. (Fig. 5)
Note: There are 4 paerns of the Ledgestone Outside Corner. 2 Le paerns and 2 right paerns.
Check for numbers on the backside of the piece. They are numbered 1 through 4. Alternate le and
COUNTRY LEDGESTONE CORNER INSTALLATION
All products must be allowed to acclimate; removed from boxes and stored at at the
installaon site for a minimum of 48 hours or unl properly acclimated prior to
installaon. Heat and moisture cause expansion. Best results are obtained by installing
cool, dry product. NextStone does not warrant against gapping caused by expansion
and contracon.
Manufacturer does not warrant against gapping caused by
expansion and contracon.
To validate warranty, product MUST be registered. Register this product at:
WWW.StoneSidingWarranty.com
Fig. 1
Fig. 3
Fig. 4
Fig. 5
Fig. 2
Screw Points
COLUMN WRAP INSTALL
COUNTRY LEDGESTONE COLUMN WRAP
1) Fir out the desired column to 13 ¾" x 13 ¾".
2) Starter Strip- Determine the height above ground the boom of the column
should be. Measure up 2 ¾" from this point and strike a level line. Aach the
top of the starter strip on this line. Level and aach starter strip on each face,
stopping 2" from each corner. (Fig. 6)
3) Each box contains 2 le (L-2,L-4)and 2 right corners(R-1, R-3). 2 boxes are
needed per 2 courses. Use 4 right pieces for 1 course and 4 le pieces for the
next course. Dry t corners R-1, R-3 and R-1, R-3. Slide down onto the starter
strip and aach all pieces where indicated on the screw hem. (Fig. 7)
4) Aaching the Corners- There are 3 screw points on the long side of the corner, and 2
on the shorter end. Make sure to use 5 screws per corner. Hold the boom edge of corner
snug against the substrate while placing the screws to prevent over ghtening of the
screw hem. This prevents the boom edge from kicking out. (Fig. 8)
5) Dry t corners L-2, L-4 and L-2, L-4. Slide down and aach as described above.
6) For the next course, use corners R-3, R-1 and R-3, R-1 to prevent paern repeon.
Finally use corners L-4, L-2 and L-4, L-2 for the 4th row. Connue to alternate as needed
unl the desired height is achieved. (Fig. 9)
Note to Installer: Do not over ghten the screws when aaching the corner pieces.
When over ghtened, the corner piece will kick outat the boom and create a gap. If
the gap is present, pull the corners together to minimize the gap, then face screw through
the female tongue, through the male base plate, and into the substrate. Use a 3" deck
screw for this purpose. (Fig. 10) Use caulk to ll screw head and
touch up paint for a professional nish.
The 18" Post Cap is designed to t over the LedgeStone Column if
the top course of corners ends with the screw hems aached or
with the screw hems removed.
Screw Aachment: Drive one screw per side through the boom
lip of the cap all the way into the substrate. Be Careful to angle the
Screws so they dont run through the top of the cap. Do not overdrive
screws.
Screw Placement
2nd Course
1st Course
If the top course
ends with the screw
hem aached:
Place adhesive in
each corner of the
cap and secure
If the top course
ends with the screw
hem aached:
Place adhesive on
each of the four
inner edge
Adhesive
Points
Adhesive
Points
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Fig. 10
Final Look
  • Page 1 1
  • Page 2 2

NextStone CL-OC-TTB-4 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI